Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on September 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FEMA Region 2 Naval Weapons Station Earle Building C-54 Comprehensive Facility Upgrades

Closed
70FBR226R00000016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Solicitation # W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
The U.S. Army Corps of Engineers, supporting the U.S. Air Force, is conducting market research via a Request for Information to identify qualified industry partners for seven construction and renovation projects at Wright-Patterson Air Force Base, Ohio. These projects range in scope from the renovation of sensitive Special Access Program spaces and the construction of a 90,000 square foot research laboratory to the modernization of compressor facility systems, the decentralization of heating plants, and the repair of military dormitories. The estimated acquisition magnitudes for these individual efforts vary significantly, with the largest project valued at approximately 160 million dollars. The government intends to utilize Other Transaction Agreements and a Progressive Design-Build delivery method, which splits the work into a collaborative design and pre-construction phase followed by a construction phase based on a Guaranteed Maximum Price. Interested firms must provide detailed company profiles, evidence of cybersecurity compliance through CMMC and SPRS, and experience with complex MEP infrastructure and secure facility standards. Responses are due by November 2, 2026, and should be submitted to the primary point of contact in PDF format.
W072 Endist Louisville

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 9 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 9 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

FEMA Region 2 is soliciting a firm-fixed-price contract for comprehensive facility upgrades to Building C-54 at Naval Weapons Station Earle in Colts Neck, New Jersey. This small business set-aside project focuses on enhancing safety, accessibility, and operational reliability to support disaster response missions. The scope of work includes the installation of ADA-compliant automated exterior access doors and interior wood doors, modernization of the Regional Response Coordination Center (RRCC) with new flooring, acoustic glass walls, and electrical and network infrastructure for workstations, and the reinforcement of the training room wall for future audio-visual enhancements. Additionally, the contractor will perform exterior cement repairs, sidewalk expansions, and patio renovations. The acquisition is a best-value procurement conducted under FAR Part 12.203, where technical specifications and past performance are weighted as slightly more important than price. Award will be based on a technical/price tradeoff. Offerors must provide a technical proposal limited to 20 pages and a business proposal including a CLIN pricing sheet in Excel format. Key requirements include compliance with New Jersey Building Codes, adherence to Davis-Bacon wage determinations, and the provision of performance and payment bonds totaling 100 percent of the contract price. Proposals must be submitted via email to the designated points of contact by September 14, 2026, at 4:00 pm ET.

General Info

FEMA Region 2 seeks small business bids for facility upgrades at NWS Earle.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Colts Neck, NJ, 07722, USA

Set-Aside

SBA

Documents

46

70FBR226R00000016_0001 Attachment P - CLIN Pricing Proposal

XLSX, High priority: read this firstspecifications
High

70FBR226R00000016_0001 Attachment P: CLIN Pricing Proposal

PDF, High priority: read this firstspecifications
High

70FBR226R00000016/0001 - FEMA Region 2 Building C-54 Facility Upgrades

PDF, High priority: read this firstamendment
High

70FBR226R00000016_0001 Q&A - Naval Weapons Station Earle Building C-54

PDF, High priority: read this firstq-and-a
High

70FBR226R00000016 Contractor Assurance Statement

PDF, High priority: read this first2 pages · sow
High

70FBR226R00000016 Exterior Door Replacement Specifications

PDF, High priority: read this firstsow
High

70FBR226R00000016 RFP - FEMA Region 2 Building C-54 Upgrades

PDF, High priority: read this first81 pages · rfp
High

70FBR226R00000016 RFP - FEMA Region 2 NWSE Building C-54 Upgrades

PDF, High priority: read this first77 pages · rfp
High

70FBR226R00000016 RFP for FEMA Region 2 Building C-54 Upgrades

PDF, High priority: read this firstrfp
High

70FBR226R00000016 Statement of Contractor Assurance

PDF, High priority: read this firstnotice-to-offerors
High

70FBR226R00000016 – Statement of Work for Building C-54 Upgrades

PDF, High priority: read this firstsow
High

Attachment D - RRCC Scale Diagram

PDF, High priority: read this firstspecifications
High

Attachment G - CLIN Pricing Proposal Excel Sheet

XLSX, High priority: read this first2 pages · rfq
High

Attachment G - CLIN Pricing Proposal Excel Sheet

XLSX, High priority: read this firstpricing-sheet
High

Attachment G - CLIN Pricing Proposal Excel Sheet

PDF, High priority: read this first1 page · other
High

Attachment G - CLIN Pricing Proposal Excel Sheet

PDF, High priority: read this first1 page · sow
High

Attachment G - CLIN Pricing Proposal Sheet

PDF, High priority: read this firstsow
High

Attachment G - CLIN Pricing Proposal Sheet

XLSX, High priority: read this first2 pages · rfq
High

Attachment J-RRCC Wall and Doors Picture 6

PDF, High priority: read this firstspecifications
High

Building C-54 Comprehensive Facility Upgrades SOW

PDF, High priority: read this firstsow
High

Consolidated Requirement - Technical Evaluation Factors

PDF, High priority: read this firstspecifications
High

Electrical Components Price List - April 2026

PDF, High priority: read this firstspecifications
High

FEMA Notice to Offerors - Statement of Contractor Assurance

PDF, High priority: read this firstspecial-notice
High

FEMA Region 2 Emergency Contactless Testing - Attachment I

PDF, High priority: read this firstspecifications
High

NJ20260037 Davis-Bacon Wage Determination Mod 1

PDF, High priority: read this first9 pages · wage-determination
High

NJ20260037 Wage Determination Mod 1

PDF, High priority: read this first9 pages · wage-determination
High

Planar Video Wall Project Summary - Design 1 (DLPro 1.2M20)

PDF, High priority: read this firstspecifications
High

RFP Attachment E - Technical Evaluation Factors (Consolidation Requirement)

PDF, High priority: read this first3 pages · rfp
High

RFP Evaluation Factors - Consolidated Requirement (RRCC Refresh)

PDF, High priority: read this first3 pages · rfp
High

RFP Evaluation Factors - Consolidated Requirement (RRCC Refresh)

PDF, High priority: read this firstevaluation-factors
High

SOW for Comprehensive Facility Upgrades, Building C-54, NWSE

PDF, High priority: read this first13 pages · sow
High

Specifications for Exterior Door Replacement - July 28, 2026

PDF, High priority: read this first11 pages · sow
High

Specifications for Exterior Door Replacement - July 28, 2026

PDF, High priority: read this first8 pages · sow
High

Specifications for Exterior Door Replacement - NWS Earle Bldg C-54

PDF, High priority: read this firstspecifications
High

Statement of Work for Building C-54 Upgrades, dated July 23, 2026

PDF, High priority: read this first13 pages · sow
High

Wage Determination NJ20260037 Mod 1

PDF, High priority: read this firstwage-determination
High

70FBR226R00000016_0001

PDF, Low priority1 page · other
Low

70FBR226R00000016 - Notice to Offerors: Statement of Contractor Assurance

PDF, Low priority2 pages · other
Low

70FBR226R00000016 Page 54 of 77

PDF, Low priority1 page · other
Low

Attachment E-RRCC Wall and Doors Picture 1

PDF, Low priorityspecifications
Low

Attachment F-RRCC Wall and Doors picture 2

PDF, Low priorityother
Low

Attachment G-RRCC Wall and Doors Picture 3

PDF, Low priorityspecifications
Low

Attachment H-RRCC Wall and Doors Picture 4

PDF, Low priorityspecifications
Low

Attachment K-RRCC Wall and Doors Picture 7

PDF, Low priorityother
Low

NJ20260037 Wage Determination Mod 1

PDF, Low prioritywage-determination
Low

NWSE Building C-54 A100 Floor Plan Attachment B

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 11, 2026 to Sep 14, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Region 2
Contacts2 people available
OfficeNew York, NY, 10007, USA
Office AddressNew York, NY, 10007, USA
Contacts

Full Description

Show more

The Federal Emergency Management Agency (FEMA) hereby issues this Request for Proposal (RFP) Amendment 0001 for Region 2 Building C-54 at Naval Weapon Station Earle in New Jersey Comprehensive Facility Upgrades. The upgrades will enhance safety, accessibility, operational reliability, and compliance with all applicable standards to support FEMA’s mission requirements.


The contractor shall provide all labor, equipment, tools, materials, parts, and supplies that are necessary to perform the facility infrastructure upgrades at Building C-54 at Naval Weapons Station Earle in New Jersey in the forms of interior / exterior doors replacements and upgrades, exterior cement repairs and patching of loading dock and adjacent areas, sidewalk expansion of warehouse dock to building side door, reinforcement and finish restoration of the designated training room wall to support future audio-visual enhancements and Regional Response Coordination Center (RRCC) workspace modernization to ensure safe, secure, and reliable operations in support of disaster response and ongoing FEMA mission needs.


RESPONSES: Responses regarding this RFP Amendment 0001 shall be directed via email to brenda.cruzrodriguez@fema.dhs.gov and a copy to brendaliz.pinero@fema.dhs.gov. All responses must be received no later than Monday, September 14, 2026, at 4:00 pm ET.


Amendment 001: Contract Opportunity has been updated and Solicitation amended to include the following supporting documentation:


- Solicitation Amendment 70FBR226R00000016_0001


- Attachment A - Statement of Work CONSOLIDATED-Doors_RRCC_Wall_Concrete_v8_09/09/2026
- Attachment B - NWSE Building C-54 A100 Floor Plan
- Attachment C - Specifications for Doors NWSE
- Attachment D - RRCC Scale Diagram
- Attachment E - RRCC Wall and Doors Picture 1
- Attachment F - RRCC Wall and Doors Picture 2
- Attachment G - RRCC Wall and Doors Picture 3
- Attachment H - RRCC Wall and Doors Picture 4
- Attachment I - RRCC Wall and Doors Picture 5
- Attachment J - RRCC Wall and Doors Picture 6
- Attachment K - RRCC Wall and Doors Picture 7
- Attachment L - Training Room-Planar Video Wall 8x4 DLP 1.2 2K Nit
- Attachment M - Notice to Offerors-Statement of Contractors Assurance
- Attachment N - Evaluation Factors
- Attachment O - Wage Determination Davis Bacon No. NJ20260037 Mod 1 dated 05/18/2026
- Attachment P - CLIN Pricing Excel Sheet (Updated)


- Q&A: Questions and Answers updated as 09/09/2026


- Q&A: Question #16 Reference

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS