Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on November 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EXT DPW | PW Powell St Improvement Project [PLA]

Closed
SFGOV-0000011166State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
SLED
Mesilla Valley Community of Hope Building 5 Re-roof
Solicitation # 26-27-035
Solicitation 26-27-035, issued by the City of Las Cruces Public Works department, is for the re-roofing of Building 5 at the Mesilla Valley Community of Hope located at 999 W. Amador Avenue, Las Cruces, New Mexico. The project has an estimated total cost of 400,000.00 dollars and involves the removal and replacement of all existing insulation, roof membrane, and metal roofing. The scope of work includes the installation of thermoplastic membrane roofing, standing seam metal roofing, and sheet metal flashing and trim, along with additional insulation and cricketing materials to enhance drainage and performance. Additionally, the contractor must replace ceiling tiles and repair deteriorated stucco and windows at the clerestory. The facility must remain fully operational throughout construction, requiring materials to be procured and delivered prior to demolition to minimize disruption. Bids are due by 2:00 pm on November 3, 2026, and must be submitted via the OpenGov portal. The contract will be awarded based on the lowest individual, grouped, or lump sum unit price, with preferences of up to 10 percent available for New Mexico resident veterans, New Mexico residents, local Las Cruces businesses, and the use of recycled content. Awarded contractors must provide performance and payment bonds, proof of insurance, and adhere to prevailing wage rates as per Wage Decision DA-26-3243-B. All work must comply with SMACNA and AAMA 2605 standards, OSHA safety regulations, and New Mexico Administrative Code licensing requirements. The contract includes a one-year correction period for defective materials and workmanship, with liquidated damages set at 500 dollars per day.
Public Works

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 238160
New
SLED
TDF - PIF Rooftop Walkway SP
Solicitation # B-54660
The Illinois Department of Human Services is soliciting bids for the installation of approximately 2,000 feet of anti-slip roofing walkway pads at the TDF Rushville facility. The project requires 1,600 feet of Versico brand pads for existing tan TPO roofing and 400 feet of Firestone brand pads specifically for the Gamma housing unit roof. All pads must be 34 inches wide with a minimum thickness of 150 mil, feature a raised diamond plate tread pattern, and include safety yellow edges if available from the manufacturer. Installation must be performed by an approved Versico and/or Firestone installer in accordance with manufacturer specifications and ASTM standards. To be considered responsive, the prime vendor must perform at least 51 percent of the work using permanent, full-time W-2 employees who have been employed for at least 30 consecutive days prior to bid submission. Vendors must certify compliance with the Illinois Prevailing Wage Act, the Illinois Department Human Rights Act, and various state certifications regarding legal entity status, felony convictions, and tax delinquency. The contract includes a 12-month warranty period and allows for termination for convenience with 30 days' written notice. Payments are processed according to the State Prompt Payment Act, and the contract is contingent upon the availability of funds from the Illinois General Assembly or federal sources.
MENTHLTH444 - Mental Health

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

San Francisco Public Works has issued a Request for Qualifications and Proposals (RFQP) for a Construction Manager/General Contractor (CM/GC) team to deliver pre-construction and construction services for the Powell Street Improvement Project. This initiative targets a three-block corridor on Powell Street between Market and Geary Streets, a key pedestrian and transit hub featuring the iconic cable car turnaround. The project scope encompasses comprehensive streetscape enhancements including roadway improvements, sidewalk replacement and extension, sub-sidewalk basement repairs, advanced lighting installations, landscaping, utility relocations, waterproofing, and traffic and pedestrian routing with minimal disruption to existing cable car operations. Emphasis is placed on high-quality material selection for non-standard elements and close coordination with MUNI transit operations. The projected total construction budget stands at $35 million, with direct construction costs estimated at $28 million. The CM/GC team’s responsibilities cover value engineering, constructability reviews, cost estimating, schedule development, and phased logistics planning to facilitate complex urban construction sequencing under a citywide Project Labor Agreement (PLA). Proposals are due by December 19, 2025, with a mandatory pre-proposal conference scheduled for November 13, 2025, available in-person and virtually. The solicitation mandates compliance with California Department of Industrial Relations registration requirements, City of San Francisco labor ordinances including Local Business Enterprise participation goals, prevailing wage laws, healthcare security, and paid sick leave provisions. Contractors must submit safety prequalification documentation and OSHA injury logs for prior years. The procurement process underscores a best-value award approach reflecting technical expertise, coordination capacity, and labor compliance rather than strictly lowest price. Inspection and acceptance will occur on-site, overseen by San Francisco Public Works, ensuring adherence to all applicable codes and standards. Proposals must be electronically submitted in accordance with specified formatting and deadlines, with additional administrative submissions required for safety and labor compliance verification. No packaged clauses with formal FAR references are included; instead, the contract references local administrative codes, project-specific labor agreements, and city ordinances. Key contract administration details such as payment procedures and evaluation factor weightings are not explicitly detailed in the solicitation but align with standard municipal public works procurement practices for large-scale urban infrastructure projects.

General Info

San Francisco seeks CM/GC for $35M Powell Street improvements, emphasizing coordination, labor compliance, and quality.

Documents

2

EXT DPW | PW Powell St Improvement Project [PLA] RFQP

PDF, High priority: read this first10 pages · rfp
High

Powell Street Improvement Project RFQP 0000011166

PDF, High priority: read this first2 pages · rfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Department of Public Works
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction Manager/General Contractor - Powell Street Improvement Project [Citywide PLA]
San Francisco Public Works (“Public Works”) announces a Request for Qualifications and Proposals (“RFQP”) inviting interested parties to submit their qualifications and a competitive proposal to provide pre-construction, construction management, general contracting and value engineering services from trade subcontractors for the Powell Street Improvement Project (“Powell Street Project”). Interested parties responding (“Respondents”) to this RFQP are to be Construction Manager/General Contractors (“CM/GC”) teams consisting of the CM/GC and specified Core Trade Subcontractors in a design-assist capacity capable of performing pre-construction services, as well as construction services, including but not limited to, constructability reviews, cost estimating, schedule development and validation, and development of complex construction phasing and logistics sequencing that integrates engineering controls. The Powell Street Project is located on Powell Street between Market and Geary Streets in San Francisco, California.
Scope of Work: The Powell Street Improvement Project is a collaborative initiative aimed at revitalizing a three-block stretch of Powell Street between Market Street and Geary Street in San Francisco. This area, serving as a critical pedestrian corridor and home to the iconic cable car turnaround, has faced challenges such as vacant storefronts and declining foot traffic.
This project consists of roadway improvements, sidewalk replacement work, sub-sidewalk basement repairs, sidewalk extensions, lighting installations, and landscaping improvements. Work may involve roadway demolition, site grading, sub-sidewalk basement work, waterproofing, utility relocation work, traffic routing, temporary pedestrian routing, and all related work.  The project will place significant emphasis on the selection, detailing, and installation of high-quality materials, particularly for non-standard elements associated with sidewalks, lighting, and site furnishings. There will also be the need for close coordination with MUNI Operations to ensure minimal impacts and shutdown time to ongoing cable car operations and customers. Project will be required to provide adequate traffic routing and phasing plans for vehicles and pedestrians during construction to minimize impacts to traffic and keep businesses open during construction.
The Total Estimated Construction Budget for the Project, including Pre-Construction services, is $35,000,000, with the Direct Cost of Construction estimate being $28,000,000.
Pre-Proposal Conference Information: A Pre-Proposal Conference will be held on Thursday, November 13, 2025 at 10:00am at 49 South Van Ness Avenue and via an Audio/Virtual Conference through Microsoft Teams. Physical presence is strongly recommended but not required. Public Works encourages all Proposers and Proposers‘ representatives to attend on time.
Meeting ID: 280 646 627 155 0 Passcode: Pc2Lr6yr Dial in by phone +1 (555) 000-0000,,428224098# United States, San Francisco Phone conference ID: 428 224 098#
1. DPWs Contracts & Bid Opportunities, https://bidopportunities.apps.sfdpw.org/: to obtain Advertisements, Tabulation of Bids, and Awards information.
2. DPW Electronic Bid Documents Download Site, https://bsm.sfdpw.org/ContractAdmin/Login.aspx to obtain Bid Documents, Plan Holders Lists and Addendum information; may be downloaded at no cost.
3. OLSE, http://sfgsa.org/index.aspx?page=391: Office of Labor Standards Enforcement (OLSE) website to obtain documents distributed at the pre-bid conference and other information.
Documents include:
-Healthcare Security Ordinance
-Pre-bid and pre-construction information
-Paid Sick Leave Ordinance Fact Sheet Effective March 1, 2015, no contractor or subcontractor may be listed in a bid for a public works project unless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
DISCLAIMER: The information provided below is a summary of the project. Addenda and other bid changes will be distributed by email only to Plan Holders with email addresses, and will be posted on the DPW Electronic Bid Documents Download Site.
DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS