Final Environmental Impact Report Addendum

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Rosedale-Rio Bravo Water Storage District has adopted Addendum No. 3 to the Final Environmental Impact Report for the Stockdale Integrated Banking Project, authorizing modifications to include a new groundwater recharge facility on approximately 150 acres in unincorporated Kern County, California. This modified project involves constructing two recharge ponds, one recovery well, and five control structures to increase annual recharge capacity by 17,500 acre-feet, integrating with existing facilities to the south. Construction is expected to span 22 months and requires a well permit from the Kern County Environmental Health Division. The addendum concludes that the revised project will not introduce new significant environmental effects or substantially increase existing impacts, and no additional mitigation measures beyond those outlined in the original Final EIR are needed. Site-specific biota and cultural studies were completed and reviewed, confirming consistency with prior findings and supporting the decision to prepare an addendum rather than a supplemental or subsequent EIR, in accordance with CEQA Guidelines Section 15164. The project remains fully under the oversight of the Rosedale-Rio Bravo Water Storage District, which served as the lead agency throughout the environmental review process. No federal acquisition regulations apply, as the document is an environmental compliance addendum, not a procurement contract. There are no contract values, pricing details, or clause requirements typically found in federal contracting, and no formal contracting officer, contracting officer’s representative, or offeror certifications are identified. The primary point of contact is Rachelle Echeverria, Resources Planner, with all environmental approvals and compliance responsibilities resting with the District. The project site is located near Sidding Road and Enos Lane, with performance limited to construction and operation of the recharge infrastructure, and all environmental commitments will be fulfilled under the existing Mitigation and Monitoring Plan established in the original Final EIR.

General Info

Rosedale-Rio Bravo adds recharge facility on 150 acres in Kern County, increasing annual recharge by 17,500 acre-feet.

Agency

California → Rosedale-Rio Bravo Water Storage District

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Stockdale Integrated Banking Project Addendum No. 3

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Rosedale-Rio Bravo Water Storage District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Rosedale-Rio Bravo Water Storage District
Office AddressN/A
Contacts
Rachelle EcheverriaResources Planner

Full Description

Show more
Rosedale-Rio Bravo Water Storage District (Rosedale), as lead agency, has prepared and adopted an Addendum No. 3 to the Final Environmental Impact Report (EIR), State Clearinghouse No. 2013091076, describing modifications to the Stockdale Integrated Banking Project (Project). The Final EIR (FEIR) for the Project evaluated potential impacts from construction and operation of the Stockdale East and Stockdale West banking areas as well as the Central Intake and, as appropriate, on a third project site to be identified at a later date. Addendum No. 3 describes a Modified Project that involves the construction and operation of facilities on a portion of the third project site that has been identified since the adoption of the FEIR. Modified Project Facilities include a groundwater recharge facility consisting of two recharge ponds, one recovery well, and five control structures on approximately 150 acres. The Modified Project would provide approximately 17,500 acre-feet per year (AFY) of recharge capacity and would connect to existing Rosedale groundwater recharge facilities located south of the project site. Construction activities would occur over approximately 22 months. The Modified Project would require a well permit from the Kern County Environmental Health Division. The proposed modifications to the original Project would not result in new significant environmental effects or a substantial increase in the severity of previously identified significant effects. Furthermore, new information associated with the proposed modifications does not indicate that: the Project will have one or more significant effects not discussed in the adopted Final EIR; significant effects previously examined will be substantially more severe than shown in the adopted Final EIR; mitigation measures or alternatives previously found not to be feasible would in fact be feasible; or mitigation measures or alternatives which are considerably different from those analyzed in the adopted Final EIR would substantially reduce one or more significant effects on the environment, but the Project proponents decline to adopt the mitigation measures or alternative. Accordingly, an addendum has been prepared as opposed to a supplemental or subsequent EIR. Additional site-specific biota and cultural studies were completed and considered in the Addendum. Findings and proposed mitigation measures are the same as those found in the FEIR and will be complied with by RRBWSD. The proposed modifications would not result in new or more severe significant impacts that would not be addressed by the existing Mitigation and Monitoring Plan. The Rosedale-Rio Bravo Water Storage District has adopted the Addendum in accordance with the CEQA Guidelines Section 15164.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
Federal
PROJECT VA GWMP CLI-CULTURAL RESOURCE SURVEY
Solicitation # 693C7326Q000015
The contract is a Request for Quotation issued by the Federal Highway Administration’s Eastern Federal Lands Highway Division for the development of a Cultural Landscape Inventory for the Spout Run Parkway segment of the George Washington Memorial Parkway in Arlington, Virginia, covering approximately 46 acres bounded by the Memorial Parkway to the north, Interstate 66 to the south, the North Highland neighborhood to the east, and the Woodmont neighborhood to the west. The contractor must possess specialized expertise in cultural resource surveying and be capable of conducting technical analyses to produce a comprehensive final inventory that includes a narrative and graphic chronology of physical history, an integrity assessment, a condition evaluation, treatment recommendations, maps, GIS geodatabases, and supporting documentation adhering to National Park Service standards, including the NPS Cultural Landscapes Inventory Professional Procedures Guide (2025), the Secretary of the Interior’s Standards for Archeology and Historic Preservation, and the Chicago Manual of Style (18th Edition). All deliverables must comply with Section 508 accessibility requirements, be produced using NAD83 (2011) datum for GIS data, and follow the NPS Core Data Standards model, with final GIS layers requiring explicit approval by NPS GIS staff. The contract is firm-fixed price and requires itemized cost breakdowns for all tasks, including reimbursable travel expenses limited to GSA per diem rates for McCalla, Alabama, with receipts mandatory for airfare, rentals, and miscellaneous costs, and administrative expenses must detail actual hours and costs. Award will be determined based on best value rather than lowest cost, evaluating proposed methods and techniques, contractor qualifications and experience alongside price, with no small business set-aside and no formal weighting system provided. Contractors must maintain an active SAM registration with up-to-date UEI, CAGE, and tax information and affirm representations related to entity responsibility, non-inversion, tax compliance, and small business status. The contract incorporates unique clauses including a deviation of FAR 52.212-4 for commercial services, a requirement to comply with 52.222-90 prohibiting racially discriminatory DEI activities, and mandates for electronic invoicing through the DOT’s Delphi eInvoicing portal accessed via Login.gov, with a copy emailed to the FHWA COR. All work product becomes the sole property of the U.S. government, and contractors may retain only copies. Performance is required through December 30, 2027, with final government acceptance scheduled from August
693C73 Eastern Federal Lands Division

POSTED

about 13 hours ago

DEADLINE

in 4 days
View Details
NAICS: 541620
New
Federal
F107--Asbestos Baseline Survey Northern California VA Health Care System
Solicitation # 36C26126Q1100
The Department of Veterans Affairs, through its Network Contracting Office 21, is seeking information from contractors capable of performing an Asbestos Baseline Survey at the Northern California VA Health Care System under NAICS code 541620, with a small business size standard of $19 million. This is a sources sought announcement only, not a solicitation, and no binding commitments or payments are guaranteed. Responses must be submitted by email to Angela Gerlitzki no later than 10:00 a.m. EST on August 14, 2026, and must include the company’s legal name, SAM Unique Entity Identifier, socioeconomic status, certifications, capability statements, similar past projects, teaming or subcontracting plans complying with FAR and VAAR limitations, GSA contract number if applicable, and a completed price estimate. Participation requires current SAM registration and, for SDVOSB or VOSB firms, active certification in the SBA’s database. The anticipated period of performance is from September 8, 2026, to September 7, 2027, with the solicitation number 36C26126Q1100 to be referenced in all communications. All submissions will be used solely by the VA to inform future procurement decisions and will not be disclosed outside the government. Failure to provide all requested information will result in a non-responsive submission.
261-NETWORK Contract Office 21 (36C261)

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details