Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 22, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--Salt Cedar Removal and Treatment, Galisteo Resevoir, New Mexico

Awarded
W912PP-14-T-0085Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
Federal
Wisconsin - East Zone Gravel Pit NNIS Treatment Amendment 2: RFQ for 12363N26Q4152 This is for the Land Management Integrated Resources BPA only
Solicitation # 12363N26Q4152
The USDA Forest Service is issuing a BPA Call Order for NNIS treatment at gravel pit sites in the East Zone of Wisconsin under the Land Management Integrated Resources BPA, which is a nationwide multiple-award contract encompassing professional services, natural resource restoration, engineering, and project management. This procurement is restricted to the 39 pre-approved contractors already on the LMIR BPA, and the call order will be distributed exclusively via email to those listed entities; no public solicitation or proposal submissions are being accepted in response to this notice. The requirement is not set aside for any specific small business classification, though small businesses are preferred. The solicitation number is 12363N26Q4152, with a response deadline of June 15, 2026, and the NAICS code 115310 applies to this work. The procurement is administered by the Stewardship Contracting Branch of the USDA Forest Service, with primary point of contact Chad Bullock and secondary contact Jim Kaminski, both reachable via email. Any contractor wishing to join the LMIR BPA may submit proposals at any time before the BPA’s expiration by contacting the listed email addresses, as the BPA remains open for continuous pre-solicitation inclusion through SAM.gov using solicitation number 12363N23Q4152.
Stewardship Contracting Branch Usda-Fs

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 22 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

This sole source contract, awarded under the 8(a) Program to the Department of Defense, tasks a contractor with the removal and treatment of non-native salt cedar across a 45-acre project area located on the north side of the creek, east of the dam at Galisteo Reservoir, New Mexico. The scope of work requires the mechanical extraction of trees, including the removal of roots and stumps, using an extractor bucket attached to a track vehicle. All extracted material and dead salt cedar must be chipped on-site to a depth of no more than 2 inches. The project was scheduled for completion between September 2014 and April 15, 2015, specifically timed to minimize the impact on nesting bird species. The contractor is required to adhere to strict environmental guidelines, including the avoidance of flagged wetland and native habitats and the restoration of any disturbed areas to their preconstruction condition. Key deliverables include a written vegetation treatment plan, an Environmental Protection Plan, and a Stormwater Pollution Prevention Plan. Additionally, the contractor must ensure that no cutting or spraying occurs beyond the limits of the dam face and must backfill all resulting holes to the original grade to maintain land integrity.

General Info

Contract Value

$146,139.3

NAICS

115310 - Support Activities for Forestry

Place of Performance

NM, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Albuquerque
ContactsNo contacts available
OfficeALBUQUERQUE, NM, 87109-3435, USA
Office AddressALBUQUERQUE, NM, 87109-3435, USA
ContactsNo contact information available

Full Description

Show more
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. The Contractor shall provide services for salt cedar treatment over the 45-acre project area upstream of the Dam using mechanical extraction. The 45-acre project area upstream of the Dam using mechanical extraction. The 45 acre area shall start at the Dam and move toward the east until 45 acres is completed. All roots and stumps would be removed, where possible. Mechanical extraction is completed by using an extractor bucket attached to a track vehicle either on large tires or tracks. The entire tree including the root system is pulled out of the ground. As much as possible, all root pieces must be removed from the ground. This method allows for rapid and efficient widespread treatment of non-native vegetation in areas of largely monotypic stands. This methodology would be used in the proposed project area where a large stand of 6-to15-foot-tall salt cedar has been established. This action would be timed to result in the least impact to nesting bird species. This work would take place between September 2014 and April 15, 2015 and is located on the north side of the Creek just east of the Dam. This action would be timed to result in the least impact to nesting bird species. This work would take place between September 2014 and April 15, 2015 and is located on the north side of the Creek just east of the Dam. Material that is extracted would be chipped on site at a depth of no more than 2 inches.. Extraction and chipping should be completed with the least amount of impact to the land as possible. The area upstream of Galisteo Creek contains some wetland habitat. This and other native habitat will be flagged by the Corps Biologist and should be avoided during construction. Extraction: Extract or cut down non-native trees (either manually or mechanically). When extracting trees, all root material must be removed. Equipment or personnel shall not damage native vegetation. quote mark Leave trees quote mark will be marked by flagging for protection. The Contractor shall backfill all resulting holes to original grade. Chipping:Mechanically mulch or chip extracted trees on-site. Mulched material left on site shall not exceed 2 inches in diameter and any single piece may not exceed 6 inches in length. Mulched material shall not exceed 2 inches in depth. Any dead and down salt cedar trees should also be mulched. Best Management Practices: The following Best Management practices shall be implemented: The following Best Management practices shall be implemented: a. No cutting or spraying should occur beyond the limits of the dam face (boundaries will be reviewed on site with the Corps' Contracting Officer Representative (COR). b. Work shall be performed in a manner that will limit disturbance to the dam face. Areas that are disturbed shall be restored to its preconstruction condition as approved by the Corps' Contracting Officer. c. The Contractor shall submit, in writing, a plan for treatment of the vegetation including exact methodology and proposed schedule. The Contractor shall submit an Environmental Protection Plan and a Stormwater Pollution Prevention Plan (SWPPP) for the project after notification of award. Other submittals may be required. The Contractor shall provide a unit cost (per acre or other).

More opportunities from Department Of Defense → W075 Endist Albuquerque

Same awarding agency

NAICS: 237310
New
Federal
Special Notice - Announcement of Industry Day - Progressive Design-Build (PDB) Other Transaction (OT) for FY28 High Speed Test Track, Holloman Air Force Base, Otero County, Mexico
Solicitation # W912PP27Z1CUU
The U.S. Army Corps of Engineers, Albuquerque District, is issuing a special notice for a Progressive Design-Build Other Transaction agreement under the authority of 10 U.S.C. 2808a for the FY28 High Speed Test Track at Holloman Air Force Base in Otero County, New Mexico. This Firm-Fixed-Price project focuses on the repair and upgrade of critical infrastructure, including girder repair and restoration, the replacement of 3,963 linear meters of track connection tie-down points, the widening and replacement of STAPP East and West access roads, and repairs to the Camera Pad Road. The completed track must maintain an operational lifespan of at least ten years beyond construction. The procurement will follow a streamlined, two-step competitive selection process to identify the most qualified progressive design-build entity. In the first step, interested parties must submit a Statement of Qualifications, and up to three selected companies will proceed to the second step, which consists of pitch meetings. The project is structured into two phases: Phase 1 covers design and pre-construction services, while Phase 2 encompasses final design and construction. Cybersecurity Maturity Model Certification requirements will be determined based on guidance available during the first step of the request. Interested parties are advised to monitor sam.gov for the official solicitation announcement and complete proposal instructions.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 14 days
View Details
NAICS: 236220
Federal
REQUEST FOR INFORMATION/SOURCES SOUGHT
Solicitation # W912PP27RA003
The U.S. Army Corps of Engineers Albuquerque District is conducting a sources sought market survey for the construction of the Space Rapids Capabilities Office at Kirtland Air Force Base in New Mexico. This preliminary planning effort seeks to identify qualified industry sources for a competitive, firm-fixed-price, design-bid-build contract. The project involves the construction of a 67,833 square foot, two-story facility featuring controlled office spaces, a 200-seat auditorium, and specialized infrastructure including reinforced foundations and secure communications. The estimated construction value is between 50 million and 100 million dollars, with an anticipated solicitation issuance date around April 22, 2027. Key requirements for the project include compliance with Department of Defense antiterrorism and force protection standards, as well as Unified Facilities Criteria for permanent construction. The facility must support controlled networks and accreditation with physical and electronic security measures. Prospective prime contractors must demonstrate experience with ICD 705 and AV/ESS requirements, the design-bid-build process, and federal antiterrorism provisions. Additionally, the scope includes the installation of a LenelS2 OnGuard alarm system, requiring all contracted personnel to hold a Secret security clearance and adhere to DD Form 254 specifications. The government is also soliciting feedback on the potential use of Project Labor Agreements for this large-scale effort.
Commercial and Institutional Building Construction

POSTED

10 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
Federal
Combined Synopsis/Solicitation for; W912PP25RA009 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR CIVIL WORKS PLANNING STUDIES AND ASSOCIATED DESIGN ARCHITECT-ENGINEER (A-E) SERVICES, ALBUQUERQUE DISTRICT, N
Solicitation # W912PP25RA009
Solicitation W912PP25RA009 is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Civil Works planning studies and associated Architect-Engineer (A-E) services supporting the U.S. Army Corps of Engineers (USACE) Albuquerque District. The contract covers a regional area of operations spanning New Mexico, Southern Colorado, and Southwest Texas. With a shared capacity of 49.9 million dollars, the government intends to award contracts to five to seven firms across unrestricted and small business reserve pools. The scope of work includes interdisciplinary design, hydrologic and hydraulic analysis, river modeling, and construction support for water resource structures such as dams and levees. Selection is based on professional qualifications per the Selection of Architects and Engineers Statute, with a primary focus on specialized experience in flood control studies within the Albuquerque District. Evaluation criteria include professional qualifications, past performance over the last seven years, capacity to execute simultaneous task orders, and knowledge of the locality. Minimum requirements include proficiency in AutoCAD Civil 3D, ESRI products, and familiarity with USACE Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE). Offerors must submit a complete SF330 via the Procurement Integrated Enterprise Environment (PIEE) portal by November 6, 2026.
Engineering Services

POSTED

13 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS