Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Final Assembly, Integration, and Quality Testing

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract encompasses the final assembly and integration of all system components, requiring strict adherence to the technical data package to ensure full conformance. This includes conducting comprehensive functional testing such as open and close cycles, lock engagement verification, and pressure testing to validate operational integrity under specified conditions. All test results and assembly processes must be meticulously documented to demonstrate compliance with quality standards and technical requirements, forming a complete record of performance and acceptance criteria. This subcontract under the Department of Defense, managed by the Defense Logistics Agency, is classified under NAICS code 336419 and was posted for potential bidders on July 21, 2026. The work is expected to be performed without specified geographic limitations, and the contract is part of a broader defense supply chain effort. The procurement is not set aside for any specific small business category, and the official record can be accessed through the DIBBS system using the provided contract and delivery identifiers.

General Info

Final assembly and integration with strict testing and documentation for DoD under NAICS 336419.

Agency

Department Of Defense → Defense Logistics AgencyView Agency

NAICS

336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of SPEA4526F3772.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DOOR, ACCESS, AIRCRAF

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Defense Logistics Agency
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Defense Logistics Agency
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Final assembly of all components, functional testing (open/close cycle, lock engagement, pressure test), and documentation of conformance to technical data package.

Similar Contracts

Same NAICS industry code

NAICS: 336419
New
Federal
SR-1 Freedom Reactor Radiation Shielding Design/Build
Solicitation # INL-26-053
Battelle Energy Alliance (BEA), acting as the Management and Operating Contractor for the Department of Energy owned Idaho National Laboratory (INL), is seeking qualified firms for the design and fabrication of the Reactor Radiation Shielding (RRS) system for the NASA SR-1 Freedom interplanetary spacecraft. The RRS must protect spacecraft components from neutron and gamma photon radiation while operating in a space vacuum at temperatures ranging from -273°C to 800°C. Key technical requirements include a composite weight of less than 1200 kg and the ability to withstand launch forces and vibrations. The system must interface with the reactor structure, control drum actuators, Heat Management System heat pipes, and the Power Conversion System structure. The procurement process begins with an Expression of Interest (EOI) due by September 24, 2026, with a subsequent Request for Proposal (RFP) anticipated for late September or early October 2026. The final contract will be a firm-fixed price award executed in progressive phases, with the possibility of multiple firms being awarded design contracts before a final fabrication award is made. Project completion is required by July 2027. Qualified offerors must demonstrate expertise in radiation shielding design, transport modeling, and fabrication, and must maintain quality programs consistent with ISO 9001-2015 and ANSI/ASQC C1-1996 standards to be eligible for the INL Qualified Suppliers List.
Battelle Energy Alliance–doe Cntr

POSTED

1 day ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Defense → Defense Logistics Agency

Same awarding agency

NAICS: 335910
New
DIBBS
BATTERY, STORAGE
Solicitation # SPE7L7-26-Q-2418
Solicitation SPE7L7-26-Q-2418 is a firm-fixed-price request for quotations issued by the Defense Logistics Agency Land and Maritime for the procurement of sealed lead acid storage batteries, identified by NSN 6140-01-624-9682. The requirement consists of two line items totaling eight units, with two units for item 0001 and six units for item 0002. Approved sources include EnerSys Delaware Inc. (part numbers ODS-AGM6M or PC2250) and Stored Energy Products, Inc. (part number PC2250). These items are designated as critical application items and are restricted source items requiring engineering source approval by the government design control activity. The batteries are classified as Type I (Code H) with a non-extendable shelf life of 12 months. Delivery is required within 60 days after receipt of the order, with shipping terms set as FOB Destination. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and DLA packaging requirements RP001, while hazardous materials must be handled according to IP025 and FAR 52.223-3. Quality assurance will be managed through destination inspection and acceptance using sampling methods such as MIL-STD-1916 or ASQ H1331. Award will be based on cost alone for quotes that conform to the solicitation requirements. Quotations must be submitted by September 21, 2026, and payment will be processed electronically via the Wide Area WorkFlow system.
Battery Manufacturing

POSTED

about 24 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS