Fawndale Culverts Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation (Caltrans), District 2 – Redding, is advancing the Fawndale Culverts Project to replace 32 deficient culverts along Interstate 5 in Shasta County between post miles R20.3 and R27.9. The project aims to restore proper drainage function and structural integrity to aging culverts that exhibit severe deterioration, including rusted inverts, displaced joints, collapsed pipes, and blockages, which threaten highway stability and could lead to costly erosion or failure. Work will be executed using three primary methods: cut and cover replacement, trenchless replacement, and culvert liner rehabilitation, with excavation depths reaching up to 20 feet generally and 40 feet at one location. Approximately two acres of soil will be disturbed, and construction traffic will be managed through lane and shoulder closures. Access to work sites will be maintained through existing easements, temporary access roads—including a 10-foot-wide road built from a private driveway at PM 26.26—and a designated staging area near Fawndale Road. Coordination with Union Pacific Railroad is required for work within their right-of-way at PM R27.53, and permanent easements will be acquired at select locations to support future maintenance. The project must be completed within a single 120-day construction season under the oversight of Caltrans using state and federal funding, with no borrow sites anticipated and all excavated material becoming the contractor’s property. Environmental compliance is critical, requiring adherence to multiple permits including the Army Corps of Engineers Nationwide Permit for Section 404 activities, Regional Water Quality Control Board Section 401 certification, and California Department of Fish and Wildlife Section 1602 Agreement for streambed alterations. The project has been determined eligible for a CEQA categorical exemption under Section 15301 as it involves the replacement of existing facilities without significant environmental impact. While the solicitation is posted as a forecast with no formal contract number or pricing details, the primary point of contact for the project is Carolyn Sullivan, Senior Environmental Planner, who oversees environmental coordination and permitting. All work is confined to Caltrans’ right-of-way, temporary construction easements, or federal lands, with no additional utility conflicts anticipated beyond those already identified.

General Info

Caltrans replaces 32 deteriorated culverts on I-5 in Shasta County using cut-and-cover, trenchless, and liner methods within 120 days.

Agency

California → Caltrans, District 2 - Redding

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Interstate 5, post miles R20.3 to R27.9, CA

Set-Aside

NONE

Documents

(1)

Fawndale Culverts Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Carolyn SullivanSenior Environmental Planner

Full Description

Show more
The California Department of Transportation (Caltrans), using State and federal funding,is proposing to replace 32 culverts on Interstate 5 (I-5) in Shasta County. The limits of work occur between post mile (PM) R20.3 to R27.9. Purpose The purpose of this project is to replace and rehabilitate existing deficient (fair and poor condition) culvert systems to meet current and future drainage needs and restore the integrity of the highway. Need The District’s Culvert Investigation Team has inventoried and assessed the condition of all the existing culverts on this section of Route 5 in Shasta County. Based on the investigations, culverts along this segment are aged, deteriorated, and failing to adequately convey surface water flows, with deficiencies including rusted-out inverts, displaced joints, collapsed pipe, and blockages. Failing culverts result in erosion of material around the culverts which could lead to increased cost for highway rehabilitation and/or collapse of sections of highway. Project Description Culvert maintenance would be accomplished using three methods: cut and cover replacement, trenchless replacement, and culvert liner rehabilitation. Approximately 2.0 acres of soil would be disturbed during project implementation. Generally speaking, the maximum excavation depth is estimated at 20 feet. At PM R27.83, trenchless replacement depth is estimated at 40 feet. Clearing and grubbing would be required. Where applicable, project construction traffic control would be accomplished through lane and shoulder closures. Right-of-Way The proposed work would occur within the Caltrans’ right-of-way, permanent State easements, temporary construction easements, and federal lands. In support of future maintenance activities, Caltrans would acquire permanent right-of-way easements at select culvert locations. The culvert at PM R27.41 would be accessed from the south using an existing ±10-foot wide by ±260-foot-long bench located on the cut slope immediately east of the Bridge Bay Road off-ramp. The culvert at PM 26.26 (western portion) would be accessed via a private driveway on Wonderland Boulevard, as well as construction of a temporary access road. The private driveway does not extend to the highway. Thus, a ±10-foot-wide access road would be constructed from the driveway terminus to the culvert. Staging The proposed project would utilize an existing staging site located on the eastern side of I-5 at Fawndale Road (PM R26.05 to R26.20). Disposal/Borrow Sites Disposal material would become the property of the contractor. No borrow sites are anticipated. Utilities At PM R27.53, culvert replacement would occur within Union Pacific Railroad (UPR) right-of-way. A Right of Entry permit and coordination with UPR would be required. All other utilities in proximity to the work locations would be protected in-place. No other utility conflicts are anticipated. Schedule The work would be completed in one construction season and would require approximately 120 days to complete. Consultation/Coordination Caltrans performed a records review, field surveys, and consultation/coordination with applicable agencies, tribes, and individuals. Permits Based on the current scope, the project would be subject to the following resource agency permits: Army Corps of Engineers Nationwide Permit (Section 404 permit) Regional Water Quality Control Board Water Quality Certification (Section 401 permit) California Department of Fish and Wildlife Lake and Streambed Alteration Agreement (Section 1602 Agreement)