Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fiber Cables

Awarded
N0025324P0035Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price contract requires a certified telecommunications contractor to engineer, furnish, install, and test new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting several critical facilities, including Radar Approach Control, the Air Traffic Control Tower, Base Operations, the Command Post, and various flightline and meteorological equipment such as Localizers, Glide Slopes, and TACAN. Installation will utilize a combination of existing manhole/handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, tools, and labor, as no government-furnished equipment will be provided. The procurement is a 100% set-aside for Women-Owned Small Businesses under NAICS 335921. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, based on evaluations of design, quality control plans, and performance history via the Supplier Performance Risk System. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Contractors must comply with strict base access security protocols, environmental regulations regarding hazardous materials and lead-based paint, and technical standards including TIA 526-7 for fiber optic testing. All payment requests must be processed electronically through the Wide Area WorkFlow system.
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 335921
New
DIBBS
CABLE ASSEMBLY, FIBE
Solicitation # SPE7M1-27-T-0166
Solicitation SPE7M1-27-T-0166 is a fixed-price request for quotations issued by the DLA Weapons Support Maritime Supply Chain for the procurement of three fiber optic cable assemblies. The required items are identified as Scientific Research Corporation part number N513-128-30 with NSN 6020017266731. The need ship date and original required delivery date are both set for May 31, 2027, with a delivery lead time of 226 days. Inspection and acceptance will occur at the destination, and the items are to be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Specific fiber optic packaging requirements include the use of Method 10-Physical Protection, a non-injurious cleaning and drying process, and the use of neutral wraps on cable ends. Cables must be supplied on spools or reels with a minimum 6-inch diameter or in secured coils of at least 6 inches in diameter, placed in close-fitting boxes conforming to PPP-B-566, PPP-B-676, or ASTM-D5118. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Offerors must comply with the Buy American Act, the Berry Amendment, and various FAR and DFARS clauses regarding cybersecurity, trafficking in persons, and hazardous material labeling. Quotations were due by October 16, 2026, via the DLA Internet Bid Board System.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

4 days ago

DEADLINE

in about 15 hours

General Info

Contract Value

$128,191.22

NAICS

335921 - Fiber Optic Cable Manufacturing

Place of Performance

Keyport, WA, 98345, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Naval Undersea Warfare Center
Contacts1 person available
OfficeKEYPORT, WA, 98345-7610, USA
Office AddressKEYPORT, WA, 98345-7610, USA
Contacts
Genelle Murray

More opportunities from Department Of Defense → Naval Undersea Warfare Center

Same awarding agency

NAICS: 541330
New
Federal
Keyport Infrastructure Security Support Services (KISSS)
Solicitation # N0025326R0001
The Naval Undersea Warfare Center (NUWC) Division Keyport is issuing a pre-solicitation notice for the Keyport Infrastructure Security Support Services (KISSS) requirement. This effort is a total small business set-aside restricted to SeaPort-NxG Multiple Award Contract holders who are registered in the Procurement Integrated Enterprise Environment (PIEE). The contemplated contract is a Cost-Plus-Fixed-Fee (CPFF) vehicle with a period of performance consisting of a base year and four one-year option periods. The primary objective is to provide infrastructure and security support for the Corporate Operations Department (Code 10), specifically supporting the Infrastructure Division (Code 102) in safety and environmental compliance and facilities management, and the Security Division (Code 105) in force protection, personnel security, and information systems security. Key operational requirements include strict adherence to federal, state, and local environmental regulations for hazardous materials management, as well as compliance with DoD standards for encrypting Controlled Unclassified Information (CUI). The contractor must implement a comprehensive quality system aligned with the Quality Assurance Surveillance Plan (QASP) and the Performance Requirements Summary (PRS). Personnel requirements include one senior Key Personnel position, with specific roles such as Safety Representatives and Fire Inspectors requiring Secret security clearances and T3 background investigations. Administrative requirements include submitting monthly invoices for COR review prior to WAWF submission and adhering to NIST SP 800-171 and NUWCDIVKPT cybersecurity programs. The anticipated RFP release is scheduled for October or November 2027.
Engineering Services

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 336412
New
Federal
Refurbishment of Torque Motor Magnetic Field Ring Assemblies
Solicitation # N0025326R7006
Solicitation N0025326R7006, issued by the Naval Undersea Warfare Center Division Keyport, is for an Indefinite-Delivery Indefinite-Quantity contract focused on the refurbishment and repopulation of torque motor magnetic field ring assemblies, also known as DMISA rings. The scope of work involves the depopulation of existing magnets, refurbishment including potential grinding to meet final dimensions, and the installation of new magnets for plated steel and stainless steel azimuth and elevation rings. The government intends to order a maximum of 2,540 units, with specific government furnished property limits of 635. Deliveries are generally required within 180 calendar days after receipt of government furnished property, with a performance period extending through April 2032. The contract will be awarded using the Lowest Price Technically Acceptable process, evaluating offerors on technical capability and past performance. Key requirements include compliance with NAVSEA drawings 7447999 Rev I and 7448000 Rev F, and the submission of a Test and Inspection Data Sheet with every delivery. Access to secured drawings requires JCP and CMMC certifications. Recent amendments have removed the ISO 9001:2015 quality management system requirement and extended the response deadline to October 27, 2026. All shipments must adhere to strict packaging standards, including the use of government-supplied foam and specific magnetic content labeling, with inspection and acceptance occurring at the destination in Keyport, Washington.
Aircraft Engine and Engine Parts Manufacturing

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 238210
Federal
UPS Refurbishment
Solicitation # N0025327Q7001
The Naval Undersea Warfare Center Division Keyport is soliciting requests for quotations under RFQ N0025327Q7001 for the refurbishment of an Eaton 9390 UPS system (Serial Number EG112CBC11) located in Building 893. This firm fixed price requirement is issued as a limited source procurement restricted to authorized Eaton distributors to ensure mission-critical power continuity and compatibility with proprietary components. The scope of work includes the removal and disposal of internal components such as power modules, control boards, and batteries, followed by the installation of new modules and commissioning performed by a certified Eaton technician. The period of performance is 90 calendar days from the date of award, with deliverables including testing documentation, electronic as-built drawings, and laminated operating instructions affixed to the unit. This solicitation is set aside for Economically Disadvantaged Women-Owned Small Businesses under NAICS 238210. To be considered for award, offerors must provide an OEM letter of authorization and maintain a CMMC Level 1 (Self) certification. Evaluation will be based on technical acceptability, with the final award determined by a best-value trade-off analysis considering price and past performance, specifically regarding quality and delivery. All offers must be submitted digitally via email by October 29, 2026. Contractors are required to comply with strict Navy security, safety, and environmental regulations, including Base Access Visitor Request (BAVR) procedures for site entry and adherence to the Keyport Contractor Guide for hazardous materials management.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

13 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS