This Solicitation opportunity from California was posted on August 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
EXT GSA | Treasure Island IC 4.3: ONLY Metal Frame
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves an early bid opportunity for structural metal framing work on a new affordable housing development located at Treasure Island Parcel IC 4.3 in San Francisco. The project encompasses approximately 219,250 square feet across six stories, with a mix of Type II metal framing over concrete, including residential units, community spaces, and support facilities. The work is scheduled to begin in the fourth quarter of 2026, with a total construction duration of about 22 months. Bidders are required to submit their proposals by September 11, 2024, with the opportunity to participate in a voluntary virtual pre-bid conference scheduled for August 26, 2024. All bid documents and communications are managed through BuildingConnected, and bidders must review detailed bid exhibits covering scope, requirements, schedules, labor standards, and safety protocols. The project is overseen by The John Stewart Company and Catholic Charities CYO of the Archdiocese of San Francisco, with architecture by Paulett Taggart Architects. Labor standards mandate prevailing wages and union labor for specific trades, including carpenters, laborers, and operating engineers. The developer has committed to meeting local workforce participation and small business enterprise goals, including a 20% SBE participation target. Bidders are encouraged to review all bid requirements thoroughly, submit a completed bid form, and stay engaged via BuildingConnected for updates and status reports. The contract size is estimated between five and fifteen million dollars, with the project funded and managed under the auspices of the San Francisco General Services Agency.
General Info
Agency
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
1. BID DUE DATE: Wednesday, September 11, 2024 @ 2:00 p.m. 2. JOB WALK: There is no job walk scheduled for this trade, however, subcontractors are encouraged to visit the site on their own. 3. Voluntary, Virtual Pre-Bid Conference: Monday, August 26, 2024 @ 9 a.m. a. Location: Click Here for Virtual Meeting Link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZmQ0MTNlZTYtMDhkNi00NWJlLWI3NmYtNzI3NzIyM2Q1MDFi%40thread.v2/0?context=%7b%22Tid%22%3a%22f46cb8aa-2e43-43a5-9146-29f8ab7a3553%22%2c%22Oid%22%3a%2201dc396e-972f-43b3-aadf-d90d71874ec2%22%7d b. Or Call in #: +1 (555) 000-0000 - Conference ID: 889 326 494 4. REQUESTED DESIGN-ASSIST TRADE: Structural Metal Framing 5. PROJECT DESCRIPTION: THIS IS A CAHILL PROJECT. New Construction / 219,250 gsf / 150 Units / 6 Stories / Affordable Housing / 5-Story Type II Metal over 1-Story Type I Concrete. Level 1 consists of property management offices, mail, bike parking, car parking spaces, and residential units with stoops. Level 2 consists of community room, courtyards, laundry room, and residential units. Level 3-5 are residential units. Level 6 consists of residential units and a laundry room. 6. OWNER/DEVELOPER: The John Stewart Company / Catholic Charities CYO of the Archdiocese of San Francisco 7. ARCHITECT: Paulett Taggart Architects 8. TENTATIVE SCHEDULE: Begin construction in 4th Qtr 2026 with a total 22-month duration. 9. LABOR REQUIREMENTS: Prevailing Wage (state or federal, higher of the two) for all trades / Union Labor required for carpenters, laborers, operating engineers only 10. EQUAL OPPORTUNITY WORK FORCE PARTICIPATION GOALS: The developer has committed to meeting the San Francisco Contract Monitoring Division’s (SFCMD) non-discrimination, equal opportunity contracting and local workforce hiring participation goals including Small Business Enterprises participation (20% SBE), Construction Work Force Goals, Prevailing Wage requirements. 11. DEADLINE FOR BID RFI’s: Wednesday, August 28, 2024 @ EOD. 12. BID DOCUMENTS: All bid documents can be accessed through BuildingConnected. 13. BID EXHIBITS: All bidders should review the bid requirements as defined by the Bid Exhibits which include: Scope of Work, General Requirements, Contracting & Workforce Hiring Goals, Schedule, Contract Term/Labor Relations, Insurance Requirements, Document List, Logistic plan, Environmental Health and Safety, Design Build Requirements, and BIM Requirements, 14. BID FORM: All bid submissions should include a completed and signed bid form. 15. BUILDINGCONNECTED: All bid submissions and communication should be made on BuildingConnected. 16. BID STATUS: Please update your bidding status on BuildingConnected by Tuesday, August 20, 2024. 17. CONTACT: For any questions regarding this project or BuildingConnected access, please contact Evan Lei at contact@example.gov or Cahill Estimating at contact@example.gov. . . .
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
