Pipeline Construction

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for pipeline construction involves the installation of approximately 35,040 linear feet of 24-inch reclaimed water main for Pasco County projects. The scope of work includes excavation, pipe laying, bedding, and backfilling to connect the Shady Hills WWTF to the Hudson RRIBs. The successful contractor must provide heavy equipment operation and demonstrate specific experience with large-diameter water mains to deliver a fully installed and pressure-tested system. The project is categorized under NAICS code 237110 and is managed by Pasco County in Florida. There is no specific set-aside status designated for this opportunity. Interested parties must adhere to the response deadline of December 22, 2026.

General Info

Subcontract for installing 35,040 feet of 24-inch reclaimed water main in Pasco County.

Documents

This scope was carved out of RSQ-KM-27-030.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

NEW 24” RECLAIM WATERMAIN BETWEEN HUDSON RAPID RATE INFILTRATION BASINS (RRIB) AND SHADY HILLS WASTEWATER TREATMENT FACILITY (WWTF)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 31 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 8 documents on the prime contractFrom NEW 24” RECLAIM WATERMAIN BETWEEN HUDSON RAPID RATE INFILTRATION BASINS (RRIB) AND SHADY HILLS WASTEWATER TREATMENT FACILITY (WWTF)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Pasco County
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Pasco County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs approximately 35,040 linear feet of 24-inch reclaimed water main for prime contractors on Pasco County projects. Performs excavation, pipe laying, bedding, and backfilling to connect the Shady Hills WWTF to the Hudson RRIBs. Requires heavy equipment operation and experience with large-diameter water mains. Delivers an installed and pressure-tested 24" reclaimed water main.

Similar Contracts

Same NAICS industry code

More opportunities from Florida → Pasco County

Same awarding agency

NAICS: 237310
New
SLED
ORANGE BELT TRAIL PHASE 1 (LITTLE ROAD TO COOL SPRINGS PARKWAY)
Solicitation # IFB-KM-27-032
The Pasco County Board of County Commissioners is soliciting bids for the Orange Belt Trail Phase 1 project, which involves the construction of a 12-foot-wide trail along the south side of Trinity Boulevard. The project spans approximately 3.08 miles, starting from the existing sidewalk at the southwest corner of the Trinity Boulevard and Little Road intersection and connecting to the existing trail at the intersection of Trinity Boulevard and Cool Springs Parkway. The scope of work includes the construction of the trail and the adjustment of existing infrastructure, such as inlets, valves, and manholes, to be flush with the final grade. All work must be performed according to plans created by Coastal Design Consultants, Inc. and must conform to Florida Department of Transportation (FDOT) and Pasco County Public Infrastructure Branch specifications. The contract will be awarded to the lowest responsive and responsible bidder, with a local business preference allowing a local vendor to match the lowest price if they are within 10 percent (for bids up to $1,000,000) or 5 percent (for bids over $1,000,000) of the lowest bid. Bidders must be properly licensed and certified, and the successful contractor is required to provide performance and payment bonds, insurance certificates, and a quality control system. Submissions must be uploaded via the Bonfire portal by January 5, 2027, at 1:30 p.m. ET. There is no set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS