Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on July 6, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--FIRELINE

Awarded
P16PS01105Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 5 days
NAICS: 115310
New
SLED
San Poil Forest, 4 PreCommercial thinning contrats, 21 Mile area
Solicitation # SanpoilForest2026Oct29.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for four Pre-Commercial Thinning (PCT) contracts in the 21 Mile area of the Colville Indian Reservation. The project encompasses a total of 120.1 acres divided into four units: SP-11-PCT-27 (56.3 acres), SP-12-PCT-27 (38.4 acres), SP-13-PCT-27 (41.5 acres), and SP-14-PCT-27 (40.2 acres). The scope of work requires contractors to identify desirable crop trees and remove competing trees and shrubs according to specific site treatment prescriptions. Performance is subject to strict quality standards, including stump heights of less than five inches, specific slash clearance requirements near roadways and streams, and the protection of boundary and surveyed blazed trees. Bids must be submitted via a locked drop-off box at the San Poil Forestry Office by 4:00 PM on October 29, 2026; electronic submissions are prohibited. A complete bid packet must include a work plan, contractor liability insurance, TERO compliance and utilization forms, Title X certification, a debarment form, a bid evaluation form, and sam.gov verification. Award evaluations will consider technical qualifications, price reasonableness, responsibility, and a strong emphasis on Indian preference. Payment is based on completed and accepted acreage at the bid price per acre, with 20 percent of each payment withheld until final inspection and approval by the Contracting Officer's Representative. Contractors must also comply with TOSHA safety regulations and maintain a valid Trader License.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 1 day
NAICS: 115310
New
Federal
Green Mountain Finger Lakes Invasive Species Map and Control
Solicitation # 12444726Q0053
Solicitation 12444726Q0053 is a HUBZone Small Business set-aside request for quotation issued by the USDA Forest Service for the mapping and control of non-native invasive plant species within the Green Mountain and Finger Lakes National Forests in Vermont. The contractor is required to survey, map, and treat invasive species across various environments, including timber harvest units, disturbance corridors, and developed sites, using a combination of manual, mechanical, physical, and chemical treatments. Key technical requirements include the use of GPS/GIS technology for data collection and the mandatory use of aquatic-safe herbicides near wetland areas. The period of performance is scheduled from January 1, 2027, to December 31, 2027. The scope of work is divided into several line items covering herbicide applications via cut stump, basal bark, and foliar methods, as well as population surveying and mobilization. To be eligible, the contractor and on-site supervisors must possess current Vermont commercial pesticide applicator licenses. Award decisions will be based on a technical approach, past experience, and price reasonableness, rather than solely on the lowest price. Following several amendments, the final deadline for quotes was extended to November 2, 2026. Performance will be monitored through 100 percent visual inspections of treatment units conducted by the Contracting Officer's Representative.
Csa East 8 Usda-Fs

POSTED

1 day ago

DEADLINE

in 6 days
NAICS: 115310
New
Federal
Mechanical Site Prep – Drum Chopping
Solicitation # 12444726Q0069
Solicitation 12444726Q0069 is a request for quotations issued by the USDA Forest Service for mechanical site preparation and vegetation management within the Ocala National Forest across Marion, Lake, and Putnam Counties, Florida. This 100 percent small business set-aside requires the use of a double drum offset chopper with straight blades, pulled by large bulldozers, skidders, or similar equipment. The scope of work includes a primary chopping treatment for 1,175 acres and a secondary chopping treatment for 397 acres in Area 10-1, with an additional 715 optional acres. The contractor must provide all labor, supervision, transportation, and equipment, maintaining a daily production rate of approximately 50 acres. The period of performance is scheduled from November 16, 2026, to February 26, 2027. Award will be based on best value, specifically the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable. Evaluation factors include the technical approach, project timeline, and relevant past experience. All tractors must be equipped with Roll-Over Protective Structures, and any equipment deemed unsatisfactory by the Contracting Officer's Representative must be replaced within 48 hours. Quotes are due by October 27, 2026, at 11:59 PM Eastern Time. Invoicing is processed electronically through the Department of Treasury's Invoice Processing Platform.
Csa East 8 Usda-Fs

POSTED

5 days ago

DEADLINE

in 37 minutes
NAICS: 115310
New
Federal
Longleaf Timber Stand Improvement
Solicitation # 12444726Q0070
Solicitation 12444726Q0070 is a firm-fixed-price request for quotes issued by the USDA Forest Service for Longleaf Timber Stand Improvement services within the Ocala National Forest, specifically covering Lake, Putnam, and Marion Counties in Florida. The project requires the contractor to provide all labor, equipment, tools, transportation, and supervision to cut small oaks and pines across approximately 1,575 acres. Technical specifications include the removal of sand pine and oaks under 5 inches dbh, with a specific focus on targeting vegetation under 3 inches in diameter within a 20-foot radius of seedlings. The period of performance is scheduled from November 9, 2026, to April 8, 2027, with a production expectation of 15 acres per day. This acquisition is a 100% Small Business Set-Aside and is subject to Service Contract Labor Standards, including specific wage and fringe benefit requirements for Forestry Technicians. Award will be based on best value, specifically the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable. Evaluation factors include the technical approach, project timeline, and relevant past experience. Quotes are due by October 27, 2026, at 11:59 PM Eastern Time and must be submitted via email. Invoicing is to be processed through the Invoice Processing Platform (IPP), and no bid, performance, or payment bonds are required.
Csa East 8 Usda-Fs

POSTED

5 days ago

DEADLINE

in 37 minutes
NAICS: 115310
New
SLED
NC27-127 Hurricane Cliffs
Solicitation # NC27-127
Solicitation NC27-127, titled Hurricane Cliffs, is an invitation for bids issued by the State of Utah Division of Purchasing for the Forestry, Fire, and State Lands unit. The project involves tree thinning and piling activities across approximately 180 acres in Iron County, Utah, specifically about two miles southeast of Cedar City. The primary objectives are to reduce the risk of catastrophic fire and promote vegetation diversity. The scope of work requires the cutting of pinyon and juniper trees six inches above ground level, with all slash exceeding three inches in diameter being piled. The contractor must provide a minimum 10-man crew equipped with chainsaws and GPS or smartphone mapping applications. The project budget is estimated at 128,700 dollars, and the work must be completed by December 31, 2027. Participation is strictly limited to prequalified contractors, and the contract will be awarded to the lowest cost responsive and responsible vendor. Bids must be submitted on both a per-acre and total cost basis, inclusive of all mobilization and operation costs, with pricing guaranteed through project completion. The contractor is required to maintain specific insurance coverages, including Workers Compensation and Commercial General Liability with limits of 1 million dollars per occurrence and 3 million dollars aggregate. Compliance with environmental standards is mandatory, including washing equipment to prevent the spread of noxious weeds and adhering to hazardous materials regulations. The contract is governed by the State of Utah's standard purchase order terms and conditions, including certifications against economic boycotts of Israel and adherence to federal and state non-discrimination laws.
Utah

POSTED

5 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract, awarded by the Department of the Interior's DSC Contracting Services Division, involves providing services to reduce hazardous wood fuels across 83 acres of forestry at Pea Ridge National Military Park in Garfield, Arkansas. A critical requirement of the project is the use of specialized equipment designed to minimize impacts and disturbances on the cultural grounds where the work is being performed. The agreement is governed by several Federal Acquisition Regulation clauses focused on environmental protection and sustainability. These include mandates for the procurement of biobased and EPA-designated items, energy efficiency in products, and strict guidelines regarding pollution prevention, ozone-depleting substances, and the identification of hazardous materials.

General Info

Hazardous wood fuel reduction on 83 acres at Pea Ridge National Military Park.

Contract Value

$53,950

NAICS

115310 - Support Activities for Forestry

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
IGF::OT::IGF G:EPREF, Service to Reduce Hazardous Wood Fuels to 83 acres of forestry at Pea Ridge National Military Park, Garfield, AR. Attachment 1, pg. 5, use of equipment which minimizes impact or disturbances on the cultural grounds where work is to be performed. FAR Clauses 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts, 52.223-5 Pollution Prevention and Right-to-Know Information, 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts, 52.223-3 Hazardous Material Identification and Material Safety Data, Alternate I, 52.223-11 Ozone-Depleting Substances, 52.223-15 Energy Efficiency in Energy-Consuming Products.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new process systems, administrative and support buildings, and utility connections. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project also requires a 12-month operational support period following construction. The estimated magnitude of construction exceeds 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Manager, Safety Specialist, and Historic Preservation Treatment Specialist. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements emphasize strict cybersecurity hygiene for SCADA/MES equipment, granting the government full access to software source code, and compliance with ADA standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a draft review by the Contracting Officer's Representative seven days prior to final submission.
Sewage Treatment Facilities

POSTED

about 15 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, with an estimated construction magnitude between $1 million and $5 million, involves three primary components: the selective demolition and installation of a new weatherable rigid vinyl sheet pile wall with tie rods and a deadman wall, the eastward extension of the wall using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to protect marine mammals and endangered species, and comply with the Davis-Bacon Act and various ASTM standards for recycling and packaging. Key requirements include the submission of a Contractor Quality Control plan, the assignment of specific key personnel, and the provision of performance and payment bonds. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform following a draft review by the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 17 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 7 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 10 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 3 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS