Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on December 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Alarm Inspection, Maintenance and Repair - Dorchester Penitentiary, Springhill Institution and Nova Institution for Women

Closed
21207-25-4879951International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561621
New
Centennial Fire Alarm & CO Detection Upgrade and Maintenance Services
Solicitation # centennial-fire-alarm-co-detection-upgrade-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to provide fire alarm and carbon monoxide (CO) detection upgrade and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The primary objective is to restore the central Simplex 4020 Fire Alarm Control Center Panel and connected systems across nine campus facilities to full operational status. The scope of work includes diagnosing and clearing system trouble statuses, upgrading the panel motherboard or firmware if necessary, and integrating CO detection into the men's and women's dormitories by installing intelligent multi-criteria detectors and sounder bases. All work must adhere to NFPA 101 (2024), NFPA 72 (2025), IFC (2024), and local building and fire codes. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit is required prior to bid submission. For bids equal to or exceeding $25,000, contractors must provide a bid bond for 20% of the base bid, as well as performance and payment bonds equal to 100% of the contract price from an A-rated surety company. This project is subject to the Davis-Bacon Act/Construction Wage Rate Requirements, requiring the payment of prevailing wages and the submission of weekly certified payroll reports for payment processing. The contract is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Evaluation is based on overall best value, with MTC serving as the sole judge of responsiveness. Key deliverables include field service reports, signed NFPA 72 inspection and maintenance forms, and structured digital asset reports for CMMS integration. Final payment is contingent upon a successful final inspection, the submission of operation and maintenance manuals, and the delivery of a notice of final completion and a certificate of release of liens.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 561621
New
SLED
Physical Security Event Monitoring System
Solicitation # RFP GGS-27-0439
The City of Phoenix Water Services Department is soliciting proposals under RFP GGS-27-0439 for the installation and maintenance of a Physical Security Event Monitoring System (PSEMS). This system is critical for controlling secure access to water and wastewater facilities to meet regulatory performance requirements and prevent unauthorized site access. The scope of work includes the deployment of a new PSEMS, with the City managing the network infrastructure. Key deliverables include a Site Method of Procedure, a Site Acceptance Test covering door-level functionality and alarm routing, and comprehensive as-built engineering documentation. Award decisions will be based on the best value, with evaluation weights heavily favoring experience and capability (480 points) and method of approach (475 points) over the pricing proposal (106 points). To qualify, offerors must pass a data privacy risk screening, demonstrate five years of stable ownership and core staffing, and hold Certified Integrator Certification for Software House hardware and software. Contractors must adhere to NIST Cybersecurity Framework and OSHA regulations, obtain police department security clearances for all personnel, and comply with the Public Transit Department's Disadvantaged Business Enterprise - Neutral (DBE-N) program. Administrative requirements include submitting invoices in PDF format to a designated email with a City purchase order number, with final payments issued within 60 days of delivery. Proposals must be submitted via the OpenGov portal by December 21, 2026, and must include a signed Heat Safety Compliance form and an IRS W9 to be considered responsive.
Water Services

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 561621
New
SLED
FFY2027 COUNTER-UNMANNED AIRCRAFT SYSTEMS GRANT PROGRAM
Solicitation # BD-27-1044-EPS11-1044O-135411
The FFY2027 Counter-Unmanned Aircraft Systems (C-UAS) Grant Program, managed by the Massachusetts Executive Office of Public Safety and Security, provides funding to state and local entities to enhance their capabilities to detect, track, identify, and mitigate unmanned aircraft systems. Utilizing the POETE framework, the program focuses on protecting critical infrastructure and public safety through the deployment of detection systems, mobile mitigation equipment, and connectivity gear such as mesh or point-to-point links. All equipment must be compliant with the Authorized Technologies List and specific technical standards, including ASTM F3411-22a for remote ID receivers, while adhering to the American Security Drone Act of 2023 and constitutional protections. Applications must be submitted via the online portal by December 7, 2026, and must include a budget excel worksheet, an investment justification form, a SAM screenshot with a Unique Entity Identifier, and a risk assessment form. Awards are based on a cumulative scoring system of up to 100 points, with a preference for projects featuring mobile mitigation and support for NSSE, SEAR 1, or SEAR 2 events. Eligible applicants must be qualified public safety organizations capable of full implementation within 36 months, with a grant period of performance extending through December 31, 2028. Key requirements include NCUTC Mitigation Certification for personnel, FAA Part 107 certification, and compliance with Build America, Buy America guidelines.
Executive Office of Public Safety & Security

POSTED

about 24 hours ago

DEADLINE

in 23 days
NAICS: 561621
New
SLED
Fire Protection Sys and Equipmt Svcs for JCC-Saint Anthony
Solicitation # 1506
The Idaho Department of Juvenile Corrections is soliciting quotes for fire protection system and equipment services at the Juvenile Correction Center in Saint Anthony. The scope of work includes annual inspection and testing of the fire alarm system, sprinkler system, fire pump, and fire backflow and bypass, as well as annual testing of 120 fire extinguishers and a five-year inspection of the fire alarm system. Award will be made on an all-or-none basis to the responsive and responsible vendor offering the lowest total cost. The contract is anticipated to last no more than five years, including renewals, and requires technicians to have at least one year of experience and specific training in the equipment being serviced. Contractors must adhere to strict operational requirements, including mandatory criminal background checks and fingerprinting for all personnel, the maintenance of juvenile confidentiality, and the wearing of distinctive company uniforms while on site. Emergency response requires a technician to be on-site by 1 p.m. the next business day, or the agency reserves the right to seek services elsewhere. Administrative requirements include monthly invoicing with Net 30 payment terms, the submission of insurance certificates within five business days of award, and certifications regarding the boycott of Israel and ownership by the government of China. All bids must be submitted via the IPRO portal by the specified deadline.
State of Idaho

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 561621
New
International
bpha - Active Fire Safety Systems and Remedial Works
Solicitation # 1386
Bedford Pilgrims Housing Association (bpha) is seeking a single provider to manage the inspection, testing, servicing, maintenance, and repair of active fire safety systems across its residential property portfolio in the East of England. The scope of work includes fire detection and alarm systems, emergency lighting, smoke ventilation and dampers, and dry risers, alongside a 24-hour emergency call-out service, compliance reporting, waking watch, and temporary works. The selected provider will be required to integrate with bpha's asset management system and contact centre, with performance monitored through a framework of key performance indicators. The contract is estimated to start on 1 April 2027 for an initial three-year term, with options to extend for up to six years in total. The estimated value for the initial period is 1,890,000 GBP excluding VAT. The procurement is conducted via a two-stage Competitive Flexible Procedure under the Procurement Act 2023. In the first stage, bidders must pass a Procurement Specific Questionnaire covering eligibility, financial standing, and health and safety, while submitting a Quality Schedule scored on experience, competence, and service delivery. Shortlisted bidders will then proceed to a final stage involving a full specification, pricing, and an interview. The final award is based on a weighted combination of 60% quality and 40% price. Small and medium-sized enterprises are identified as particularly suitable for this contract. Tenders must be submitted electronically in English by 12 January 2027.
Bedford Pilgrims Housing Association (bpha)

POSTED

1 day ago

DEADLINE

in about 2 months
NAICS: 561621
New
SLED
Fire Alarm, Sprinkler System and Fire Extinguishers Maintenance Service Contract for Hagerstown DC/MSC
Solicitation # BPM059693
The Hagerstown Fire Alarm, Sprinkler System and Fire Extinguishers Maintenance Service Contract is a three-year agreement running from December 1, 2026, through November 30, 2029, for the Hagerstown DC/MSC facility. Managed by the Maryland Department of General Services, the contract covers the maintenance, preventive maintenance, and repair of fire alarm systems, sprinkler systems, and fire extinguishers. All work must be performed by the contractor's in-house personnel, as subcontracting is strictly prohibited. The contractor is required to adhere to NFPA standards, National Fire Codes, and manufacturer recommendations, utilizing qualified trained mechanics for all services. The contract will be awarded to the responsive and responsible bidder who submits the lowest base bid for the total three-year duration. Key performance requirements include quarterly preventive maintenance and a 24/7 emergency response capability with a two-hour response window for emergency calls and a two-calendar-day resolution period for minor breakdowns. Deliverables include detailed inspection reports provided to the Office of Facilities Management, service tickets left after every visit, and updated system drawings. Invoicing occurs monthly, with payments processed via Electronic Funds Transfer for contracts exceeding $200,000. Bidders must be registered under Maryland law and certify compliance with non-discrimination and drug-free workplace policies.

POSTED

1 day ago

DEADLINE

in 10 days

AI Contract Overview

Show more

Correctional Service Canada is seeking a contractor to provide comprehensive inspection, testing, maintenance, repair, and upgrade services for Simplex fire alarm systems at the Dorchester Penitentiary, Springhill Institution, and Nova Institution for Women. The scope of work includes annual inspections in accordance with CAN/ULC codes, 24/7 emergency response with a four-hour on-site arrival time, and the provision of all necessary labor, materials, and certified technicians. The contractor is responsible for maintaining a stock of genuine manufacturer replacement parts and providing detailed service activity reports and annual status reports in PDF format. This procurement is issued as an Advanced Contract Award Notice with Tyco Integrated Fire & Security Canada Inc. as the pre-identified supplier, cited as the sole provider with exclusive distribution and programming rights for Simplex equipment in New Brunswick and Nova Scotia. The proposed contract has an estimated value of 2,154,661.50 CAD, covering an initial ten-month period ending October 2, 2025, with options to extend for two additional one-year terms. Interested suppliers had until December 2, 2024, to submit a statement of capabilities demonstrating their ability to meet the minimum essential requirements.

General Info

Tyco will maintain Simplex fire alarms at three Canadian prisons for 2.15 million CAD.

Agency

Government of Canada → Correctional Service Canada

Place of Performance

*Canada *New Brunswick *Nova Scotia, CAN

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstspecial-notice
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Correctional Service Canada
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Correctional Service Canada
Office AddressN/A

Full Description

Show more
An advanced contract award notice (ACAN) is a public notice indicating to the supplier community that a department or agency intends to award a contract for goods, services or construction to a pre-identified supplier, thereby allowing other suppliers to signal their interest in bidding, by submitting a statement of capabilities. If no supplier submits a statement of capabilities that meets the requirements set out in the ACAN, on or before the closing date and time stated in the ACAN, the contracting officer may then proceed with the award to the pre-identified supplier. 1. Definition of the requirement: The Correctional Service Canada has a requirement to maintain the fire alarm systems as per proper Codes and Standards at the Dorchester Penitentiary, Springhill Institution and the Nova Institution for Women. The work will involve the following: 1.1 Objectives: The work under this Standing Offer Agreement includes but is not limited to the provision of all labour, materials, tools, supervision and equipment necessary for inspection, testing, maintenance, repair and upgrade of Fire Alarm Systems as requested. The Contractor must also provide emergency services on site, at CSC’s request, to bring the equipment back to operational status when it is not functioning according to its intended design. 1.2 Tasks: The Contractor must supply all labour, materials, tools, supervision and equipment required for inspection, testing, maintenance, repair and upgrade of the Simplex Fire Alarm Systems on an as requested basis. The Contractor must, upon arrival on site, submit a complete tools list. The Contractor must immediately report any missing or lost tools to the Correctional Managers desk. The Contractor must report to the site with a service vehicle which is well stocked with replacement parts to carry out repairs on the system in use in these facilities. The Contractor must remove and dispose of debris, used and obsolete material, on a daily basis. The Contractor must remove failed or broken devices like smoke detectors or smoke-carbon monoxide combo devices and ensure these devices are disposed of or recycled in an approved facility. Annual Requirements The Contractor must inspect and test the entire Fire Alarm System yearly in accordance with most recent CAN/ULC code. The Contractor must coordinate annual inspection and testing to ensure proper notification procedures are in place to avoid false alarms during the inspection and testing. The Contractor must not leave the fire protection and alarm system inactive at end of the working day without the Technical Authority’s authorisation. The Contractor must coordinate the annual inspection and testing date at the beginning of each calendar year with the CSC Project Authority. The lists of devices for each institution are provided in Tables 1 to 3. The Contractor must note that CSC provides these lists as a reference only as some minor variances may occur between the list and devices found on site. The Contractor must make reasonable effort to inspect and test all the devices found on site and report any devices missing from the lists back to the Technical Authority. The Contractor must notify the Technical Authority by phone within an hour and subsequently follow up with a written report by fax or e-mail within twenty-four hours of any damage or vandalism of the equipment by Canada and other parties. The Contractor must repair or replace any components damaged through any such negligent operation or misuse. CSC is responsible for any extra costs for repairs associated with negligent operation or misuse of the equipment by users. The Contractor must invoice these repairs separately on time and material basis consistent with the rates in the contract basis of payment. Original Equipment Manufacturer (OEM) The Contractor must have the manufacturer’s complete operational and adjustment procedures for the equipment concerned, including direct access to the manufacturer's technical support services and service bulletins. The Contractor must submit the manufacturer’s recommendations to the Technical Authority for review to maintain the equipment at its original performance level for trouble-free operations. The manufacturer, as applicable, may have proprietary rights to some or all of the equipment listed in Tables 1, 2 and 3 – Equipment Inventory. Should a need arise to test, inspect, reconfigure, replace or reprogram equipment to which the manufacturer has proprietary rights, the Contractor must advise the Technical Authority prior to performing any work. Deficiencies While the Contractor is on site and discovers deficiencies that can be repaired with available material from the Contractor’s stock, the Contractor must invoice these repairs as per the Basis of Payment of the standing offer. The Contractor must obtain the Technical Authority’s approval to proceed with this corrective work. For any repairs associated with the Equipment Inventory or ancillary components, or both, the Contractor must submit to the Technical Authority for review, within forty-eight (48) hours of the initial assessment, a comprehensive part and labour cost summary and the reason for the repair(s). The Contractor must not proceed with the proposed repairs without obtaining the Technical Authority’s prior consent, which the Technical Authority will confirm by issuing a call up against the standing offer. Emergency service The Contractor must advise the Technical Authority of the telephone number at which they or their representative may be contacted 24 hours a day, 7 days a week, including statutory holidays. The Contractor must provide emergency service during and after regular hours Monday to Friday within 7:00 a.m. to 5:00 p.m. with an on-site response time of 4 hours or another response time the Technical Authority has agreed to. The Contractor must respond to service calls 24 hours a day, 7 days a week including statutory holidays. For service calls outside regular work hours, the Contractor must contact the Technical Authority on the first working day after the call to obtain a call up number. Technician requirements The Contractor must send one licensed technician to respond to a service request. The Contractor must obtain the Technical Authority’s prior approval in writing or email before sending any additional licensed technicians or apprentice/labourers. The Contractor’s technicians must upon arrival to the site facility, provide identification (ID) and log into the institutional Visitor’s Register maintained at the facility’s Principal Entrance. Replacement Parts The Contractor must request direction from the Technical Authority prior to replacing any component. The Contractor must repair or replace worn or defective parts of the system(s) using only genuine manufacturer’s replacement parts. The Contractor must obtain the Technical Authority’s permission before using any replacement parts from another manufacturer. The Contractor must maintain a sufficient supply of replacement parts to minimize downtime associated with component failure. The Contractor must replace defective parts within twenty-four (24) hours of part availability or within a timeframe approved by the Technical Authority. 1.3 Expected results: To maintain the fire alarm systems’ reliable and sustainable operation for the remainder of the system’s useful life. The Contractor must have certified technicians performing the work as per applicable Provincial or Federal requirements. The technicians must maintain their applicable provincial certification to work in CSC’s Atlantic Region. 1.4 Performance standards: The Contractor must inspect, test, maintain, repair and upgrade the Fire Alarm System as per the appropriate codes and standards. The Contractor must conform to the following applicable Codes and Standards: 1. CAN/ULC-S536-19 Inspection and Testing of Fire Alarm systems. 2. CAN/CSA Control of hazardous energy – Lockout and other methods. 3. National Building Code 2020 and National Fire Code of Canada 2020. 4. the Canada Labour Code. 5. the Canada Occupational Health and Safety Regulations. 6. the Provincial Occupational Health and Safety Act. 7. the Occupational General Safety Regulations. The Contractor and their personnel must adhere to the Federal Government ‘No Smoking’ policy while in Federal facilities, and scent free policy where applicable. 1.5 Deliverables: 1.5.1 Report The Contractor must provide to the Technical Authority, after each visit, a written service activities report containing all details of work performed. When applicable, the Contractor must provide a written list of defects and deficiencies discovered during the visit with recommended corrective actions and an estimated quote to correct these defects and deficiencies. The Contractor must provide the annual Fire Alarm Report that describes the status of all fire alarm systems equipment. The Contractor must submit this detailed and comprehensive inspection report to the Technical Authority no later than ten (10) working days following the completion of the annual inspection and testing. The Contractor must include in the report the major and minor deficiencies noted during the inspections, tests, checks, maintenance and services defined within this Statement of Work. The Contractor must provide a budget estimate proposal to restore the system to 100% functionality with a breakdown of labour and parts. The Contractor must also identify in the report any modifications or improvements to the fire alarm equipment or system(s) that will enhance equipment serviceability, life expectancy and efficiency. The Contractor must present all documents within the report in Adobe Acrobat PDF format. 1.5.2 Paper consumption: a. Should printed material be required, double sided printing in black and white format is the default unless otherwise specified by the Project Authority. b. The Contractor must ensure printed material is on paper with a minimum recycled content of 30% and/or certified as originating from a sustainably managed forest. c. The Contractor must recycle unneeded printed documents (in accordance with Security Requirements). 1.6 Constraints: 1.6.1 Location of work: a. The Contractor must perform the work at the following locations: • Dorchester Penitentiary, 4902 Main Street, Dorchester, New Brunswick, E4K 2Y9 • Springhill Institution, 330 McGee Street, Springhill, Nova Scotia, BOM 1X0 • Nova Institution for Women, 180 James Street, Truro, Nova Scotia, B2N 6R8 b. Travel i. All costs related to travel must be incorporated into the all-inclusive rate per hour. Travel to the above locations will be required for performance of the work under this standing offer. 1.6.2 Language of Work: The contractor must perform all work in English. 1.6.3 Institutional Access Requirements Contractor personnel will be escorted at all times by Correctional Service Canada personnel or those authorized by CSC on its behalf. Contractor personnel must adhere to institutional requirements for the conduct of searches by Correctional Service Canada prior to admittance to the institution/site. Correctional Service Canada reserves the right to deny access to any institution/site or part thereof by any Contractor personnel, at any time. 2. Criteria for assessment of the statement of capabilities (minimum essential requirements): Any interested supplier must demonstrate by way of a statement of capabilities that it meets the following requirements: Professional designation, accreditation and/or certification: - The supplier must be a manufacturer approved distributor for the Simplex brand fire alarm systems in the region of New Brunswick for the Dorchester Penitentiary and Nova Scotia for the Springhill Institution and the Nova Institution for Women. 3. Applicability of the trade agreement(s) to the procurement This procurement is subject to the following trade agreements: Canada Chile Free Trade Agreement (CCFTA); Canadian Free Trade Agreement (CFTA); The procedural requirements of the other international trade agreements will be fulfilled following compliance to the procedural requirements of CCFTA and CFTA. 4. Set-aside under the Procurement Strategy for Indigenous Business This procurement is not subject to any set-asides for Indigenous Suppliers. 5. Comprehensive Land Claims Agreement(s) This procurement is not subject to a Comprehensive Land Claims Agreement. 6. Justification for the Pre-Identified Supplier The pre-identified supplier is the sole provider of Simplex fire alarm system inspection, testing, maintenance, repair and upgrade services for the areas. It also has a national agreement with the manufacturer for exclusive distribution and programming rights for Simplex branded fire alarm equipment for New Brunswick and Nova Scotia. The pre-identified supplier meets all of the minimum essential requirements described in this ACAN. 7. Government Contracts Regulations Exception(s) The following exception to the Government Contracts Regulations is invoked for this procurement under subsection: (d) only one company is capable of performing the contract. 8. Exclusions and/or Limited Tendering Reasons The following exclusion(s) and/or limited tendering reasons are invoked under the section of the trade agreement(s) specified: Canada Chile Free Trade Agreement (CCFTA) Article Kbis-09: b. where, for works of art, or for reasons connected with the protection of patents, copyrights or other exclusive rights, or proprietary information or where there is an absence of competition for technical reasons, the goods or services can be supplied only by a particular supplier and no reasonable alternative or substitute exists. Canadian Free Trade Agreement (CFTA), Article 513 (b) if the goods or services can be supplied only by a particular supplier and no reasonable alternative or substitute goods or services exist for any of the following reasons: (i) the requirement is for a work of art; (ii) the protection of patents, copyrights, or other exclusive rights; (iii) due to an absence of competition for technical reasons; (iv) the supply of goods or services is controlled by a supplier that is a statutory monopoly; (v) to ensure compatibility with existing goods, or to maintain specialized goods that must be maintained by the manufacturer of those goods or its representative; (vi) work is to be performed on property by a contractor according to provisions of a warranty or guarantee held in respect of the property or the original work; (vii) work is to be performed on a leased building or related property, or portions thereof, that may be performed only by the lessor; or (viii) the procurement is for subscriptions to newspapers, magazines, or other periodicals; 9. Ownership of Intellectual Property There are no intellectual property terms in the contract. 10. Period of the proposed contract or delivery date The proposed contract is for a period of ten (10) months, from date awarded to October 2, 2025 with an option to extend the contract for two additional one - year periods. 11. Cost estimate of the proposed contract The estimated value of the contract, including option(s), is $ 2,154,661.50 (GST/HST extra). 12. Name and address of the pre-identified supplier Name: Tyco Integrated Fire & Security Canada Inc. Address: 600 Windmill Road Dartmouth, NS B3B 1B5 13. Suppliers' right to submit a statement of capabilities Suppliers who consider themselves fully qualified and available to provide the goods, services or construction services described in the ACAN, may submit a statement of capabilities in writing to the contact person identified in this notice on or before the closing date and time of this notice. The statement of capabilities must clearly demonstrate how the supplier meets the advertised requirements. 14. Closing date and time for a submission of a statement of capabilities The closing date and time for accepting statements of capabilities is December 2, 2024 at 2:00 PM AST. 15. Inquiries and submission of statements of capabilities Inquiries and statement of capabilities are to be directed to: Penny Panayiotopoullos, Regional Contracting Officer 1045 Main Street Moncton, NB E1C 1H1 Telephone: Sign up to see this detail E-mail: Sign up to see this detail Table 1: Dorchester- Fire alarm panel component (Not limited) Devices Qty (Alarm System- Panel) Simplex 4007 1 (Alarm System- Panel) Simplex 4100ES 9 (Alarm System- Panel) Simplex 4100U 1 (Alarm System- Panel) Simplex 4100U 4 (Alarm System- Panel) Simplex 4100U, TSW, NDU 1 (AM) Manual Pull Station) 31 (AM) Manual Pull Station) Addressable Module 105 (AM) Manual Pull Station) Addressable Module 8 (AM) Manual Pull Station) Manual Pull Statuib 112 (COMBO) Combination Smoke & Heat Detector 129 (FS) Sprinkler Flow Switch 57 (GA) Manual Pull Station - 2nd Stage Key Switch 169 (H/S) Horn/Strobe 43 (HT) Heat Detector - Fixed Temperature 2 (IAM) Addressable Module - Input 29 (ISO) Addressable Module - Loop Isolator 55 (LPS) Sprinkler Low Pressure Switch 6 (LPS) Sprinkler Low Pressure Switch 1 (M) Manual Pull Station 1 (PS) Sprinkler Pressure Switch 24 (PULL) 28 (RELAY) 1 (RIAM) Addressable Module - Control Relay 29 (RZAM) Aux-Relay Control Zam 16 (S) Smoke Detector - Photo-Electric 1 (SBZAM) CLASS B SIGNAL ZAM 1 (TADSD) Duct Smoke Detector - True Alarm 2 (TAISD) 53 (TAPSD) True Alarm Phoelectric Smoke Detector 1 (TAPSD) True Alarm Photoelectric Smoke Detector 644 (TARHT) Heat Detector - Rate of Rise 121 (TARHT) Heat Detector - Rate of Rise - True Alarm 1 (TASD) Smoke Detector - Phoelectric (Note 1) 308 (TS) Valve Supervisory Switch 119 (V) Visual Appliance (Strobe) 8 Fire Panel - Simplex 4100U 4 Simplex 4007 1 Simplex 4100ES (Fire Alarm System) 3 Thermo 1 (AM) Manual Pull Station Addressable Module 47 (A/V) Audible / Visible Notification 277 (DH) Door Holder 41 Addressable Module (IAM/PS) 3 Addressable Module (IAM/TS) 45 RELAY 15 Addressable Module (IAM/FS) 5 Addressable Module (IAM/RHT) 1 (SCU) Status Command Units 1 (TAPDSD) True Alarm Photoelectric Duct Smoke Detector 1 Detector (CO/NO2) 1 (EOLR) End of line resistor 92 Addressable Module (IAM) 4 Addressable Module (IAM/FS) 10 Addressable Module (AM/FS) 3 Addressable Module (IAM/NO) 1 Addressable Module (IAM/NO) 1 PIEZO (mini horn) 1 (TAISD) Smoke detector 8 (TADS) Duct sensor 16 (TAPSDD) Smoke Detector 11 (K) Horn 106 (CZ) RELAY 23 (AUX) RELAY 14 (DHC) Door Holder 1 (Z1) RELAY 1 (AHT) RELAY 9 (AISD) RELAY 1 (ANN) RELAY 14 (APSD) RELAY 55 (DZ) RELAY 1 (FDS) RELAY 2 (FP) RELAY 22 (MZ) RELAY 39 (SZ) RELAY 8 (THAT) RELAY 6 (FACP) RELAY 1 (FFHJ) RELAY 12 (LCD) RELAY 3 (P) RELAY 1 (TAISDD) Smoke detector 1 (AHT) RELAY 73 (ASD) RELAY 3 (TEMP) RELAY 1 (APS) RELAY 3 (AVWP) Audio / Visible 3 (AFS) RELAY 10 (ATS) RELAY 9 (LAS) RELAY 1 (LW) RELAY 1 (LAPS) RELAY 1 Grand Total 3139 Table 2: Springhill - Fire alarm panel component. (not limited) Devices Qty (B) Bell 21 (DH) Door Holders 15 (DS) Duct Smoke Detector 4 (DSA) Duct Smoke Detector - Addressable 11 (DSTA) Duct Smoke Detector - True Alarm 22 (EOL) End of line Resistor 41 (EOL) End of line Resistor 2 (EOL) End of line Resistor End of line Resistor 2 (EOL) End of line Resistor End of line Resistor End of line Resistor 1 (FS) Flow Switch 85 (GA) General Alarm 8 (HS) Horn Strobe 21 (HT) Heat Detector - Fixed Temperature 14 (HTTA) Heat Detector - Fixed Temp. True Alarm 1 (HV) Horn Visual Combination 258 (IAM) Independent Addressable Monitor 9 (ISO) Mapnet Isolator Module 65 (ISO) Mapnet Isolator Module Mapnet Isolator Module Mapnet Isolator Module 12 (LCD) ANNUNCIATOR 3 (M) Manual Pull Station 46 (MA) Manual Pull Station - Addressable 156 (MA) Manual Pull Station - Addressable 6 (MH) Mini Horn 7 (PS) Sprinkler Pressure Switch 27 (RHT) Heat Detector - Rate of Rise 2 (RHTTA) Heat Detector - Rate of Rise - True Alarm 32 (RIAM) Remote IAM 72 (S) Smoke Detector - Photo-Electric 2 (SA) Smoke Detector - Addressable 374 (STA) Smoke Detector - True Alarm (Photo) 810 (TS) Sprinkler Tamper Switch 178 (V) Visual Appliance (Strobe) 56 (ZIAM) 1 Addressable board (ZIAM) 1 Annunciator (SCU) 1 Auxiliary (AUX) second stage pull station 4 Beam detectors (BD) 2 Chime 3 End of Line Resistor (EOLR) 13 Fire Panel - Simplex 4100ES 5 Fire Panel - Simplex 4100U 31 Fire Panel - Simplex 4120ES 1 Horn (H) 3 Mini Horn 2 Pull station second stage (ACT) 2 RELAY 68 Relay (AM) 2 RELAY (AM) 6 Relay (SOL) 1 Relay (SYC) 2 Remote Control Unit (RCU) 1 Second stage horn (EVAC) 8 Grand Total 2520 Table 3: Nova - Fire alarm panel component (not limited) Devices Qty Adressable wall-mounted single stage manual fire alarm pull station 94 Adressable wall-mounted two stage manual fire alarm pull station 8 Adressable ceiling mounted smoke detector 248 Adressable ceiling mounted smoke/CO detector 29 Adressable ceiling mounted heat detector 24 Adressable duct mounted smoke detector 10 Adressable input module 80 Adressable relay module 32 Adressable fault isolator module 9 Aspirating smoke detector 4 Wall-mounted Combination Horn/Strobe 141 Wall-mounted fire alarm strobe light 7 Supervised Flow switch 36 Supervised Pressure switch 12 Supervised gate valve tamper switch 58 Supervised Propane sensor 8 Electromagnetic door hold open device 3 Fire Alarm panel 114 Fire Alarm remote annunciator panel 6 Branch circuit panel 3 Door annunciator control panel 1 Door annunciator magnetic door contact 2 Grand Total 929

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS