Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Existing Infrastructure Adjustment

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Pasco County in Florida involves the adjustment of existing inlets, valves, manholes, and utility structures for prime contractors working on trail projects. The scope of work includes raising or lowering utility structures to ensure they are flush with the final grade, utilizing concrete, reinforcing steel, and galvanized grates that meet ASTM A123 standards. Specifically, the project requires the use of Alt. G grates and frames, with a delivery requirement that infrastructure be adjusted to within 0.05+ feet of the specified plan grades. The contract is categorized under NAICS code 238990. The solicitation was posted on November 20, 2026, with a response deadline of January 5, 2027. There is no specified set-aside status for this opportunity.

General Info

Subcontract for adjusting utility structures to final grade for Pasco County trail projects.

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of IFB-KM-27-032.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ORANGE BELT TRAIL PHASE 1 (LITTLE ROAD TO COOL SPRINGS PARKWAY)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 45 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom ORANGE BELT TRAIL PHASE 1 (LITTLE ROAD TO COOL SPRINGS PARKWAY)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Pasco County
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Pasco County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Adjusts existing inlets, valves, manholes, and utility structures for prime contractors on Pasco County trail projects. Raises or lowers utility structures to be flush with final grade using concrete, reinforcing steel, and galvanized grates per ASTM A123. Uses "Alt. G" grates and frames. Delivers infrastructure adjusted to within 0.05+ feet of plan grades.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

44 minutes ago

DEADLINE

in 9 days
View Details

More opportunities from Florida → Pasco County

Same awarding agency

NAICS: 237310
New
SLED
ORANGE BELT TRAIL PHASE 1 (LITTLE ROAD TO COOL SPRINGS PARKWAY)
Solicitation # IFB-KM-27-032
The Pasco County Board of County Commissioners is soliciting bids for the Orange Belt Trail Phase 1 project, which involves the construction of a 12-foot-wide trail along the south side of Trinity Boulevard. The project spans approximately 3.08 miles, starting from the existing sidewalk at the southwest corner of the Trinity Boulevard and Little Road intersection and connecting to the existing trail at the intersection of Trinity Boulevard and Cool Springs Parkway. The scope of work includes the construction of the trail and the adjustment of existing infrastructure, such as inlets, valves, and manholes, to be flush with the final grade. All work must be performed according to plans created by Coastal Design Consultants, Inc. and must conform to Florida Department of Transportation (FDOT) and Pasco County Public Infrastructure Branch specifications. The contract will be awarded to the lowest responsive and responsible bidder, with a local business preference allowing a local vendor to match the lowest price if they are within 10 percent (for bids up to $1,000,000) or 5 percent (for bids over $1,000,000) of the lowest bid. Bidders must be properly licensed and certified, and the successful contractor is required to provide performance and payment bonds, insurance certificates, and a quality control system. Submissions must be uploaded via the Bonfire portal by January 5, 2027, at 1:30 p.m. ET. There is no set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS