EXT DPW | PW Powell St Improvement Project [PLA]
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
San Francisco Public Works has issued a Request for Qualifications and Proposals (RFQP) for a Construction Manager/General Contractor (CM/GC) team to deliver pre-construction and construction services for the Powell Street Improvement Project. This initiative targets a three-block corridor on Powell Street between Market and Geary Streets, a key pedestrian and transit hub featuring the iconic cable car turnaround. The project scope encompasses comprehensive streetscape enhancements including roadway improvements, sidewalk replacement and extension, sub-sidewalk basement repairs, advanced lighting installations, landscaping, utility relocations, waterproofing, and traffic and pedestrian routing with minimal disruption to existing cable car operations. Emphasis is placed on high-quality material selection for non-standard elements and close coordination with MUNI transit operations. The projected total construction budget stands at $35 million, with direct construction costs estimated at $28 million. The CM/GC team’s responsibilities cover value engineering, constructability reviews, cost estimating, schedule development, and phased logistics planning to facilitate complex urban construction sequencing under a citywide Project Labor Agreement (PLA). Proposals are due by December 19, 2025, with a mandatory pre-proposal conference scheduled for November 13, 2025, available in-person and virtually. The solicitation mandates compliance with California Department of Industrial Relations registration requirements, City of San Francisco labor ordinances including Local Business Enterprise participation goals, prevailing wage laws, healthcare security, and paid sick leave provisions. Contractors must submit safety prequalification documentation and OSHA injury logs for prior years. The procurement process underscores a best-value award approach reflecting technical expertise, coordination capacity, and labor compliance rather than strictly lowest price. Inspection and acceptance will occur on-site, overseen by San Francisco Public Works, ensuring adherence to all applicable codes and standards. Proposals must be electronically submitted in accordance with specified formatting and deadlines, with additional administrative submissions required for safety and labor compliance verification. No packaged clauses with formal FAR references are included; instead, the contract references local administrative codes, project-specific labor agreements, and city ordinances. Key contract administration details such as payment procedures and evaluation factor weightings are not explicitly detailed in the solicitation but align with standard municipal public works procurement practices for large-scale urban infrastructure projects.
General Info
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
San Francisco Public Works (“Public Works”) announces a Request for Qualifications and Proposals (“RFQP”) inviting interested parties to submit their qualifications and a competitive proposal to provide pre-construction, construction management, general contracting and value engineering services from trade subcontractors for the Powell Street Improvement Project (“Powell Street Project”). Interested parties responding (“Respondents”) to this RFQP are to be Construction Manager/General Contractors (“CM/GC”) teams consisting of the CM/GC and specified Core Trade Subcontractors in a design-assist capacity capable of performing pre-construction services, as well as construction services, including but not limited to, constructability reviews, cost estimating, schedule development and validation, and development of complex construction phasing and logistics sequencing that integrates engineering controls. The Powell Street Project is located on Powell Street between Market and Geary Streets in San Francisco, California.
Scope of Work: The Powell Street Improvement Project is a collaborative initiative aimed at revitalizing a three-block stretch of Powell Street between Market Street and Geary Street in San Francisco. This area, serving as a critical pedestrian corridor and home to the iconic cable car turnaround, has faced challenges such as vacant storefronts and declining foot traffic.
This project consists of roadway improvements, sidewalk replacement work, sub-sidewalk basement repairs, sidewalk extensions, lighting installations, and landscaping improvements. Work may involve roadway demolition, site grading, sub-sidewalk basement work, waterproofing, utility relocation work, traffic routing, temporary pedestrian routing, and all related work. The project will place significant emphasis on the selection, detailing, and installation of high-quality materials, particularly for non-standard elements associated with sidewalks, lighting, and site furnishings. There will also be the need for close coordination with MUNI Operations to ensure minimal impacts and shutdown time to ongoing cable car operations and customers. Project will be required to provide adequate traffic routing and phasing plans for vehicles and pedestrians during construction to minimize impacts to traffic and keep businesses open during construction.
The Total Estimated Construction Budget for the Project, including Pre-Construction services, is $35,000,000, with the Direct Cost of Construction estimate being $28,000,000.
Pre-Proposal Conference Information: A Pre-Proposal Conference will be held on Thursday, November 13, 2025 at 10:00am at 49 South Van Ness Avenue and via an Audio/Virtual Conference through Microsoft Teams. Physical presence is strongly recommended but not required. Public Works encourages all Proposers and Proposers‘ representatives to attend on time.
Meeting ID: 280 646 627 155 0 Passcode: Pc2Lr6yr Dial in by phone +1 (555) 000-0000,,428224098# United States, San Francisco Phone conference ID: 428 224 098#
1. DPWs Contracts & Bid Opportunities, https://bidopportunities.apps.sfdpw.org/: to obtain Advertisements, Tabulation of Bids, and Awards information.
2. DPW Electronic Bid Documents Download Site, https://bsm.sfdpw.org/ContractAdmin/Login.aspx to obtain Bid Documents, Plan Holders Lists and Addendum information; may be downloaded at no cost.
3. OLSE, http://sfgsa.org/index.aspx?page=391: Office of Labor Standards Enforcement (OLSE) website to obtain documents distributed at the pre-bid conference and other information.
Documents include:
-Healthcare Security Ordinance
-Pre-bid and pre-construction information
-Paid Sick Leave Ordinance Fact Sheet Effective March 1, 2015, no contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site.
DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS