Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 14, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--Vegetation Removal and Herbicide Application of Trinidad Dam, Las Amimas County, Colorado,

Awarded
W912PP-14-T-0087Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115112
New
SLED
AS27-123 Central Utah Aerial Seeding Project Phase 1 - 2026
Solicitation # AS27-123
The State of Utah Division of Purchasing and the Division of Wildlife Resources are seeking a single contract award for the Central Utah Aerial Seeding Project Phase 1 - 2026. This Invitation for Bids aims to secure a responsive and responsible vendor to perform aerial seeding across three specific project areas: the Widemouth 2 Fire Rehab Project Phase I (3,964 acres), the Watts Mtn Phase II Project (2,210 acres), and the Tower Fire Aerial Seeding Project (206 acres), totaling 6,380 acres. The performance period is strictly scheduled from November 4, 2026, through November 16, 2026. Bids must be submitted on a cost-per-acre basis, and the award will be granted to the lowest total cost responsive and responsible vendor. Technical requirements mandate that aircraft be equipped with GPS for 100% coverage and maintain a maximum 80-foot seeding swath width to prevent stripping. The use of drones is strictly prohibited, and operations must be postponed if wind speeds exceed 10 miles per hour. Upon completion, the contractor must provide electronic coverage documentation in UTM projection North America Datum 1983. The contractor is responsible for securing flight operations from airports in Redmond, Fillmore, or Richfield, Utah. Administrative requirements include maintaining Commercial General Liability insurance with limits of $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation. Vendors must certify compliance with E-Verify, anti-boycott laws regarding the State of Israel, and various non-discrimination statutes. Invoices must be submitted within 30 days of delivery and will be paid within 30 days of receipt of a correct invoice. The State Entity reserves the right to inspect deliverables within 30 days of delivery to ensure conformity with the specified standards before final acceptance.
Utah

POSTED

6 days ago

DEADLINE

in 4 days
NAICS: 115112
New
SLED
Cherry Fire Aerial Seeding
Solicitation # CS27-114
The State of Utah Division of Purchasing, on behalf of the Division of Wildlife Resources, is soliciting quotes for aerial seeding services for the Cherry Fire project in Tooele County. The scope of work involves the application of a seed mix consisting of grasses, shrubs, and forbs across 4,651 total acres at elevations between 5,700 and 6,700 feet. Specifically, the contractor must apply seed at a rate of 12 lbs/acre over 704 acres of TLA lands and 18 lbs/acre over 3,947 acres of private lands. All work must be completed by November 11, 2026. Technical requirements include the use of GPS technology to ensure 100% coverage and a requirement to begin seeding by 8:00 a.m. to minimize drift, with the government reserving the right to postpone operations if wind speeds exceed 10 miles per hour. The contract will be awarded to the responsive and responsible vendor submitting the lowest cost, with bids required on a cost-per-acre basis. Selected vendors must maintain Commercial General Liability insurance of at least $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation insurance. Administrative terms specify that deliveries are F.O.B. Destination Freight Prepaid and Allowed, with a 30-day window for the state to accept or reject deliverables. Invoices must be submitted within 30 days of delivery, and payments are due within 30 days of invoice execution. Contractors must also comply with the Utah Government Data Privacy Act and certify compliance regarding anti-boycott actions, forced labor restrictions, and E-Verify registration for personnel employed in Utah.
Utah

POSTED

6 days ago

DEADLINE

in about 15 hours

AI Contract Overview

Show more

This contract was awarded as a sole source under the 8(a) Program to provide all personnel, equipment, and services necessary for vegetation removal and herbicide treatment at the Trinidad Dam in Las Animas County, Colorado. The scope of work requires the removal of woody vegetation primarily by hand, with specific requirements for cutting diameters and stump heights to facilitate future excavation. Non-woody material must be mulched or disposed of in designated areas, and the contractor is strictly prohibited from using mechanical equipment on the dam embankments or groin to prevent soil disturbance. Herbicide application must be performed by a State of Colorado Certified Herbicide Applicator in compliance with the Federal Insecticide, Fungicide, and Rodenticide Act and EPA guidelines. The contractor is required to submit a Pesticide Management Plan for approval and adhere to strict safety and environmental protocols, including the use of aquatic-approved herbicides near surface water and the maintenance of spill kits. All operations must follow the Albuquerque District's Pesticide Discharge Prevention Plan and ensure that any disturbed areas are restored to their original condition.

General Info

Contract Value

$50,940

NAICS

115112 - Soil Preparation, Planting, and Cultivating

Place of Performance

NM, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Albuquerque
ContactsNo contacts available
OfficeALBUQUERQUE, NM, 87109-3435, USA
Office AddressALBUQUERQUE, NM, 87109-3435, USA
ContactsNo contact information available

Full Description

Show more
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. The Contractor shall provide all personnel, equipment, supplies, materials, facilities, transportation, tools, supervision, and any other items and non-personal services necessary to perform vegetation removal and herbicide treatment on the Trinidad Dam. Vegetation Removal: Vegetation shall be removed primarily by hand using hand tools. The Contractor shall cut all woody vegetation with a trunk diameter of greater than two (2) inches at the base. For trunk diameters greater than six (6) inches, the Contractor shall leave a six (6) inch high stump for future excavation. All woody vegetation shall be stacked and removed from the project area for disposal in a designated area. The remaining vegetation should be cut to the base (using chain saws or other hand equipment-no mechanical equipment shall be used on the dam embankments or groin for this work). Vegetation shall be treated with aquatic approved herbicide, if herbicide application is necessary, following the herbicide application requirements described below in this PWS. The herbaceous (non-woody) vegetative material shall be mulched and mulched material may be left on the dam face. Material that cannot be mulched will be spread out in the 'disposal area'. The Contractor shall coordinate with the USACE POC for exact location of the disposal area. Herbicide Application: The Contractor shall treatment all cut stumps within 10 minutes to prevent regrowth. All remaining vegetation within the project area shall be treated. This shall be accomplished by spraying with appropriate herbicide mixture (based on the vegetation type, the time of year, as well as efficacy) at the base of the vegetation remaining after cutting. The herbicide should contain a dye so that treated areas and stumps may be visible. Herbicide application shall be conducted with power operated sprayers attached to tractors or other approved vehicles and/or hand sprayers where applicable by a state-certified applicator. Applications within 50 feet of a surface water shall be conducted with a herbicide approved for aquatic use, specifically a drinking water source. Herbicide application should follow all applicable guidelines. The Contractor shall comply with Federal Insecticide, Fungicide, and Rodenticide Act (Title 7 U.S.C. Section 136) for requirements on contractor's licensing, certification and record keeping. Herbicides shall be applied by a State of Colorado Certified Herbicide Applicator. The Certified Applicator shall follow the EPA approved label(s) and State of Colorado requirements.Empty containers shall be disposed of as solid waste offsite and in accordance with Federal, State, Regional and Local laws and regulations. Herbicide formulations shall be mixed or poured into spray equipment within designated staging areas. These staging areas must be located away from the floodplain, irrigation canals or locations where groundwater, irrigation water or drinking water could potentially become contaminated. The Contractor shall not allow equipment to overflow. Prior to application of herbicide, all equipment shall be inspected for leaks, clogging, wear, or damage and shall be repaired prior to being used. The equipment operator shall keep a spill kit on within the immediate area, including absorbent pads that can be used to contain any drips or spills that may result from filling or operating the equipment. Any equipment in disrepair shall be removed from the site immediately. For applications of pesticides which results in a discharge to Waters of the United States the Contractor shall comply with the U.S. EPA National Pollutant Discharge Elimination System (NPDES) Pesticide General Permit (PGP) for Discharges from the Application of Pesticides. The Contractor shall comply with the Albuquerque District's Pesticide Discharge Prevention Plan (PDPP) and shall provide all information required for necessary updates to the PDPP and annual reporting, as identified in Section 7 of the PGP. The areas targeted for herbicide application have the potential for difficult access and tripping or falling hazards. Large rocks and a steep grade may require the Contractor to implement appropriate safety precautions. No cutting or spraying should occur beyond the limits of the dam face and groin. Boundaries will be reviewed on site with the USACE POC. Work shall be performed in a manner that will limit disturbance to the dam face and groin. There shall be no disturbance to the soil surface. Areas that are disturbed shall be restored to preconstruction condition as approved by the USACE POC.Prior to Award, the Contractor shall prepare a Pesticide Management Plan and submit the plan for Corps approval. Include in the plan: sequence of treatment, dates, times, locations, pesticide trade name, EPA registration numbers, authorized uses, chemical composition, formulation, original and applied concentration, application rates of active ingredient (i.e. pounds of active ingredient applied), equipment used for application, calibration of equipment and departures from the manufactures specifications. Federal, State, Regional and Local pest management record keeping and reporting requirements as well as any additional Project Office specific requirements shall be fulfilled. All employees shall read and comply with all Safety Data Sheet(s) (SDS) and work related materials before usage. SDS information shall remain on site. Additional environmental protection requirements; Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and evaporation. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed in accordance with State, and local laws and regulations. All project materials shall be recycled to the extent possible. Solid waste generation shall be minimized throughout the duration of the project.

More opportunities from Department Of Defense → W075 Endist Albuquerque

Same awarding agency

NAICS: 237310
New
Federal
Special Notice - Announcement of Industry Day - Progressive Design-Build (PDB) Other Transaction (OT) for FY28 High Speed Test Track, Holloman Air Force Base, Otero County, Mexico
Solicitation # W912PP27Z1CUU
The U.S. Army Corps of Engineers, Albuquerque District, is issuing a special notice for a Progressive Design-Build Other Transaction agreement under the authority of 10 U.S.C. 2808a for the FY28 High Speed Test Track at Holloman Air Force Base in Otero County, New Mexico. This Firm-Fixed-Price project focuses on the repair and upgrade of critical infrastructure, including girder repair and restoration, the replacement of 3,963 linear meters of track connection tie-down points, the widening and replacement of STAPP East and West access roads, and repairs to the Camera Pad Road. The completed track must maintain an operational lifespan of at least ten years beyond construction. The procurement will follow a streamlined, two-step competitive selection process to identify the most qualified progressive design-build entity. In the first step, interested parties must submit a Statement of Qualifications, and up to three selected companies will proceed to the second step, which consists of pitch meetings. The project is structured into two phases: Phase 1 covers design and pre-construction services, while Phase 2 encompasses final design and construction. Cybersecurity Maturity Model Certification requirements will be determined based on guidance available during the first step of the request. Interested parties are advised to monitor sam.gov for the official solicitation announcement and complete proposal instructions.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 14 days
View Details
NAICS: 236220
Federal
REQUEST FOR INFORMATION/SOURCES SOUGHT
Solicitation # W912PP27RA003
The U.S. Army Corps of Engineers Albuquerque District is conducting a sources sought market survey for the construction of the Space Rapids Capabilities Office at Kirtland Air Force Base in New Mexico. This preliminary planning effort seeks to identify qualified industry sources for a competitive, firm-fixed-price, design-bid-build contract. The project involves the construction of a 67,833 square foot, two-story facility featuring controlled office spaces, a 200-seat auditorium, and specialized infrastructure including reinforced foundations and secure communications. The estimated construction value is between 50 million and 100 million dollars, with an anticipated solicitation issuance date around April 22, 2027. Key requirements for the project include compliance with Department of Defense antiterrorism and force protection standards, as well as Unified Facilities Criteria for permanent construction. The facility must support controlled networks and accreditation with physical and electronic security measures. Prospective prime contractors must demonstrate experience with ICD 705 and AV/ESS requirements, the design-bid-build process, and federal antiterrorism provisions. Additionally, the scope includes the installation of a LenelS2 OnGuard alarm system, requiring all contracted personnel to hold a Secret security clearance and adhere to DD Form 254 specifications. The government is also soliciting feedback on the potential use of Project Labor Agreements for this large-scale effort.
Commercial and Institutional Building Construction

POSTED

11 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
Federal
Combined Synopsis/Solicitation for; W912PP25RA009 INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR CIVIL WORKS PLANNING STUDIES AND ASSOCIATED DESIGN ARCHITECT-ENGINEER (A-E) SERVICES, ALBUQUERQUE DISTRICT, N
Solicitation # W912PP25RA009
Solicitation W912PP25RA009 is an Indefinite-Delivery, Indefinite-Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Civil Works planning studies and associated Architect-Engineer (A-E) services supporting the U.S. Army Corps of Engineers (USACE) Albuquerque District. The contract covers a regional area of operations spanning New Mexico, Southern Colorado, and Southwest Texas. With a shared capacity of 49.9 million dollars, the government intends to award contracts to five to seven firms across unrestricted and small business reserve pools. The scope of work includes interdisciplinary design, hydrologic and hydraulic analysis, river modeling, and construction support for water resource structures such as dams and levees. Selection is based on professional qualifications per the Selection of Architects and Engineers Statute, with a primary focus on specialized experience in flood control studies within the Albuquerque District. Evaluation criteria include professional qualifications, past performance over the last seven years, capacity to execute simultaneous task orders, and knowledge of the locality. Minimum requirements include proficiency in AutoCAD Civil 3D, ESRI products, and familiarity with USACE Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE). Offerors must submit a complete SF330 via the Procurement Integrated Enterprise Environment (PIEE) portal by November 6, 2026.
Engineering Services

POSTED

14 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS