Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of The Interior was posted on May 12, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--LITTLE JACK CREEK NOXIOUS WEED TREATMENT - BLM ELKO DISTRICT, ELKO COUNTY, NV

Awarded
L12PS00588Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 21 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 21 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 21 hours ago

DEADLINE

in 18 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

2 days ago

DEADLINE

in 3 months

General Info

Contract Value

$50,687.48

NAICS

115310 - Support Activities for Forestry

Place of Performance

NV

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Nevada State Office
ContactsNo contacts available
OfficeRENO, NV, 89502, USA
Office AddressRENO, NV, 89502, USA
ContactsNo contact information available

Full Description

Show more
LITTLE JACK CREEK NOXIOUS WEED TREATMENT - BLM ELKO DISTRICT, NV Ground based herbicide spraying treatment of all noxious weeds within the approximate 1,060 acre project area (2011 Indian Creek Fire Area). The primary weed species known to exist within the contract area is Scotch thistle. Other noxious weeds known to exist within the fire area include (but are not limited to): white top and Russian Knapweed. The Contractor shall furnish all labor, equipment, chemicals, tools, materials, supervision, supplies, and incidentals; and perform all work necessary to complete application in accordance with the Performance Work Statement and the Herbicide Label(s).

More opportunities from Department Of The Interior → Nevada State Office

Same awarding agency

NAICS: 238990
New
Federal
Y--BASSIE SPRING IMPROVEMENT PROJECT
Solicitation # 140L3926Q0049
Solicitation 140L3926Q0049 is a firm-fixed-price request for proposals issued by the Bureau of Land Management Nevada State Office for the Bassie Spring Improvement Project located in Churchill County, Nevada. This total small business set-aside project involves the complete removal of a defunct spring diversion structure and the installation of a new spring diversion box equipped with a sand/gravel pack, underground PVC pipeline, float valve, and trough. Additionally, the contractor is required to construct a 650-foot pipe rail fence. The period of performance is scheduled from January 1, 2027, to October 30, 2027, with work expected to be completed within 60 calendar days of the notice to proceed. The government will award the contract using a best-value trade-off process, evaluating proposals based on technical capability, understanding of specifications, relevant experience, environmental compliance, and quality assurance processes. Contractors must adhere to strict environmental requirements regarding weed control, fire prevention, and cultural resource protection. While performance and payment bonds are not required, the project is subject to Davis-Bacon Act prevailing wage determinations for heavy construction in Churchill County. Proposals must include a completed Standard Form 1442, a technical narrative, and past performance information, with a final submission deadline of November 9, 2026.
All Other Specialty Trade Contractors

POSTED

6 days ago

DEADLINE

in 11 days
View Details
NAICS: 541430
Federal
Signage Project for Garnet Hill Recreation Area
Solicitation # 140LL027Q0005
Solicitation 140LL027Q0005 is a total small business set-aside under NAICS 541430 for the Bureau of Land Management Nevada State Office. The project involves the professional content development, fabrication, and delivery of interpretive and informational signage and pedestal structures for the Garnet Hill Recreation Area and Egan Crest Trailheads and campgrounds. Key deliverables include six large roofed kiosks, sixteen pedestal-mounted interpretive signs to be installed along an ADA accessible concrete sidewalk, fifteen small overlay fee site instruction panels, and the procurement of NPS style traditional exhibit bases. The primary goal is to provide public education on natural and cultural resources, safety, and general regulations. The contract will be awarded using a best value trade-off process, where technical capability and past performance are significantly more important than price. Technical evaluations will focus on the proposed approach, quality control plans, key personnel experience, and the project timeline. Offerors must demonstrate at least three relevant experiences within the last five years. Submissions must be divided into two separate volumes: one for technical and past performance information and another for pricing via Standard Form 1449. The contractor is required to adhere to OSHA Title III Construction Industry Standards and maximize the use of biobased and environmentally preferred products. Payment will be processed electronically through the Invoice Processing Platform.
Graphic Design Services

POSTED

14 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS