This Government Contract opportunity from Department Of Defense was posted on September 27, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--CUTTING AND REMOVAL OF CEDAR TREES FOR USACE, GAVINS POINT PROJECT POC: GALEN JONS [phone hidden]

Awarded
W9128F-10-Q-G040Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
FAC 120 - Firebreak Maintenance and Hazard Tree Removal in Nickserson State Park FY27
Solicitation # BD-27-1020-DCRFC-DC366-134921
The Massachusetts Department of Conservation and Recreation is soliciting bids for firebreak maintenance and hazard tree removal at Nickerson State Park for fiscal year 2027. The scope of work is divided into two primary tasks: the maintenance of the firebreak along Ober Road through tree removal, mulching, and mowing, and the mitigation of hazard trees throughout the park's campgrounds, internal roads, and bike paths. All work must comply with OSD Statewide Contract FAC 120, and the contractor is required to ensure that tree stumps protrude no more than two inches from the ground. Qualified bidders must provide a completed Bidder Response Form, three relevant references, and certified insurance policies for all subcontractors. Evaluation is based on the best value to the Commonwealth, considering price, equipment, safety programs, and the qualifications of onsite staff. Key requirements include a superintendent with a valid Massachusetts Certified Arborist or International Society of Arboriculture certification and machine operators holding a current Massachusetts Timber Harvester License. All equipment must meet ANSI specifications and current safety inspections. The project is subject to Department of Labor Standards Prevailing Wage Rates. Work must be performed Monday through Friday between 7:00 am and 6:00 pm, commencing within ten business days of the Notice to Proceed. Responses are due by 4:00 PM on November 17, 2026. Bidders may apply for a single task or both, though the agency reserves the right to award tasks separately. The primary point of contact for the solicitation is Casey Duggan, with Paul Gregory serving as the task manager for firebreak maintenance.
Department of Conservation and Recreation

POSTED

about 5 hours ago

DEADLINE

in 19 days
NAICS: 561730
New
SLED
SNOW PLOWING AND/OR HEAVY DUTY SNOW REMOVAL WITH WHEEL LOADERS 2026-2027
Solicitation # 8968
The City of Waterbury is soliciting qualifications from multiple operators to provide citywide snow removal services for the 2026-2027 fiscal year. The scope of work is divided into two primary categories: snow plowing and sanding of city roads, and heavy duty trucking and snow removal utilizing wheel loaders. Services must be available from November 1, 2026, through April 30, 2027, under the direction of the Public Works Department and the Bureau of Streets. All equipment must undergo city inspection by November 20, 2026, to ensure it meets minimum standards. Plowing equipment is categorized by gross vehicle weight ranging from light duty (11,500 to 19,500 lbs) to heavy duty (33,001 lbs or greater), with established hourly rates between 90 and 250 dollars depending on the equipment type and service provided. The selection process involves a two-stage approach consisting of short-listing based on technical and managerial capabilities, equipment quality, and prior performance, followed by interviews and negotiations. Awarding is at the sole discretion of the City. Successful vendors must comply with the Federal Davis-Bacon Act, the American Recovery and Reinvestment Act of 2009, and HUD Section 3 clauses. Additionally, vendors must obtain approval from the City Risk Manager for all insurance before commencing operations and are required to use city-issued magnetic plates on all vehicles. Responses were due by November 13, 2026, and required the submission of a vendor qualification statement, vehicle information sheets, and a non-collusive affidavit.
DAS Procurement

POSTED

about 6 hours ago

DEADLINE

in 15 days
NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. This public works project involves a comprehensive scope of work including demolition, site and soil preparation, irrigation installation using 2-inch Schedule 40 PVC, planting, concrete work, lighting, and low-voltage electrical work. The contract will be awarded to the lowest responsive and responsible bidder on a firm-fixed fee basis, with a required project completion timeline of 45 working days. Bids must be submitted electronically via the OpenGov portal, with the final deadline extended to November 5, 2026, at 5:00 pm. Qualified contractors must possess a Prime B license and comply with various regulatory requirements, including the Living Wage Ordinance, Equal Employment Opportunity regulations, and DIR registration for prevailing wage compliance. Bidders are required to provide a bid security of at least 10 percent of the bid amount, and the successful awardee must provide a 100 percent performance bond and a payment bond of at least 50 percent if the contract is under 1 million dollars. Evaluation factors include the complete submission of the bid form and available local business preferences, offering a 2 percent preference for businesses with a local office and an additional 4 percent for those with local ownership. All work must adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and applicable ADA and ABA accessibility standards.
Economic Development and Housing

POSTED

about 9 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract involves the cutting of living and dead eastern red cedar trees on U.S. Army Corps of Engineers property near Vermillion, South Dakota. The contractor is responsible for providing all labor, equipment, and supervision to clear designated units with varying tree densities, ensuring stumps are cut no higher than two inches above the ground. Work must be completed within 120 calendar days per awarded unit following a mandatory pre-construction meeting. Subcontracting is strictly prohibited, and the contractor is liable for any damage to adjacent private property. Strict safety and environmental protocols are required, including the use of spark arrestor muffler systems on all power equipment and the provision of A-B-C fire extinguishers to mitigate grass fire risks. The contractor must submit a detailed accident prevention plan and adhere to regulations protecting non-target vegetation, fish, and wildlife. Payment is issued via Electronic Funds Transfer following a final inspection and acceptance of the work by the Point of Contact. The contract consists of a base unit and several optional units, with award decisions based solely on bid prices.

General Info

Contract Value

$18,441.6

NAICS

561730 - Landscaping Services

Place of Performance

NE, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
ContactsNo contacts available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
ContactsNo contact information available

Full Description

Show more
CEDAR CUTTING ON U.S. ARMY CORPS OF ENGINEERS PROPERTY Special Contract Requirements 1. Delivery of Services. This contract is for the cutting of eastern red cedar trees (living or dead) on designated unit(s) of federal property. The designated Contracting Officer (CO) for this contract is the Technical Support Chief, the Contracting Officers Representative (COR) is the Lake Manager, and the Point of Contact (POC) is the Natural Resource Specialist. The POC can be contacted at +1 (555) 000-0000. 2. Location and Site Inspection. The work sites are on federal property managed by the U.S. Army Corps of Engineers, near Vermillion, South Dakota in Clay County. Site inspections can be arranged by contacting the POC at +1 (555) 000-0000. 3. Government Furnished Property, Materials, Services. Aerial photos of the units available upon request. 4. Contractor Furnished Items/Services. The contractor shall furnish all equipment, labor, licenses, materials, permits, services, supplies, tools, vehicles, and supervision necessary to complete the contract. 5. Access/Parking. The property is accessed via an adjacent public road (SD Hwy. 19). The contractor is liable for any damage to adjacent private property such as, but not limited to, turf, roads, fences, etc. There are no access roads within the work area. To minimize the impacts to the land resources, the contractor shall limit the number of vehicles utilized to access the work site on a daily basis. The number of vehicles and a parking spot near the work site shall be discussed and mutually agreed upon by the POC and contractor at the pre-construction meeting. Contractor vehicles shall be parked in a manner so as to avoid interference with normal work activities, the recreating public, or municipal/government operations. 6. Storage Area. It is the contractors responsibility to secure his personal property during non-working hours. The government will not be liable for lost, stolen, or vandalized property. 7. Fire Precautions. Site conditions during the timeframe in which the contracted work is to be completed are such that the potential for a grass fire exists. It is the contractors responsibility to minimize the potential for a grass fire by: 1) not smoking outside of a vehicle while working on-site, 2) insuring that all power saws are equipped with spark arrestor muffler systems, 3) insuring that all gasoline/diesel powered equipment (excluding passenger vehicles) are equipped with spark arrestor muffler systems, 4) insuring that power saws and all gasoline/diesel powered equipment are not refueled with warm or hot spark arrestors (running or not), and insuring that a nonfreezing-type A-B-C fire extinguisher commensurate with the size of the fire danger is present on all mechanized equipment and in very close proximity to power saw users. The contractor and all personnel shall have cell phones on-site with them at all times during work activities. The local emergency phone number(s) will be furnished to the contractor by the POC at the pre-construction meeting. 8. Pre-construction Meeting. Within five (5) business days after the date of receipt of the Notice of Award and prior to starting work activities, the contractor shall contact the POC to schedule a date and time to conduct the preconstruction meeting. At this meeting the contractor shall identify equipment to be used, submit an accident prevention plan, submit a work plan, and discuss any peculiarities of the contract requirements. 9. Commencement of Work. The contractor shall not begin work activities until after Notice of Award and completion of the pre-construction meeting. The contractor shall have one hundred and twenty (120) calendar days after the date of Notice of Award to complete each awarded unit. The time stated for completion of each unit includes final cleanup of the premises and removal of all contractor equipment, materials, and supplies. It shall be the contractors responsibility to start and provide a continuous work operation from day to day, weather permitting, until completion of the contract. If adverse weather conditions or unforeseen circumstances prevent the completion of the contracted work within the allotted 120-day time frame, the contractor shall be required to submit in writing to the POC, a request for contract time extension which must document the cause(s) for the contracted work not being completed on time. Lack of personnel, equipment, or other work priorities will not be acceptable reasons for allowing a contract time extension. Approval of any contract extension will be at the discretion of the COR. 10. Scope of Work. The contractor shall cut all eastern red cedar trees (living or dead) within the unit(s). Tree densities may average up to 150 trees per acre, with an average tree height of 10-15 feet with average maximum trunk diameters of approximately six inches. Stump height shall not exceed two (2) inches above the natural ground surface and shall have no limbs or branches remaining. All cut trees may be left where they fall, unless the contractor needs to move them for continued access to other trees. Trees may also be removed by the contractor at no additional cost to the Government. All work areas are on relatively flat ground, with occasional gentle slopes. Units 1 and 2 are high-density areas with up to 150 trees per acre. Units 3, 4 and 5 are medium density with up to 100 trees per acre. Units 6, 7, 8 and 9 are lower density areas with up to 50 trees per acre and surrounded by hardwoods. Site inspections are encouraged prior to offering bids and can be arranged by contacting the POC at +1 (555) 000-0000. 11. Subcontracting. Subcontracting is not allowed. 12. Contractor Quality Control (CQC). The contractor shall provide and maintain an effective quality control program. The quality of all work shall be the responsibility of the contractor. 13. Periodic Compliance Inspections. The POC shall conduct periodic inspections of the work sites throughout the contract period to insure compliance with contract requirements. The POC will be allowed to observe and photograph all work activities conducted in completion of this contract. No government personnel will be allowed to assist the contractor in actual work operations or supervision of the contractor's personnel. The contractor is encouraged to attend such inspections. 14. Discrepancies/Corrective Action. The contractor shall, upon receipt of a notice in writing of any noncompliance with the foregoing provisions, take immediate corrective action. If the contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs of damages by the contractor unless it was later determined that the contractor was in compliance. 15. Accident Prevention and Safety. In accordance with the U. S. Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1, the contractor shall submit at the pre-construction meeting an accident prevention plan to be followed by all contractor personnel during performance of the work. The plan shall be developed only after a careful analysis of the work involved and shall be tailored specifically to the conditions of this contract and shall address the following items: a) Responsible Individuals b) Indoctrination of New Employees c) Tool Box Safety Meetings d) Fire Prevention and Protection e) Housekeeping f) Mechanical Equipment Inspection g) First Aid and Medical Facilities h) Sanitation i) Personal Protective Equipment/Devices j) Accident Reporting All personnel are required to wear/use the manufacturers recommended personal protective equipment/devices. The contractor shall provide the minimum on-site safety requirements as follows: a) The contractor will provide at least one nonfreezing-type A-B-C fire extinguisher in each workshop and shed used for storage of materials at the work site. Place in a location readily accessible to personnel. b) The contractor will provide at least one nonfreezing-type A-B-C fire extinguisher in each vehicle and implement. Place in a location readily accessible to personnel. c) The contractor will provide and maintain a first aid kit commensurate with the size of the project with items necessary for first-aid treatment of all injuries. d) Advise personnel of the location of first-aid kits. e) Post telephone numbers of nearest hospital or ambulance service and fire station in a conspicuous location. Advise all personnel of locations and telephone numbers. 16. Environmental Protection. The contractor shall perform all work in such a manner as to minimize the polluting of air, water, or land, and shall, within reasonable limits, control noise and the disposal of solid waste materials, as well as other pollutants. 16.1. Protection of Resources. The contractor shall not pollute streams, lakes or reservoirs with fuels, oils, bitumens, calcium chloride, acids, insecticides, herbicides or other harmful materials. The contractor shall investigate and comply with all applicable Federal, State, County and Municipal laws concerning pollution of rivers and streams. 16.1.1. Spillage. Special measures shall be taken to prevent chemicals, fuels, oils, grease, bituminous materials, waste washings, herbicides and insecticides, and concrete drainage from entering public waters.If any spillage occurs, the contractor shall remove the material and restore the area to the original condition before being contaminated. If necessary, contaminated ground shall be excavated and disposed of as directed by the Contracting Officer, and replaced with suitable fill material, compacted and finished with topsoil and planted as required to reestablish vegetation all at the expense of the contractor. 16.1.2. Disposal. Disposal of all materials shall be at the appropriate locations as directed by the POC.Disposal of any materials, wastes, effluent, trash, garbage, oil, grease, chemicals, etc., in areas adjacent to streams shall not be permitted. If any waste material is dumped in unauthorized areas, the contractor shall remove the material and restore the area to the original condition before being disturbed. If necessary, contaminated ground shall be excavated and disposed of as directed by the Contracting Officer, and replaced with suitable fill material, compacted and finished with topsoil and planted as required to reestablish vegetation all at the expense of the contractor. 16.2. Protection of Non-Target Trees and Shrubs. The contractor shall not deface, injure, remove, cut, or destroy non-target trees and shrubs. No ropes, cables, or guy wires shall be fastened to or attached to any existing nearby non-target trees or shrubs for anchorages. 16.3. Protection of Fish and Wildlife. The contractor shall at all times perform work and take such steps required to minimize interference with or disturbance to fish and wildlife. The contractor will not be permitted to alter water flows or otherwise disturb native habitat adjacent to the project area that, in the opinion of the Contracting Officer, are critical to fish or wildlife. 17. Bids. The bid prices for each unit shall be inclusive of all costs that might be incurred by the contractor during this contract such as, but not limited to, mobilization fee, fuel, labor, mileage, equipment, equipment rental fees, licenses, insurance, etc. The Government will award a contract resulting from this solicitation to the responsible offeror whose bid, conforming to the solicitation, will be most advantageous to the Government. Bid evaluation criteria will consist of bid prices only. The resulting contract may consist of the base unit plus any number of the optional units. 18. Final Inspection(s). The contractor shall notify the POC a minimum of 2-3 business days prior to the anticipated date of completion of each unit to schedule the final inspection. The contractor shall not remove/relocate his equipment, materials, or supplies from the unit until completion of the final inspection and acceptance of the contractors work by the POC. The contractor shall be required to attend the final inspection with the POC. 19. Payment. Upon completion of the contracted work, the contractor shall submit one invoice for payment. To minimize the potential for a delay in payment for services rendered, the invoice shall include the contract number and date along with the contractor's name, billing address, and signature. Payment will be made after satisfactory completion, inspection, and acceptance by the POC of all contract work performed, upon presentation to the Disbursing Officer of an invoice covering the services rendered. Payment will be made via Electronic Funds Transfer (EFT). 20. Attachments. The contractor will be furnished with such additional copies of the aerial photos as may be required for carrying out the work. Full-size copies of the aerial photos will be furnished without cost to the contractor upon request. The following attachments are hereby incorporated and made a part of this solicitation: Bid Sheet Evaluation Criteria #1 (Bid Prices) Unit 1 - cutting of eastern red cedar trees on approximately 27 acres (Base = 27 acres) $84.90 = $2292.30 Unit 2 - cutting of eastern red cedar trees in addition to the Base task (Option 1 = 38 acres)$84.90 = $3226.20 Unit 3 - cutting of eastern red cedar trees in addition to above tasks (Option 2 = 38 acres) $56.00 = 2128.00 Unit 4 - cutting of eastern red cedar trees in addition to above tasks (Option 3 = 47 acres) $56.60 = $2660.20 Unit 5 - cutting of eastern red cedar trees in addition to the Base task (Option 4 = 50 acres) $56.60 = $2830.00 Unit 6 - cutting of eastern red cedar trees in addition to above tasks (Option 5 = 38 acres)$42.50 = $1615.00 Unit 7 - cutting of eastern red cedar trees in addition to above tasks (Option 6 = 19 acres)$42.10 = $799.90 Unit 8 - cutting of eastern red cedar trees in addition to above tasks (Option 7 = 30 acres) $42.50 = $1275.00 Unit 9 - cutting of eastern red cedar trees in addition to above tasks (Option 8 = 38 acres) $42.50 = $1615.00

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a total small business set-aside for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The project focuses on facilities G7140 and H7140 and is structured as a firm-fixed-price contract with a final delivery deadline of March 20, 2027. The scope of work requires a certified API 653 inspector to conduct external inspections, visual assessments of containment areas, and verification of alarms and Automatic Tank Gauge equipment. Deliverables include a teleconference kick-off meeting, completed API Std 653 checklists, and the submission of draft and final reports that identify any appurtenances not complying with DoD Standard AW 78-24-27. The government will award the contract to the responsible offeror deemed most advantageous based on technical capability, experience, and price reasonableness. Proposals must be submitted as a single PDF not exceeding five pages, excluding the cover page, price worksheet, and certifications. Required submission materials include the inspector's certification, a one-page resume, and past performance references. Due to the work being performed on a closed military installation, all personnel must undergo identity proofing and vetting unless they possess a current government security clearance. Quotes must be submitted electronically to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by the response deadline of November 13, 2026.
All Other Professional, Scientific, and Technical Services

POSTED

about 14 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS