Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on September 23, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FEMA Loading Dock Repairs

Awarded
FEMALoadingDockRepairsFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

FEMA Region 1 is soliciting quotes for a firm-fixed-price contract to perform cement and drainage repairs on the loading dock at the Federal Regional Center in Maynard, Massachusetts. The project scope includes repairing cement areas, specifically addressing approximately 40 areas with exposed rebar, and implementing a drainage configuration for the loading dock roof to prevent soil erosion. This procurement is a 100 percent total small business set-aside under NAICS code 236220, with an estimated construction magnitude between 25,000 and 100,000 dollars. The selected contractor must provide all supervision, labor, materials, and equipment, ensuring all work complies with state, local, and federal laws, including the Davis Bacon Act wage determination MA20220001. The period of performance is 90 days from the date of award. Proposals are evaluated based on price, technical approach, and past performance, with price being the primary factor. Requirements for submission include a detailed breakdown of materials and labor, a description of the scope of work with warranty information, and references to two similar projects. All workers must be vetted by FEMA Security, and the contractor is responsible for all necessary permitting and filings. Depending on the final contract value, payment protections or bonds may be required in accordance with FAR 28.102.

General Info

Contract Value

$53,520

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

39625, MA, 01754, USA

Set-Aside

SBA

Award Issued Date

Documents

3

General Decision Number MA20220001 - Massachusetts Building Construction

PDF, High priority: read this firstwage-determination
High

Questions.docx

DOCX, Low priorityq-and-a
Low

Loading+Dock+Cement+Hoist+Drainage+SOW.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 31, 2022 to Sep 6, 2022. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Region 1: Emergency Preparedness An
Contacts1 person available
OfficeBOSTON, MA, 02109, USA
Office AddressBOSTON, MA, 02109, USA
Contacts
Christopher Kelly

Full Description

Show more
This is a Combined Synopsis/Solicitation for commercial services prepared in accordance with the format in FAR Subpart 12.6, Acquisition of Commercial Service and FAR Part 13, Simplified Acquisition Procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals and a written solicitation will not be issued. The Solicitation FEMA Loading Dock Repairs issued as a Request for Quotation (RFQ). Submit written offers only, oral offers will not be accepted. This Combined Synopsis/Solicitation requires registration with the System for Award Management (SAM) at the time a quote is submitted, excluding outlined in FAR 4.1102(a). Registration information can be found at https://www.sam.gov/SAM/. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2022-07 dated 08/10/2022. The complete text of any of the clauses and provisions may be accessed in full text at https://www.acquisition.gov/browse/index/far. This procurement is a Firm Fixed Price 100% Total Small Business Set-Aside, and the associated North American Industry Classification System (NAICS) Code is 236220, Commercial and Institutional building construction Product Service Code: Z1AA. Construction Magnitude: In accordance with FAR 36.204-Disclosure of the magnitude of construction projects, (b) Between $25,000 and $100,000. Description of Requirements: FEMA Region 1 is looking to perform various repairs and alterations to the cement loading dock located at the Federal Regional Center (FRC) 63 Old Marlboro Road Maynard, MA 01754. The repairs include, but not limited to: cement repairs, and drainage repairs of the loading dock roof. The current loading dock roof does not have any downspouts/drainage plan and is eroding the soil in the surrounding area. CLIN 00001 PART NUMBER N/A DESCRIPTION Cement repairs, and drainage configuration Period of Performance will start the day award is received by the vendor and completed within 90 days. The contractor shall coordinate the exact dates and times of delivery and installation with the COR. The contractor shall ensure that all local, state, federal and industry standard practices. Contractor is responsible for all paperwork, filing, permitting etc. if required. Address: 63 Old Marlboro Road Maynard, MA 01754 Site visit: Optional site visit to tour the project area: Wednesday 08/24/2022 at 11:00 AM EST Prior confirmation for attendance must be received via email. Valid Government-issued IDs are required at security gate. Late entries may not be allowed to tour site. Questions & Answers: All questions, if applicable are due Friday 08/26/2022 at 05:00 PM EST Proposals: All quotes are due by Tuesday 09/06/2022 at 05:00 PM EST. All RFQ responses shall be submitted via email to: Christopher.kelly@fema.dhs.gov Any and all questions regarding this solicitation shall be submitted in writing to: Christopher.kelly@fema.dhs.gov The Government will award a Firm-Fixed Price purchase order resulting from this combined synopsis/solicitation to the responsible offeror whose offer conforming to the synopsis/solicitation will be most advantageous to the Government, price and other factors considered. Best Value: All proposals will be assessed for the following three factors and all factors other than price when combined, are approximately equal to, or significantly less important than cost or price. Price Factor- Please include breakdown of materials and labor. Technical Approach- Description of scope of work, please include any manufacturer warranty and workmanship warranty info as well. Please provide any applicable diagrams or pictures of the proposed drainage configuration with your proposal. Past Performance � Include reference to two (2) projects of similar scope. If past performance is not available, a neutral rating will be given. The contractor shall provide all supervision, labor, materials, equipment, and supplies necessary to complete this scope of work. All work shall comply with all applicable State, local, and Federal laws and regulations, and all contract special provisions, terms and conditions. Security requirements: All workers must be vetted and receive prior approval to work onsite by FEMA Security. Wage Determination: All work under this contract will be performed within the confines of the Federal Regional Center (FRC). The Wage Determination: Davis Bacon Act: WD# MA20220001 Modification #9 Type: Building Dated August 05,2022 State: Massachusetts County: Middlesex Town: Maynard is applicable for this solicitation. Once the solicitation is posted, it is incumbent upon the interested parties to review the beta.sam.gov site frequently for any updates/amendments to all documents. Interested parties must be registered in SAM (System for Award Management) Database https://www.sam.gov prior to contract award pursuant to FAR provision 5.207. Bonding Requirements 28.102 Performance and payment bonds and alternative payment protections for construction contracts. 28.102-1 General. (a) 40 U.S.C.chapter 31, subchapter III, Bonds (formerly known as the Miller Act), requires performance and payment bonds for any construction contract exceeding $150,000, except that this requirement may be waived- (1) By the contracting officer for as much of the work as is to be performed in a foreign country upon finding that it is impracticable for the contractor to furnish such bond; or (2) As otherwise authorized by the Bonds statute or other law. (b) (1) Pursuant to 40 U.S.C. 3132, for construction contracts greater than $35,000, but not greater than $150,000, the contracting officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives: (i) A payment bond. (ii) An irrevocable letter of credit (ILC). (iii) A tripartite escrow agreement. The prime contractor establishes an escrow account in a federally insured financial institution and enters into a tripartite escrow agreement with the financial institution, as escrow agent, and all of the suppliers of labor and material. The escrow agreement shall establish the terms of payment under the contract and of resolution of disputes among the parties. The Government makes payments to the contractor�s escrow account, and the escrow agent distributes the payments in accordance with the agreement, or triggers the disputes resolution procedures if required. (iv) Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the contracting officer, in an acceptable form, executable by the contracting officer. (v) A deposit of the types of security listed in 28.204-1 and 28.204-2. (2) The contractor shall submit to the Government one of the payment protections selected by the contracting officer. (c) The contractor shall furnish all bonds or alternative payment protection, including any necessary reinsurance agreements, before receiving a notice to proceed with the work or being allowed to start work. 28.102-2 Amount required. (a) Definition. As used in this subsection- Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award. (b) Contracts exceeding $150,000- (1) Performance bonds. Unless the contracting officer determines that a lesser amount is adequate for the protection of the Government, the penal amount of performance bonds must equal- (i) 100 percent of the original contract price; and (ii) If the contract price increases, an additional amount equal to 100 percent of the increase. (2) Payment bonds. (i) Unless the contracting officer makes a written determination supported by specific findings that a payment bond in this amount is impractical, the amount of the payment bond must equal- (A) 100 percent of the original contract price; and (B) If the contract price increases, an additional amount equal to 100 percent of the increase. (ii) The amount of the payment bond must be no less than the amount of the performance bond. (c) Contracts exceeding $35,000 but not exceeding $150,000. Unless the contracting officer determines that a lesser amount is adequate for the protection of the Government, the penal amount of the payment bond or the amount of alternative payment protection must equal- (1) 100 percent of the original contract price; and (2) If the contract price increases, an additional amount equal to 100 percent of the increase. (d) Securing additional payment protection. If the contract price increases, the Government must secure any needed additional protection by directing the contractor to- (1) Increase the penal sum of the existing bond; (2) Obtain an additional bond; or (3) Furnish additional alternative payment protection. (e) Reducing amounts. The contracting officer may reduce the amount of security to support a bond, subject to the conditions of 28.203-3(c) or 28.204(b). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/far/ The following provisions and clauses apply to this acquisition: 52.252-2 Clauses Incorporated by Reference (Feb 1998). 52.212-1, Instructions to Offerors�Commercial Items, applies to this acquisition. Provisions. 52.212-3, Offeror Representations and Certifications�Commercial Items, with Alternate I, applies to this acquisition. The Offeror shall complete only paragraph (b) of FAR Provision 52.212-3 (with Alternate I) if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Website located at https://www.sam.gov/portal. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (r) of FAR Provision 52.212-3 (with Alternate I) and submit with their offer. Provisions 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition. Clause 52.212-5 -- Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (Jan 2019) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) Provision and Clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items. 52.204-19 Incorporation by Reference of Representations and Certifications. 4.1202(b) Clause 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. 4.2004 Clause 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment. 4.2105(a) Provision 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. 4.2105(b) Clause 52.204-26 Covered Telecommunications Equipment or Services-Representation. 4.2105(c) Provision 52.216-24 Limitation of Government Liability. 16.603-4(b)(2) Clause 52.216-25 Contract Definitization. 16.603-4(b)(3) Clause 52.216-25_Alternate I 16.603-4(b)(3) Clause 52.222-50 Combating Trafficking in Persons. 22.1705(a)(1) Clause 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. 23.1105 Clause 52.225-13 Restrictions on Certain Foreign Purchases. 25.1103 Clause 52.225-25 Prohibition on Contracting With Entities Engaging in Certain Activities or Transactions Relating to Iran�Representation and Certifications. 25.1103(e) Provision 52.232-39 Unenforceability of Unauthorized Obligations. 32.706-3 Clause 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. 32.009-2 Clause 52.233-3 Protest after Award. 33.106(b) Clause 52.233-3_Alternate I 33.106(b) Clause 52.233-4 Applicable Law for Breach of Contract Claim. 33.215(b) Clause 52.244-6 Subcontracts for Commercial Items. 44.403 Clause 52.236-2- Differing Site conditions 52.228-15- Performance and Payment Bonds-Construction 52.228-16 Performance and Payment Bonds-Other Than Construction PAPER COPIES OF THIS SOLICITATION WILL NOT BE ISSUED AND TELEPHONE REQUESTS OR FAX REQUESTS FOR THE SOLICITATION WILL NOT BE ACCEPTED.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS