Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Commerce was posted on June 15, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Exterior Utilities Construction

Closed
NB195000-18-03328Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

100 Bureau Drive, GAITHERSBURG, MD, 20899, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Maliaka PinkneyPurchasing Agent
DeChanta S VaughanContract Specialist

Full Description

Show more
This announcement constitutes a Sources Sought Synopsis (market survey). This is not a Request for Quote (RFQ) or a Request for Proposal (RFP). This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The National Institute of Standards and Technology is seeking business sources for a construction requirement entitled: "Manholes, subsurface structures, and exterior utilities". The location is at Gaithersburg, Maryland (20899). This is scheduled to be issued as an IDIQ contract. Contractor would be responsible for constructing repairs to exterior utility systems (water, sewer, steam, chilled water, natural gas, electric, and compressed air). In addition, the contract would be for repairs to manholes, handholes, concrete duct banks, and storm/sewer piping. Cooling tower weir construction repairs are also included in the scope. Many of the utilities originate within the NIST operated central plant the generates steam and chilled water. NIST operates a utility system on land that is under 700 acres that distributes utilities to the various laboratories and administrative facilities. The purpose of this sources sought is to determine interest and capability of potential sources including large businesses, qualified 8(a) small businesses, Historically Underutilized Business Zone (HUBZONE) small businesses, Service Disabled Veteran Owned Small Businesses (SDVOSBs) and other small businesses relative to the North American Industry Classification code (NAICS) 237110 - Water and Sewer Line and Related Structures Construction. The Small Business size standard for this NAICS code is $36.5 million average annual revenue. To make an appropriate acquisition decision for this project, the Government may use responses to this source sought synopsis. The type of solicitation issued and the manner of advertisement may depend on the responses to this source sought synopsis. SUBMISSION REQUIREMENTS FOR RESPONSES TO THIS SOURCE SOUGHT SYNOPSIS (1) Your intent to submit a proposal for this project when it is formally advertised (2) Name of firm with address, phone and point of contact. (3) CAGE Code, DUNS number or a copy of your registration in the System for Award Management Registration (SAM) (4) The category of business, such as large, small, 8(a), HUBZONE, or SDVOSB (5) Statement of Capability (SOC)stating technical, competence, past specialized experience , skills, knowledge, and equipment required to perform the specified type of work within the past 48 months for which your firm was the prime contractor. The SOC should be no more than three pages in length. Identify the following information as part of your SOC. (6) Identify your firm's experience modification rating (EMR), bonding capacity for individual contract awards and in aggregate. Ensure to include dates completed for (A) and (B). (A) Exterior utility contract that installed over 1,500 LF of ASME Power B31.1 (steam) piping that is at least 100 PSI (B) Exterior utility contract that installed chilled water lines that installed over 1,500 LF of chilled water supply and return piping. Minimum size of pipe shall be at least 4 inches. Firms responding to this sources sought synopsis, who fail to provide ALL of the required information requested, will not be used to assist the Government in the acquisition decision, which is the intent of this sources sought synopsis. All capability statements shall be submitted via e-mail to maliaka.pinkney@nist.gov. Responses must be submitted not later than 1:00pm EST June 29, 2018. Responses shall be limited to 20 single sided pages excluding business information.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS