Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Exterior Demolition – Lower Pavilion

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Pennsylvania → Washington CountyView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Washington County, PA, USA

Set-Aside

NONE

Documents

This scope was carved out of Mount Pleasant Township, Washington County.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Park Pavilions Update

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania → Washington County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Washington County
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal of exterior building components such as siding, doors, windows, and structural elements as needed.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
HQ Maintenance Services
Solicitation # HQC01026QE022
The contract is for comprehensive preventive, unscheduled, and emergency maintenance services at the Defense Commissary Agency’s Vogelweh Headquarters in Germany, under solicitation number HQC01026QE022. The contractor must provide all labor, management, materials, and specialized tools to ensure the continuous, safe, and compliant operation of facilities, infrastructure, utilities, and refrigeration systems. Preventive maintenance requires a full initial inventory of equipment and refrigerants, updated semi-annually, with scheduled checks performed as defined. Unscheduled maintenance must be estimated in the Service Order Management System (SOMS) within 14 days of request and completed within 45 days of approval, with delays requiring notification and documentation. Emergency maintenance operates around the clock with a mandatory three-hour on-site response time; repairs under €3,000 must be addressed immediately, while those exceeding that threshold require prior coordination with the Contracting Officer’s Representative. All work orders, inventories, and billing must be managed exclusively through SOMS, with documentation in Microsoft Office formats and all communications in English. The contractor is strictly liable for refrigerant management, including tracking for any unit containing 3kg or more of refrigerant and submitting an annual leak report by January 30. A two-year legal guarantee on all parts and installations is mandated by EU Directive 2019/771, with non-conforming work requiring correction within seven days or facing cancellation without payment. The contractor must maintain a workforce capable of performing at least 70% of work internally, with all personnel proficient in English. A Contract Manager and Alternate with 24-hour accessibility must be designated and registered with the Contracting Officer and COR. Personnel must wear company uniforms, visible photo ID badges, and appropriate safety gear while on base, with access restricted to direct employees unless special arrangements are made for specialists. A mandatory 30- to 45-day Phase-In Period is required upon award to verify inventory, install labels, establish emergency contact procedures, produce an annual preventive maintenance schedule, and submit a Quality Control Plan and Safety Plan within 30 days of the Notice to Proceed. All equipment must be labeled with pre-numbered blue-background, white-text vinyl tags using a three-letter facility code and six-digit number, permanently affixed in visible yet non-customer-facing locations, without contractor branding. Monthly reports including completed work summaries, funds remaining, and PM service lists are due with invoices, while quarterly PM findings and semi-annual
Defense Commissary Agency- Eur Area

POSTED

about 9 hours ago

DEADLINE

in 10 days
View Details
NAICS: 238990
New
Federal
Taut Wire and Perimeter DetectionThe Federal Prison System under the Department of Justice is forecasting a contract opportunity for Taut Wire and Perimeter Detection systems, with a posted date of August 10, 2026. The solicitation is targeted under NAICS code 238990, which covers other building completion services, indicating the work involves installation and integration of advanced perimeter security infrastructure across multiple correctional facilities nationwide. Performance is expected to be conducted across the entire United States, with no specific city or state designated, reflecting a broad, decentralized scope of work that may include site assessments, system design, hardware supply, and field deployment at various BOP locations. The point of contact for inquiries is Kelly Kuykendall, reachable via email at k2young@bop.gov, while David Orrantia serves as the Small Business Specialist with the email dorrantia@bop.gov, indicating the opportunity may include preferences or set-asides for small businesses though no official set-aside type has been specified. The contract is currently in a forecast phase, meaning no formal solicitation has been issued yet, but interested vendors should prepare for potential future bidding and ensure compliance with federal security and construction standards relevant to correctional facility perimeter systems. Further details and updates will likely be available through the DOJ Forecasting Contracting Opportunities portal.
Federal Prison System / Bureau Of Prisons

POSTED

about 22 hours ago

DEADLINE

N/A
View Details

More opportunities from Pennsylvania → Washington County

Same awarding agency

NAICS: 237110
SLED
Anaerobic Digester Improvements Project Contract Nos. 2026-02 & 2026-03
Solicitation # Contract Nos. 2026-02 & 2026-03
The Washington-East Washington Joint Authority is soliciting sealed bids for the Anaerobic Digester Improvements Project, identified by Contract Nos. 2026-02 and 2026-03, to be performed at the Wastewater Treatment Plant in South Strabane Township, Washington County, Pennsylvania. The project involves constructing a digester building addition, installing digester heating and mixing equipment, and deploying supplemental systems to support the new infrastructure. Bids must be submitted electronically through the PennBid platform by 10:00 A.M. local time on Tuesday, August 18, 2026, and attendance at a mandatory pre-bid conference on August 4, 2026, at the plant site is required for bid eligibility. The estimated duration of the project is 450 days, with performance occurring entirely at the job site under F.O.B. job site terms. All bidders must comply with prevailing wage requirements enforced by the Department of Labor and Industry, adhere to the Public Works Employment Verification Act of 2012, and ensure that all steel products used are manufactured in the United States. Contractors are prohibited from discriminating on the basis of race, age, color, religion, sex, national origin, or handicap. Bids must include a signed Bid Form (EJCdC® C-410), bid security, lists of proposed subcontractors and equipment, a qualification statement, the Act 127 employment verification form, and a nondiscrimination statement, all submitted as PDFs via PennBid. The contract award will be made to the lowest responsive and responsible bidder under a lowest price technically acceptable (LPTA) basis. The Owner reserves the right to reject any or all bids and to waive minor irregularities. Bids are irrevocable for 90 days after the due date, unless delayed by pending federal approvals, bond sales, or grant awards. Contractors must provide resumes of key personnel, including the project manager, superintendent, quality manager, and safety manager, and ensure all subcontractors carry workers’ compensation and commercial general liability insurance naming the Owner and Engineer as additional insureds. All equipment and materials must be new, undamaged, properly labeled with permanent engraved labels including manufacturer details, voltage, model number, and serial number, and must meet specified industry standards including UL, NEC, NEMA, ANSI, and ASTM. Work must conform to Division 2 (Site Work) and Division 16 (
Water and Sewer Line and Related Structures Construction

POSTED

21 days ago

DEADLINE

in 7 days
View Details