This Solicitation opportunity from Michigan was posted on October 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Almont Community Schools Orchard Primary School Window Replacement RFP: This Request for Proposal (RFP) from Almont Community Schools solicits qualified contractors for the removal and replacement of select windows at Orchard Primary School in Almont, MI. Proposals are due by 12:00 noon on October 25, 2024, and must include completed bid forms and disclosures. The RFP outlines the scope of work, insurance requirements, submission instructions, and evaluation criteria. A pre-bid walkthrough is available by appointment. The project is scheduled to commence after the 2025 school year ends. The document emphasizes that cost is a factor but not the sole basis for award, and the district reserves rights to reject or negotiate proposals. Contact information for questions is provided.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Almont High School Fire Alarm Control Panel Replacement RFP: Request for Proposal issued by Almont Community Schools for the removal and replacement of the Fire Alarm Control Panel at Almont High School. The scope includes ensuring compatibility with existing fire protection equipment and integration with the kitchen Ansul Suppression system. Proposals are due by 12:00 noon on October 25, 2024. Submission requires a Bid Form, Contractor Information Form, and Familial Relationship Disclosure Form.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Almont High School Fire Alarm Control Panel Replacement RFP: This Request for Proposal (RFP) issued by Almont Community Schools solicits qualified contractors to submit proposals for the removal and replacement of the Fire Alarm Control Panel at Almont High School, located at 4701 Howland Rd, Almont, MI. Proposals must be submitted by 12:00 noon on October 25th, 2024, and include completed Bid Form, Bidding Contractor Information Form, and Familial Relationship Disclosure Form. The RFP outlines the scope of work, insurance requirements, and submission instructions. A pre-bid walk-through is available by appointment. The district reserves the right to evaluate proposals subjectively and negotiate with bidders. The document includes contact information for questions and specifies that proposals must be sealed and mailed; electronic submissions are not accepted.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Almont High School Fire Alarm Control Panel Replacement RFP: Almont Community Schools is soliciting proposals for the removal and replacement of the Fire Alarm Control Panel at Almont High School. The scope includes ensuring compatibility with existing fire protection equipment and tying into the kitchen Ansul Suppression system. Proposals must be submitted in a sealed envelope by 12:00 noon on Friday, October 25, 2024. Requirements include a completed Bid Form, Bidding Contractor Information Form, Familial Relationship Disclosure Form, and proof of specific insurance coverages (General Liability, Workers Compensation, and Motor Vehicle Liability). Pre-bid walk-throughs are available by appointment during the weeks of October 14th and 21st.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Almont High School Fire Alarm Control Panel Replacement RFP: This Request for Proposal (RFP) issued by Almont Community Schools solicits qualified contractors to submit proposals for the removal and replacement of the Fire Alarm Control Panel at Almont High School, located at 4701 Howland Rd, Almont, MI. The document outlines submission requirements, including completed bid forms and contractor information, insurance requirements, and references. It specifies a proposal deadline of October 25, 2024, and includes instructions for a pre-bid walkthrough. The RFP emphasizes that cost is a factor but not the sole basis for award, and the district reserves rights to negotiate and reject proposals. Contact information for questions is provided, and the document includes general conditions and scope of work details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Charlevoix Riser - Drawing 004: Technical drawing/specification document for a riser project at Charlevoix High School, involving Fantaseeintegration.com. The document includes project management fields and drawing reference 004.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Churchill High School Roof Remediation (24-017): Solicitation for sealed bids for roof replacement at Churchill High School, Central Offices, Webster Elementary School, and the Warehouse for Livonia Public Schools. The document includes a table of contents for specifications (Division 01 and 07), official bid requirements, and submission instructions. Bids are due by 10:00 a.m. on October 24, 2024.
PDF
PDF, High priority: read this firstadvertisement-for-bids
HighAI Summary for FPS BP3 Advertisement for Bids - Fraser High School Parking Lot Renovations: This Advertisement for Bids dated October 8, 2024, is issued by Barton Malow Builders on behalf of Fraser Public Schools for the Fraser Public Schools 2023 Bond - BP#3 project involving Fraser High School Parking Lot Renovations. It invites potential bidders to submit electronic bid proposals by 12 pm on October 24, 2024, via Building Connected. The document outlines bid categories, mandatory pre-bid conference details, bid security requirements, and contract conditions including performance bonds and insurance. Bidding documents are available from October 8, 2024, and the project is not subject to prevailing wage rates. The successful bidder will enter into a contract using the AIA Document A132-2019 Standard Form of Agreement.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Inner Saginaw Bay Reef Restoration Project: Project description and technical merits for the Inner Saginaw Bay Reef Restoration in Bay County, MI. The document outlines the goal to restore approximately 2 acres of constructed reef to enhance fish production for species like lake trout and cisco, utilizing natural substrates. It details the project's alignment with GLRI Action Plan III and the Lake Huron Lakewide Action and Management Plan, including plans for stakeholder workshops, engineering design, and construction timelines for FY2022 and FY2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Plans 24007 - Door Replacement and Access Control Upgrade: This document, titled Plans 24007, outlines specifications for replacing front and side entrance doors including the removal of existing mag locks and installation of doors with strike locks and panic bars. It includes requirements for handicap accessibility, fail-secured doors, and integration with a Fob access system. General notes emphasize contractor responsibilities for verifying dimensions, notifying project managers of field conditions, and compliance with manufacturer instructions. The document is issued by MDOT TSMO Facilities Engineering and serves as a technical guide for door replacement and access control system upgrades.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Project 25.01: Facilities Utilization Study 2024: Request for Proposal issued by Rochester Community Schools on October 17, 2024, seeking qualified firms to conduct a districtwide Facilities Utilization Study. The study aims to evaluate the efficiency of 26 buildings (approx. 2.8 million sq ft) to optimize resources and instructional programming. Proposals are due by November 5, 2024, via BidNet Direct. Evaluation criteria include company history, team experience, approach, and references. The anticipated award date is November 18, 2024, with a project completion deadline of March 31, 2025.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for RFP 240000003166 Medical Consultation and Medication Oversight Review: This document is a Request for Proposal (RFP) issued by the Michigan Department of Health and Human Services for Medical Consultation and Medication Oversight Review. The RFP number is 240000003166, with key dates including the issue date on September 24, 2024, question deadline on October 1, 2024, proposal deadline on October 22, 2024, and anticipated contract start date on March 1, 2025. It provides detailed proposal instructions, mandatory minimum requirements for bidders including licensure and certification, evaluation criteria, and submission guidelines. The document emphasizes electronic submission through the SIGMA VSS system and notes that all proposal materials become public record upon receipt.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for RFP 250000000137 Electrofishing Boat, Outboard and Trailer Package: This document is a Request for Proposal (RFP) No. 250000000137 issued by the Department of Natural Resources Fisheries Division for a brand-specific Smith-Root Electrofishing Boat, Outboard and Trailer Package. The RFP includes detailed proposal instructions, submission deadlines, contact information, and evaluation criteria. Key dates include the RFP issue date of October 18, 2024, question deadline October 24, 2024, proposal deadline November 1, 2024, and anticipated contract start date November 8, 2024. The RFP requires bidders to submit several mandatory documents including a Brand Comparison, Vendor Questions Worksheet, Statement of Work, and Pricing. The document emphasizes electronic submission via SIGMA VSS and outlines the evaluation process based on pass/fail criteria for submitted documents.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for RFP 250000000138 Addendum 1 - Bidder Q&A for Lycoming Engine Exchange: This document is Addendum #1 to RFP #250000000138 issued by Michigan State Police for the procurement of a Lycoming Factory Overhauled or Rebuilt Engine Exchange. It contains bidder questions and official answers, clarifying that the specific engine model requested is the Lycoming TIO-540-AJ1A for a 2003 Cessna 206H aircraft, Serial Number T20608400. The addendum provides additional specification details to assist bidders in preparing their proposals.
DOCX
DOCX, High priority: read this firstrfp
HighAI Summary for RFP 25-0048 PRMX Elementary School FMP Series 1-A: This document is a Request for Proposal (RFP) numbered 25-0048 for the PRMX Elementary School FMP Series 1-A project. It provides a link to the proposal and attachments related to this RFP. The document serves as a primary solicitation for the project, inviting proposals from interested parties.
PDF
PDF, High priority: read this firstsow
HighAI Summary for TL 3 - 1st Floor Demo Notes for Charlevoix Middle/High School Auditorium: This document titled '1st Floor Demo' dated 5/23/24 provides detailed demolition notes for electrical and lighting components at Charlevoix Middle/High School Auditorium in Michigan. It specifies removal and replacement instructions for cables, lighting fixtures, switches, and Unison stations on the 1st floor. The notes include removal of existing CFL lamps, fluorescent lamps, lighting tracks, and various types of light fixtures to prepare for LED retrofits. The document is drawn by R. Blain and serves as a statement of work for the auditorium light upgrades project in 2024.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Tyler and Savage Elementary Schools Secured Entry Renovations Project Bid Advertisement: This document is an Invitation for Bid (IFB) issued by Van Buren Public Schools for the Tyler and Savage Elementary Schools Secured Entry Renovations Project. It announces the bid submission deadline of October 29, 2024, at 2:00 p.m. local time, with bids to be submitted electronically. A non-mandatory pre-bid conference is scheduled for October 10, 2024, via Microsoft Teams. The document outlines bid security requirements, including a 5% bid bond or cashier's check, and mentions the need for performance and payment bonds. It also requires several affidavits related to familial relationships, Iran Economic Sanctions Act compliance, criminal background disclosure, and non-collusion. Bid documents are available for download starting October 8, 2024, through Building Connected. The Board of Education reserves rights regarding bid acceptance and contract award.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Van Buren Public Schools - Tyler and Savage Elementary Schools Secured Entry Renovations Bid Advertisement: An advertisement for sealed bid proposals for the Tyler and Savage Elementary Schools Secured Entry Renovations Project. Bids are due by 2:00 p.m. on October 29, 2024, and must be submitted electronically via Building Connected. The notice includes details for a non-mandatory pre-bid conference on October 10, 2024, bid security requirements (5%), and mandatory disclosure affidavits.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.