Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EXT MOH | Sunnydale Market at Amani TI [Rebid]

Closed
SFGOV-0000012024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 70Z04726RPCNI0018
Solicitation 70Z04726RPCN0018 is a fixed-price design-build contract for the construction of a full-motion Weapons System Trainer facility for HC-130J aircraft at USCG Base Elizabeth City, North Carolina. The project involves the creation of an approximately 13,000 gross square foot facility designed to house a Government Furnished, Government Installed mobile simulator. Key spaces include classrooms, administrative offices, debriefing areas, and essential support rooms for electrical, mechanical, and telecommunications systems. Site work encompasses the installation of sidewalks and landscaping while utilizing existing parking areas. The project has an estimated value of approximately 16 million dollars and a period of performance of 719 calendar days from the date of award. Technical requirements specify adherence to ASCE 24 Flood Design Class II and the mandatory use of Siemens Building Automation System equipment to ensure compatibility with existing base infrastructure. The award will be based on best value using tradeoff selection procedures, evaluating non-price factors such as planning, organization, communication, and construction approach—with a preference for offerors experienced in military or commercial flight simulators. Compliance mandates include the Davis-Bacon Act for prevailing wages, UFC 4-010-06 for cybersecurity of control systems, and strict security protocols requiring US citizenship for all on-site personnel. Quality control is managed through a rigorous system of preparatory and initial phase checklists, daily production reports, and government quality assurance inspections.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in about 13 hours
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside, Design-Bid-Build project for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The scope of work includes site preparation, stormwater mitigation via an infiltration pond, the purchase and erection of the steel building, installation of a concrete slab, underground utilities, a dry pipe fire suppression system, and specialized dehumidifying equipment. The project must adhere to strict technical standards, including UFC 3-600-01, NFPA 13, and the 2021 International Building Code, with specific requirements for cybersecurity of control systems and Buy American Act compliance for fire alarm components. This Firm Fixed Price task order has an estimated magnitude between 1 million and 5 million dollars, with a statutory limit of 5 million dollars. The government will award the contract based on a balanced evaluation of technical capability and price. Technical evaluations will focus on the proposed project schedule, which must show completion within 360 days of the Notice to Proceed, and the qualifications of key personnel. The period of performance requires work to commence within 10 calendar days of the Notice to Proceed and be fully completed within 365 calendar days. All invoices are to be processed through Wide Area Workflow, and the project is subject to prevailing wage rates for Pierce County per General Decision Number WA20260111.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 13 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This interior tenant improvement project involves the build-out of a 2,779 square foot small grocery market located on the ground floor of a mixed-use building in San Francisco. The scope of work includes the creation of a sales floor, produce prep area, refrigeration systems, cold storage cooler boxes, storage areas, and an office, as well as the conversion of an existing ADA bathroom into storage. The project requires comprehensive mechanical, electrical, plumbing, and refrigeration improvements, including the installation of a Type 1 duct to the roof. This is a rebid project that omits Build America, Buy America Act requirements and incorporates revised architectural and MEPR plans. Construction is projected to begin on November 23, 2026, with a target opening date of April 9, 2027. Bids must be submitted by August 24, 2026, and pricing must remain firm through December 31, 2026. All subcontractors are required to adhere to the higher of State or Federal prevailing wage laws and provide certified payroll. The contract includes a 5 percent retention rate and requires subcontractors to indemnify Sutti Associates against any wage-related penalties. Bidders are expected to have independently verified all existing site conditions, as change orders based on observable site conditions will not be accepted.

General Info

Build-out of 2,779 sq ft San Francisco grocery market starting November 23, 2026.

Documents

(1)

EXT MOH Sunnydale Market at Amani TI Rebid RFP

PDF•rfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Mayor's Office of Housing and Community Development
Contacts1 person available
OfficeN/A

Full Description

Show more
PROJECT SUMMARY Interior tenant improvement project for a small grocery market on ground floor vacant space of a recently completed mixed use building. Work to be completed within 2,779 sq ft store, shared ground floor tenant spaces [Janitorial and Trash Rooms], rooftop, and existing shaft and Type 1 duct to roof [approx. 46 ft]. Improvement shall accommodate sales floor and cashier/checkstand area, produce prep area, refrigeration system and cases, two cold storage cooler boxes, two storage areas, and office. One of two existing completed ADA bathrooms to be converted to Storage. Work shall include minor demolition of existing partitions, new partitions, new finishes, and associated mechanical, plumbing, and electrical improvement. REBID NOTES This project is being rebid per the client with the following changes from original bid request: * Build America, Buy America Act [BABA] – requirements are omitted. * Revised MEPR plans — per refrigerated case and refrig system equip changes and inclusion of Remote Defrost Panel w/E3 Controller * Revised Architectural plans — per refrigerated case, refrig system equip & shelving changes * Bid RFIs #01–09 TENTATIVE CONSTRUCTION SCHEDULE * Projected Construction Start Date: November 23, 2026 * Projected Store Opening Date: April 9, 2027 REBID SCHEDULE * Rebid RFP Open Date: Friday, August 14, 2026 * Rebid RFI Due Date: Wednesday, August 19, 2026 at NOON [12:00 PM] Pacific * Rebid Due Date: Monday, August 24 at End of Day CONTACT—Submit all bids and bid RFIs via email to: Lin Hundt at linh@suttiassoc.com John Sutti & Associates, Inc. [Sutti Associates] 700 Airport Boulevard, Suite 410, Burlingame, CA 94010 FULL RFP, RFP ADDENDUM, PLANS, CUTSHEETS, AND REFERENCE MATERIALS—available on project OneDrive: https://suttiassoc-my.sharepoint.com/:f:/p/linh/IgAt5W12T5MwTpZJf01NNij4AbWVBeAP5u8DCKwFon-YS3Q?e=HA4LPx REBID PLAN SET Permit Submittal Plans + Plan Check Comment Responses + Delta 2 + Bid RFIs 1–9: * Architectural plans dated 07/14/2026 * Structural plans and calcs dated 05/29/2026 * Mechanical plans dated 07/21/2026 * Electrical plans dated 07/21/2026 * Plumbing plans dated 07/21/2026 * Refrigeration Plans dated 07/23/2026 PROJECT REQUIREMENTS, BID VALIDITY & INDEMNIFICATIONS The following requirements apply: * Prevailing Wage — All subcontractors and sub-subcontractors are required to pay not less than the State or Federal prevailing wage, whichever is higher. — State Prevailing Wage Determination is 2026-1: https://www.dir.ca.gov/OPRL/2026-1/PWD/index.htm ; — Federal Prevailing Wage Determination is CA20260018 Modification #5: https://sam.gov/wage-determination/CA20260018/5 — Prevailing Wage Indemnification: Subcontractor assumes full responsibility for strict compliance with all applicable State and Federal prevailing wage laws and Certified Payroll reporting requirements. Subcontractor agrees to fully indemnify, defend, and hold harmless Sutti Associates from and against any and all fines, penalties, legal fees, and administrative costs arising from the Subcontractor’s, or its lower-tier subcontractors’, failure to comply with wage requirements. * Site Conditions Acknowledgment: Site photos and shell drawings are included in bid reference documents. Regardless of attendance, by submitting a proposal, the Subcontractor acknowledges that they have independently investigated and are fully aware of all existing site conditions. Sutti Associates will not entertain any change orders or requests for additional compensation based on site conditions that could have been reasonably observed prior to the bid submission. * Bid Validity: By submitting a proposal, subcontractors guarantees that all submitted pricing, including labor and material costs, shall remain firm and valid through December 31, 2026. Subcontractor bears all risks associated with material price escalations and supply chain delays prior to the projected construction start date. Sutti Associates reserves the right to disqualify any bids that do not explicitly accept this condition. * Certified Payroll: Yes * LBE / SBE Goals: N/A — however LBE / SBE contractors are encouraged to apply * Bid Discount or Rating Bonus: N/A * SFHA Hiring Goal: N/A * First Source Hiring Program [FSHP]: N/A * Section 3 Hiring (Federal Requirement) Davis Bacon: Yes * Retention Rate: 5% TRADES/SCOPES OF WORK THIS PROJECT For non-MEPR trades, be sure to review Scope of Work documents on project OneDrive. * Final Construction Cleaning * Concrete Scanning, Coring, Wall/Saw Cut, Break & Removal * Concrete [forms, rebar, place & finish] & Backfill * Misc. Ironwork * Aluminum Infill at Entrance Canopy * Sheet Metal, if not by HVAC sub * Stainless Steel, if not by HVAC sub * Acoustical Insulation Ceiling Treatment — Patching * Roofing — Patching * Openings — Hollow Metal Door Frames, Hollow Metal/Wood Doors & Hardware — Traffic/Double-Acting Doors & Hardware * Metal Stud Framing, Drywall, Tape & Finish + Insulation * Acoustical (Suspended) Ceiling * FRP Wall Paneling * Grind & Polish + Sealed Concrete * Resinous Flooring & Base – Epoxy [incl Vapor Barrier] * Painting * Automatic Fire Sprinklers – Design, furnish, and install alterations to + tie-in to (E) sprinkler system * Plumbing * HVAC with breakout pricing for: — Heating & Cooling—Furnish equip, rough-in, trim, start-up, certified TAB, and T24 — Demolition—Remove bottom of (E) Type 1 duct enclosure [note: adjustments to existing HVAC at demo'd (E) Restroom to be included in HVAC base bid not in demo breakout] — Sheet Metal — Stainless Steel * Electrical + Lighting with breakout pricing for: — Electrical—Furnish equip + light fixtures/lighting controls, rough-in, trim, power/connections to MEPR + tenant-furnished equip, low voltage provisions/data infrastructure incl. wiring to refrig remote defrost panel w/E3 controller, demo/safe off (E) electrical + lighting/controls at demo'd (E) Restroom, and T24 — Fire Alarm – Design, furnish, and install alterations to + tie-in to (E) bldg fire/life safety system * Refrigeration + Refrig Controls [incl furnish & install refrig system equipment, receive-set-pipe tenant-furnished refrigerated cases + self-contained freezer, startup/acceptance testing/commissioning, and T24] * Cooler Box Installation with breakout pricing for: — ADD/ALT: Furnish Cooler Boxes, reach-in doors + shelving, and double-acting doors

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS