Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Final Subsequent EIR for the Update to 2018 UC San Diego La Jolla Campus LRDP

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The University of California, San Diego is implementing the La Jolla Medical Center Outpatient Pavilion Project, which involves the construction of an approximately 180,000-square-foot outpatient healthcare facility. Located north of the Shiley Eye Institute on a site currently used as a surface parking lot, the project is part of the 2018 La Jolla Campus Long Range Development Plan as amended in 2025. The scope of work includes comprehensive environmental evaluations to ensure consistency with the Program EIR and Subsequent EIR under CEQA guidelines, as well as geotechnical services including soil sampling, field reconnaissance, and a Refraction Micro-tremor survey. Key deliverables include an Addendum to the LRDP SEIR, a Geotechnical Evaluation Report, a Drainage Study, and a Fire and Life Safety Code Report. The project adheres to strict regulatory and design standards, including CEQA Guidelines, the Public Resources Code, and UC San Diego Design Guidelines. Special requirements mandate compliance with OSHA regulations for excavation and personnel safety, adherence to the university's Lighting Policy using shielded fixtures, and specific bird safety measures limiting untreated glass to less than 35 percent of the lower three levels. The project was determined not to result in new significant environmental effects, and the associated addendum is scheduled for approval by The Regents of the University of California during their September 14 to 16, 2026 meeting, followed by the filing of a Notice of Determination.

General Info

UCSD proposes building a 180,000-square-foot outpatient pavilion at La Jolla Medical Center.

Agency

University of California, San Diego

Place of Performance

Campus Point Drive, East Medical Center Drive, San Diego, CA, 92093

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California, San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
University of California, San Diego
Office AddressN/A
Contacts
Lauren LieversPrincipal Environmental Planner

Full Description

Show more
The proposed La Jolla Medical Center Outpatient Pavilion Project is the next implementing project of the UC San Diego 2018 La Jolla Campus Long Range Development Plan, as amended in 2025. The proposed project would construct an approximately 180,000-square-foot outpatient pavilion building in the UC San Diego Health La Jolla Medical Campus, supporting outpatient healthcare services. The site is currently developed with a surface parking lot and is located north of the Shiley Eye Institute and has a land use designation of Academic Healthcare. The university has determined that the proposed project would not result in any new significant effects on the environment or a substantial increase in the severity of previously identified effects addressed by the LRDP EIR and SEIR, no substantial changes have occurred with respect to the circumstances under which the Project will be undertaken which will require major revisions of the previous EIRs due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects, and no new information of substantial importance to the Project has been identified as defined by CEQA Guidelines Section 15162(a)(3). Minor technical additions were necessary such as new project design details, and in accordance with §15164 of the State CEQA Guidelines, an Addendum to the LRDP SEIR has been prepared. Pursuant to CEQA Guidelines § 15164, an addendum does not require circulation for public review. This document will be considered for approval by The Regents of the University of California during their September 14–16, 2026 meeting. A Notice of Determination will be filed following the meeting.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environment, Health & Safety (EHS) - EP3 Consulting
Solicitation # RFP-0012438-PPS-2026
The University of Michigan has issued solicitation RFP-0012438-PPS-2026 to retain a variety of environmental consulting experts to support the Environment, Health and Safety (EHS) Department. The primary scope of work covers the university's campuses in Ann Arbor, with additional consideration given to the proximity of team members to Dearborn and Flint, Michigan. The university seeks partners capable of delivering high-quality reports in various digital and physical formats and those with experience utilizing state and federal reporting platforms such as the MiEnviro Portal, EPA systems, and EGLE online tools. All tasks must adhere to relevant quality standards, including ASTM standards, and the university requires a detailed quality assurance and quality control program to ensure regulatory compliance. The anticipated contract term is for three years, with the possibility of two additional one-year extensions. Pricing is based on hourly rates and equipment fees submitted via a specific rates spreadsheet, with the requirement that prices remain firm for at least three years. Payment terms are Net 0 days for suppliers using an accepted virtual card program, or Net 45 days for others. Evaluation factors for award include supplier background, service delivery capabilities, pricing, and compliance with the university's standard terms and conditions. Additionally, suppliers must demonstrate compliance with ADA and Section 508 standards, meet WCAG 2.1 Level AA accessibility requirements for digital content, and provide details regarding their cybersecurity programs. Proposals are due by November 23, 2026.
University of Michigan

POSTED

about 2 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541620
New
SLED
Campus Consulting – Hazardous Materials Testing Services
Solicitation # RFP2026-07AM
California State University, Chico has issued solicitation RFP2026-07AM for hazardous materials testing and consulting services. The selected service provider will support the university through planning and design services, including the identification of hazardous materials, development of abatement strategies, and project management for testing and air sampling. The scope also encompasses industrial hygiene services such as water and air testing, chemical exposure analysis, indoor air quality evaluations, and staff training. Key deliverables include detailed survey and sampling reports, with all-clear monitoring results required to be submitted to the project manager within 24 hours of completion. The contract is a non-exclusive agreement with a performance period of one calendar year from the date of execution. All work must adhere to strict regulatory standards, including the National Emission Standards for Hazardous Air Pollutants as adopted by the California Air Resources Board, the Asbestos Hazard Emergency Response Act, and California Division of Occupational Safety and Health requirements. The consultant will report to the Director of Design and Construction, and payments will be made in arrears based on a fee schedule, negotiated fees, or the CSU standard fee schedule, subject to approval by the university project manager.
California State University, Chico

POSTED

about 6 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541620
New
SLED
ENVIRONMENTAL TRUST Comprehensive E mergency Management Plan Update & Environmental Engineering and Consulting Services
Solicitation # Environmental-Trust_RFP_FY-2027_Emergency-Plan-Update-Environmental-Services_10202026.pdf
The Confederated Tribes of the Colville Reservation is seeking professional services for a combined maximum budget of $289,497, divided into two primary functional areas. The first area, Emergency Management Planning, is capped at $150,000 and involves updating the 2014 Comprehensive Emergency Management Plan, developing Emergency Support Functions, creating hazard-specific annexes, and establishing the Tribes' first Continuity of Operations Plan and Tribal Threat and Hazard Identification and Risk Assessment. This scope also includes the development of an all-hazards tabletop exercise package and the facilitation of coordination workshops to integrate these planning components. The second area, Environmental Engineering and Consulting Services, is capped at $139,497 and focuses on technical field operations in Nespelem, Washington. Key tasks include biannual groundwater monitoring and testing at the Nespelem Post and Pole site, as well as the characterization, removal, and lawful disposal of hazardous materials at the Nespelem Recycle Center. The contractor must adhere to strict quality standards, including the use of approved Quality Assurance Project Plans and Health and Safety Plans, and provide detailed verification reports. Mandatory monthly progress reports are required for all activities, and all project communication costs must be integrated into the respective task budgets. TERO fees are handled separately by the Tribal Employment Rights Office and are not included in the scope of work budget.
Confederated Tribes of the Colville Reservation

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS