Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Energy was posted on February 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Hydrant Replacement

Closed
INL-26-025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Idaho Falls, ID, 83415, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstexpression-of-interest
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
Contacts1 person available
OfficeIdaho Falls, ID, 83415, USA

Full Description

Show more

INTRODUCTION


Battelle Energy Alliance, LLC (BEA) Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors to provide fire hydrant replacement services at the Specific Manufacturing Capability (SMC) facility. This initiative supports BEA’s commitment to maintaining reliable fire protection systems and ensuring compliance with safety standards.


BACKGROUND


The SMC facility requires replacement of aging fire hydrants to maintain operational readiness and meet fire safety requirements. The scope of work may include the following:


  • Removal and disposal of existing fire hydrants.
  • Installation of new hydrants and associated piping connections.
  • Verification of water supply and pressure requirements.
  • Compliance with applicable safety, environmental, and fire protection standards.
  • Testing and commissioning to ensure proper functionality.

INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. INL is operated under a management and operating contract with the Department of Energy and as such, the Davis-Bacon Act applies for contracts in excess of $2,000 for the construction, alteration, or repair (including painting and decorating) of buildings or works at INL. Construction work at the laboratory Site covered under the Davis-Bacon Act is additionally subject to the INL Site Stabilization Agreement (SSA). These Site areas include all areas within the 890-square mile boundary, including the Material and Fuels Complex, Central Facilities Area, Advanced Test Reactor, Radioactive Waste Management Complex, and Specific Manufacturing Capability. The agreement is between signatory contractors and labor unions performing such work. Information regarding the INL Site Stabilization Agreement is available from the Site Labor Coordinator at Sign up to see this detail or at Sign up to see this detail. Construction work performed at Idaho Falls facilities is not subject to these agreements.


PROCESS


This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration.



SUBMITTAL REQUIREMENTS


Interested vendors should submit an Expression of Interest that includes the following:


  • Company name and point of contact
  • Description of relevant fire hydrant replacement capabilities and experience
  • NAICS codes and business size classification
  • Any existing DOE or federal contracting experience (if applicable)

Deadline for submission: March 27, 2026
Submit to: Sign up to see this detail


Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation.


PROPRIETARY INFORMATION


Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

NAICS: 334519
New
Federal
ATR Plant Protection System (PPS) Seismic Switch Replacement
Solicitation # INL-27-002
Battelle Energy Alliance, LLC, acting as the management and operating contractor for the Department of Energy owned Idaho National Laboratory, has issued an Expression of Interest under solicitation number INL-27-002. The objective is to conduct market research and acquisition planning to identify qualified suppliers capable of replacing obsolete Kinemetrics Model TS-3A seismic switches within the Advanced Test Reactor Plant Protection System. The required solution must provide three-axis ground motion sensing, dry contact output, and adjustable trip setpoints to ensure critical reactor protection functions and long-term system reliability. Potential suppliers must demonstrate the ability to meet stringent nuclear safety standards, including environmental and seismic qualifications per IEEE 323, IEEE 344, IEEE 603, and ANSI/ISA-67.04.01, while maintaining a Quality Assurance Program consistent with ASME NQA-1. Mandatory capabilities include the provision of comprehensive qualification reports, certificates of conformance, and long-term obsolescence management. Interested organizations must submit a concise PDF response, limited to approximately 10 pages, detailing their technical capabilities, business size, and relevant experience to Chase Egbert and Stacey Hill by April 23, 2027.
Other Measuring and Controlling Device Manufacturing

POSTED

4 days ago

DEADLINE

in 5 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS