Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 6, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--PERI Mechanized Hazardous Wood Fuels Reduction - T

Awarded
140P6218R0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 5 days
NAICS: 115310
New
SLED
San Poil Forest, 4 PreCommercial thinning contrats, 21 Mile area
Solicitation # SanpoilForest2026Oct29.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forest Development, is soliciting bids for four Pre-Commercial Thinning (PCT) contracts in the 21 Mile area of the Colville Indian Reservation. The project encompasses a total of 120.1 acres divided into four units: SP-11-PCT-27 (56.3 acres), SP-12-PCT-27 (38.4 acres), SP-13-PCT-27 (41.5 acres), and SP-14-PCT-27 (40.2 acres). The scope of work requires contractors to identify desirable crop trees and remove competing trees and shrubs according to specific site treatment prescriptions. Performance is subject to strict quality standards, including stump heights of less than five inches, specific slash clearance requirements near roadways and streams, and the protection of boundary and surveyed blazed trees. Bids must be submitted via a locked drop-off box at the San Poil Forestry Office by 4:00 PM on October 29, 2026; electronic submissions are prohibited. A complete bid packet must include a work plan, contractor liability insurance, TERO compliance and utilization forms, Title X certification, a debarment form, a bid evaluation form, and sam.gov verification. Award evaluations will consider technical qualifications, price reasonableness, responsibility, and a strong emphasis on Indian preference. Payment is based on completed and accepted acreage at the bid price per acre, with 20 percent of each payment withheld until final inspection and approval by the Contracting Officer's Representative. Contractors must also comply with TOSHA safety regulations and maintain a valid Trader License.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 1 day
NAICS: 115310
New
Federal
Green Mountain Finger Lakes Invasive Species Map and Control
Solicitation # 12444726Q0053
Solicitation 12444726Q0053 is a HUBZone Small Business set-aside request for quotation issued by the USDA Forest Service for the mapping and control of non-native invasive plant species within the Green Mountain and Finger Lakes National Forests in Vermont. The contractor is required to survey, map, and treat invasive species across various environments, including timber harvest units, disturbance corridors, and developed sites, using a combination of manual, mechanical, physical, and chemical treatments. Key technical requirements include the use of GPS/GIS technology for data collection and the mandatory use of aquatic-safe herbicides near wetland areas. The period of performance is scheduled from January 1, 2027, to December 31, 2027. The scope of work is divided into several line items covering herbicide applications via cut stump, basal bark, and foliar methods, as well as population surveying and mobilization. To be eligible, the contractor and on-site supervisors must possess current Vermont commercial pesticide applicator licenses. Award decisions will be based on a technical approach, past experience, and price reasonableness, rather than solely on the lowest price. Following several amendments, the final deadline for quotes was extended to November 2, 2026. Performance will be monitored through 100 percent visual inspections of treatment units conducted by the Contracting Officer's Representative.
Csa East 8 Usda-Fs

POSTED

1 day ago

DEADLINE

in 6 days
NAICS: 115310
New
Federal
Mechanical Site Prep – Drum Chopping
Solicitation # 12444726Q0069
Solicitation 12444726Q0069 is a request for quotations issued by the USDA Forest Service for mechanical site preparation and vegetation management within the Ocala National Forest across Marion, Lake, and Putnam Counties, Florida. This 100 percent small business set-aside requires the use of a double drum offset chopper with straight blades, pulled by large bulldozers, skidders, or similar equipment. The scope of work includes a primary chopping treatment for 1,175 acres and a secondary chopping treatment for 397 acres in Area 10-1, with an additional 715 optional acres. The contractor must provide all labor, supervision, transportation, and equipment, maintaining a daily production rate of approximately 50 acres. The period of performance is scheduled from November 16, 2026, to February 26, 2027. Award will be based on best value, specifically the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable. Evaluation factors include the technical approach, project timeline, and relevant past experience. All tractors must be equipped with Roll-Over Protective Structures, and any equipment deemed unsatisfactory by the Contracting Officer's Representative must be replaced within 48 hours. Quotes are due by October 27, 2026, at 11:59 PM Eastern Time. Invoicing is processed electronically through the Department of Treasury's Invoice Processing Platform.
Csa East 8 Usda-Fs

POSTED

5 days ago

DEADLINE

in 29 minutes
NAICS: 115310
New
Federal
Longleaf Timber Stand Improvement
Solicitation # 12444726Q0070
Solicitation 12444726Q0070 is a firm-fixed-price request for quotes issued by the USDA Forest Service for Longleaf Timber Stand Improvement services within the Ocala National Forest, specifically covering Lake, Putnam, and Marion Counties in Florida. The project requires the contractor to provide all labor, equipment, tools, transportation, and supervision to cut small oaks and pines across approximately 1,575 acres. Technical specifications include the removal of sand pine and oaks under 5 inches dbh, with a specific focus on targeting vegetation under 3 inches in diameter within a 20-foot radius of seedlings. The period of performance is scheduled from November 9, 2026, to April 8, 2027, with a production expectation of 15 acres per day. This acquisition is a 100% Small Business Set-Aside and is subject to Service Contract Labor Standards, including specific wage and fringe benefit requirements for Forestry Technicians. Award will be based on best value, specifically the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable. Evaluation factors include the technical approach, project timeline, and relevant past experience. Quotes are due by October 27, 2026, at 11:59 PM Eastern Time and must be submitted via email. Invoicing is to be processed through the Invoice Processing Platform (IPP), and no bid, performance, or payment bonds are required.
Csa East 8 Usda-Fs

POSTED

5 days ago

DEADLINE

in 29 minutes
NAICS: 115310
New
SLED
NC27-127 Hurricane Cliffs
Solicitation # NC27-127
Solicitation NC27-127, titled Hurricane Cliffs, is an invitation for bids issued by the State of Utah Division of Purchasing for the Forestry, Fire, and State Lands unit. The project involves tree thinning and piling activities across approximately 180 acres in Iron County, Utah, specifically about two miles southeast of Cedar City. The primary objectives are to reduce the risk of catastrophic fire and promote vegetation diversity. The scope of work requires the cutting of pinyon and juniper trees six inches above ground level, with all slash exceeding three inches in diameter being piled. The contractor must provide a minimum 10-man crew equipped with chainsaws and GPS or smartphone mapping applications. The project budget is estimated at 128,700 dollars, and the work must be completed by December 31, 2027. Participation is strictly limited to prequalified contractors, and the contract will be awarded to the lowest cost responsive and responsible vendor. Bids must be submitted on both a per-acre and total cost basis, inclusive of all mobilization and operation costs, with pricing guaranteed through project completion. The contractor is required to maintain specific insurance coverages, including Workers Compensation and Commercial General Liability with limits of 1 million dollars per occurrence and 3 million dollars aggregate. Compliance with environmental standards is mandatory, including washing equipment to prevent the spread of noxious weeds and adhering to hazardous materials regulations. The contract is governed by the State of Utah's standard purchase order terms and conditions, including certifications against economic boycotts of Israel and adherence to federal and state non-discrimination laws.
Utah

POSTED

5 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract, identified by solicitation number 140P6218R0018, involves mechanized hazardous woody fuels reduction and tree thinning across approximately 186 acres. Managed by the Department of the Interior through the Dsc Contracting Services Division based in Denver, Colorado, the project falls under NAICS code 115310, which pertains to support activities for forestry. The award notice was posted on September 6, 2018, to address critical fuel reduction needs. The scope of work focuses on the mechanical removal of hazardous vegetation to mitigate fire risks within the designated project area.

General Info

Hazardous woody fuels reduction and tree thinning on 186 acres for Department of Interior.

Contract Value

$134,299.35

NAICS

115310 - Support Activities for Forestry

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

12

B08_Solicitation_Attachment_1_-_Project_Manual_for_PERI_Haz_Woody_Fuels.pdf

PDF

B08_Solicitation_Attachment_2_-_Pea_Ridge_Aerial_Map.pdf

PDF

B08_Solicitation_Attachment_3_-_Wage_Determination.pdf

PDF

B08_Solicitation_Attachment_4_-_Offeror%27s_Price_Schedule.pdf

PDF

B08_Solicitation_Attachment_5_-_Technical_%26__Financial_Capability.pdf

PDF

B08_Solicitation_Attachment_6_-_Technical_Approach.pdf

PDF

B08_Solicitation_Attachment_7_-_Instructions_for_Submission_of_Offer.pdf

PDF

B09_Amendment_0001_Exhibit_A_-_Sign_In__Sheet.pdf

PDF

B09_Amendment_0001_Revised_Attachment_2_-_Pea_Ridge_Aerial_Map.pdf

PDF

Sol_140P6218R0018_Amd_0001.pdf

PDF

Sol_140P6218R0018_Amd_0002.pdf

PDF

Sol_140P6218R0018.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 17, 2018 to Aug 21, 2018. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
PRESOLICITATION NOTICE for RFP 140P6218R0018 DESCRIPTION: On or about July 23, 2018, the National Park Service (NPS), Midwest Region, Missouri Major Acquisition Buying Office, intends to issue a Request for Proposal (RFP) 140P6218R0018 to solicit proposals for hazardous wood fuels reduction / mechanized tree thinning throughout seven (7) locations, totaling approximately 186 acres, at Pea Ridge National Military Park, National Park Service, Garfield, Arkansas. The work will consist of providing all labor, qualified supervision, materials, tools, equipment, supplies, transportation, incidentals, other services and expertise necessary to perform Hazardous Fuels Management Services at Pea Ridge National Military Park. The Contractor will be responsible for the entire scope of the project. All work required by the project documents shall be accomplished to the satisfaction of the Government even though incidental items or services that may be required to complete the work in its entirety may not be specifically mentioned in the project documents. The objective of this project is for the mechanized reduction of hazardous wood fuels - tree thinning for the prevention and control of wildfires. OVERVIEW DESCRIPTION. The following is an overview of the work to be performed. The full details and specifications will be posted in the forthcoming solicitation. 1. Total estimated acreage to thin is approximately 186 acres throughout seven (7) prioritized areas at Pea Ridge National Military Park, Garfield, AR. All areas are made up of cedar thinning operations. Priority #1 Approximately 55 acres Priority #2 Approximately 29 acres Priority #3 Approximately 18 acres Priority #4 Approximately 42 acres Priority #5 Approximately 21 acres Priority #6 Approximately 8 acres Priority #7 Approximately 13 acres 2. Areas involve the removal of cedar trees only, with exceptions identified in the "Specifications" section of the Project Document. 3. The sites are generally flat to steeply sloping, and are made up of eastern hardwood forest and shrubs. Species composition is primarily oak, hickory, locust and cedar. Trees range in height from 5 to 60 feet. Trees are both scattered and also densely grouped throughout the areas. Diameters average from approximately 6 to 22 inches. 4. The Contractor shall thin (cut, remove and/or mulch) eastern red cedar trees in Priorities #1 through #7 as follows: (a) All cedar trees, regardless of size, unless identified otherwise. (b) Completely cut and sever from the base of the tree. (c) Maximum stump height of not more than 3.0 inches. (d) Minimum stump height of no less than 1.0 inch above ground. (e) The removal of trees by Contractor, from Park property, will be allowed. Trees that are not removed will be chipped by Contractor. As such, brush piles are NOT guaranteed but may be established on a case-by-case extremely limited basis and will only occur in approved areas designated by the Park. Authorization will only be given for the construction of brush piles if trees are too big to mulch safely, as determined by the Park Project Inspector. If brush piles are allowed, then they must be piled into tight, burnable piles. The piles should be no larger than 8 feet in diameter, and no taller than 6 feet. Piles are not to be placed near "leave / save" trees (any hardwood or species other than cedar, unless marked) so that when burned, damage will not result to any adjacent standing live trees. When possible, piles shall be placed on open or rocky areas or previous burn areas. Piles are to be placed in locations where they are not visible to the public. (f) After completion of a project area, Contractor is to pull mulch 4 feet away from around the base of all hardwood, saved, and understory trees, and 4 feet away from fences. (g) There may be trees in work area locations that may be identified for leave trees. The Park will clearly mark those trees in those locations. Marked leave trees are to remain untouched and left in place by the Contractor. The Park's Project Inspector retains the right throughout contract performance to mark additional leave trees or unmark previously marked leave trees. (h) Non-target trees of any species are to be felled and mulched (or removed from the Park by the Contractor) if they become entangled in cut cedar trees, are identified by the Park to be cut, or the Contractor and Government considers they pose a threat to the Contractor. Diameter at breast height (DBH) must not exceed 12 inches. 5. ALLOWABLE EQUIPMENT a. No motor vehicle access is allowed in the forested areas. Parking of Contractor's motor vehicles at the contract site will be at locations as designated by the Park. b. Hand felling with chainsaws or similar equipment will be needed. Use of chainsaws in all areas can be expected, with heavier use in some areas than others. c. Dependent upon terrain and ground moisture content, any low impact rubber tracked skid steer, or similar type of equipment, can be utilized as long as it exerts no more than 11 lbs. per square inch on the ground and has no more impact at the worksite(s), or during ingress or egress than a T300 rubber tracked skid steer loader with a tree cutting/mulching attachment, such as a forester blade. An absence of this type or similar equipment will require the work be restricted to chainsaws or other hand tools. d. Ground disturbances shall be kept to a minimum. Ground disturbance deeper than 3 inches anywhere on the Park is not acceptable. Contractor shall be responsible for rehabilitation to National Park Service standards if this occurs. If ground disturbance occurs, work shall be immediately stopped and appropriate NPS personnel shall be notified to assess possible damage to the area. e. Tractors with chippers will only be allowed in designated areas. f. The use of bulldozers or similar types of equipment is not allowed. g. Only that type of heavy equipment which is acceptable to the Park for the Contractor's use may be utilized. h. When requested by the Contracting Officer, the Contractor shall provide copies of the maintenance and repair records of the equipment that the Contractor is employing at the contract site and/or requesting to be used at the contract site. i. Pea Ridge National Military Park reserves the right to suspend Contractor's use of any equipment or tools, at no cost to the Government, which appear to be causing damage to, or having a negative impact on the Park's resource or surrounding areas, regardless of its previous acceptance by the Park to be used in the performance of the contract. 6. QUALITY CONTROL AND MONITORING - The Contractor shall be soley and fully responsible for compliance to the work to be performed and its specifications, performance timeliness, and the terms and conditions of this contract through Contractor-provided quality control and monitoring. END OF DESCRIPTION OVERVIEW--------------- TYPE OF CONTRACT: This will be a single firm-fixed price services contract and is expected to be awarded in late-August, early-September 2018 timeframe. Award will be made to only one successful offeror. Wages are subject to the Service Contract Act. PERIOD OF PERFORMANCE: Work is estimated to begin in late September to mid-October 2017 with a completion date of not later than March 29, 2019. Work performance shall not begin until a post-award conference has been conducted, and the Contractor has received the Notice to Proceed issued by the Contracting Officer. NAICS CODE: The North American Industry Classification System (NAICS) Code assigned to this procurement is 115310, Support Activities for Forestry / Fuels Management Services. SET ASIDE: Total small-business set-aside. SMALL BUSINESS SIZE STANDARD: $19 million. SITE VISIT: Only one organized pre-proposal site visit will be scheduled. The site visit shall be held on Wednesday, August 1, 2018 at 10:00 a.m. central time at the Pea Ridge National Military Park, 15930 Highway 62, Resource Management Bldg., Garfield, Arkansas 72732. Offerors are encouraged and expected to attend the scheduled pre-proposal site visit, to inspect the site, and to satisfy themselves regarding the conditions that may affect the cost of the performance, to include verification of acreage stated in the solicitation. In no event shall failure to inspect the site or report discrepancies in acreage prior to the date and time questions from offerors are due, constitute grounds for a claim after contract award. Offerors planning to attend the site visit are to notify the Contracting Officer, Kathryn Logsdon by e-mail at contact@example.gov of their intentions prior to Tuesday, July 31, 2018 at 3:00 p.m. central time. Offerors are also advised to bring the solicitation documents with them to the site visit. PUBLICIZING: The official solicitation package (RFP) and its attachments will be issued and available on or about July 23, 2018 and will be posted to the Federal Business Opportunities (FBO) website at https://www.fbo.gov, and on the FedConnect website at https://www.fedconnect.net. The contracting officer will not provide hardcopies or email copies of the solicitation. It is the responsibility of the offerors to monitor the FBO and FedConnect websites to download the solicitation, its attachments, and all amendments issued against the solicitation. This Presolicitation Notice does not constitute a solicitation; it is advance notification only that a solicitation for proposals will be forthcoming. All contract specification documents, along with the method in which proposals are to be submitted and the criteria used to evaluate proposals shall be included in the forthcoming solicitation. RESPONSE TIME AND AWARD: Response time for submission of all proposals will be Friday, August 17, 2018 at 3:00 p.m. central time. The method in which proposals are to be submitted and the criteria used to evaluate them will be posted in the forthcoming solicitation. REGISTRATION: All offerors are to have a Unique Entity Identifier (aka DUNS number), be registered and active in the System for Award Management (SAM) at https://www.sam.gov, have completed their Representations and Certifications (Reps & Certs) and be represented as a small business under the NAICS Code of 115310, in order to be awarded a contract; therefore, if you are not already registered and active in SAM, or have not completed your Representations and Certifications at https://www.sam.gov, it is strongly advised that you do so at this time. Failure on the part of the successful offeror to fulfill these requirements by the time the Contracting Officer makes award may result in award of the contract being made to the next otherwise successful offeror. If you require assistance with acquiring a UEI (DUNS) number, completing your SAM Registration, Representations and Certifications, adding the assigned NAICS Code to your Reps & Certs, or accessing the solicitation and its attachments, please contact the Procurement Technical Assistance Center (PTAC) closest to you. PTAC locations can be found at http://www.aptac-us.org/new/. POINT OF CONTACT: The point of contact for this Presolicitation Notice is Kathryn M. Logsdon, Contracting Officer, and can be reached by phone at +1 (555) 000-0000, or by e-mail at contact@example.gov.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new process systems, administrative and support buildings, and utility connections. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project also requires a 12-month operational support period following construction. The estimated magnitude of construction exceeds 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Manager, Safety Specialist, and Historic Preservation Treatment Specialist. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements emphasize strict cybersecurity hygiene for SCADA/MES equipment, granting the government full access to software source code, and compliance with ADA standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a draft review by the Contracting Officer's Representative seven days prior to final submission.
Sewage Treatment Facilities

POSTED

about 16 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, with an estimated construction magnitude between $1 million and $5 million, involves three primary components: the selective demolition and installation of a new weatherable rigid vinyl sheet pile wall with tie rods and a deadman wall, the eastward extension of the wall using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to protect marine mammals and endangered species, and comply with the Davis-Bacon Act and various ASTM standards for recycling and packaging. Key requirements include the submission of a Contractor Quality Control plan, the assignment of specific key personnel, and the provision of performance and payment bonds. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform following a draft review by the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 17 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 7 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 10 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 3 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS