Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Justification (J&A) opportunity from Florida was posted on May 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Hydrants

Awarded
B591114State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project is estimated at 16,690,000 dollars and is designed by Willis Engineers, who will serve as the owner's representative for the City of Belmont. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and the experience of proposed subcontractors. Bidders must comply with specific socioeconomic requirements, including the submission of MWBE Good Faith Efforts documentation, and the winning contractor is required to self-perform at least 50 percent of the total original contract amount. Key contractual obligations include providing performance and payment bonds, maintaining insurance with an A.M. Best rating of A-VII or better, and adhering to strict technical standards such as AWS and ASME welding qualifications and OSHA fall protection. Payment will be processed in equal monthly amounts using the EJCDC C-620 application for payment.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project involves various construction and supply scopes, including paving, electrical work, aggregate supply, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax by the deadline, with conflicting dates listed as October 28, 2026, and December 3, 2026. All submitted quotes must remain valid for 120 days from the bid due date. Qualified subcontractors and suppliers must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to 3 percent. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days

General Info

Documents

1
PDF, High priority: read this firstsole-source-justification
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Utilities
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Public Utilities
Office AddressN/A

Full Description

Show more
THIS IS NOT A COMPETITIVE BIDThe proposed contract action is for product or services for which the City of Hollywood intends to negotiate and award with only one source under the authority of the City of Hollywood City Code Section 38.40 (C) (3) Sole-source supplies and services. Any responses received as a result of this Notice of Intent shall be considered solely for the purpose of determining whether to conduct a competitive procurement in the future. Responses will not be considered as proposals, bids, or quotes.The Procurement Services Division has received a request to make the following sole-source procurement:Requesting Department/Office:  Public UtilitiesProduct and/or services to be purchased:  Fire HydrantsAnticipated Cost: $82,351.30Sole Source Justification:  Ferguson Waterworks is the sole source of fire hydrants and parts for products manufactured by American Flow Control in the state of Florida. 

More opportunities from Florida → Public Utilities

Same awarding agency

NAICS: 237110
New
SLED
Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261
Solicitation # IFB-438-26-JM
The City of Hollywood, Florida, is soliciting bids for the Water Treatment Plant Maintenance Package A (Project No. 25-4261 / IFB-438-26-JM), a construction project focused on the repair and replacement of critical facilities at the Water Treatment Plant located at 3441 Hollywood Boulevard. The scope of work comprises six primary elements: lime silo repairs, replacement of silo dust collectors, replacement of the sludge drum thickener and associated building repairs, replacement of valves for storage tanks 3 and 4, and the replacement of clearwell sample lines. The project budget is estimated to be under 4.5 million dollars, and the contract will be awarded to the lowest responsive and responsible bidder based on price, qualifications, financial capability, and past performance. The contract establishes a total duration of 645 calendar days, with substantial completion required by day 615. Failure to meet these timelines may result in liquidated damages of 2,500 dollars per day. The selected contractor must provide performance and payment bonds equal to the contract price and adhere to federal prevailing wage rates for Broward County. Technical requirements include compliance with OSHA standards for clearwell access, AWWA approved disinfections, and ADA accessibility. Bids must be submitted electronically via the OpenGov portal by December 3, 2026, at 3:00 PM. Payment will be processed through the City's standard application for payment form, subject to a 5 percent retainage.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237110
New
SLED
SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)
Solicitation # IFB-442-26-JM
The City of Hollywood, Florida, Department of Public Utilities is soliciting bids for Project No. 25-11070A, the SW-2 Bypass Pumping and Rehabilitation project. Located at South 8th Avenue and North Southlake Drive, this critical flood mitigation effort involves the structural rehabilitation and modernization of Stormwater Pump Station No. 2 to combat harsh coastal conditions. The project is budgeted under 3,000,000 dollars and is divided into three distinct phases: the establishment of a 20,000 GPM automated bypass pumping system with a seven-day operational demonstration period, the structural rehabilitation of the pump well including the casting of a new reinforced concrete top slab and CMU wall repairs, and final site restoration of pavement, sidewalks, and sod. The contract has a total duration of 240 calendar days from the Notice to Proceed, with substantial completion required within 210 days. Liquidated damages for delays are set at 500 dollars per day, and a 5 percent retainage will be held until final acceptance. Bidders must hold an active Florida General Contractor license and provide a bid guarantee of 5 percent of the bid amount. All work must comply with City of Hollywood, FDOT, and Florida Building Code standards, and laborers must be paid according to US Department of Labor prevailing wage rates for Broward County. Bids are due by November 25, 2026, via the OpenGov portal.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 238210
New
SLED
Lift Station E-08 Backup Electrical Power Generator (Project No. 25-8071A)
Solicitation # IFB-451-27-JM
The City of Hollywood, Florida, has issued solicitation IFB-451-27-JM for the construction of the Lift Station E-08 Backup Electrical Power Generator (Project No. 25-8071A). The scope of work encompasses comprehensive site, civil, structural, and electrical services, including the removal of the existing generator and fuel tank and the installation of a new emergency generator designed to withstand a 500-year flood event. Key project requirements include maintaining continuous sanitary service throughout construction and coordinating with agencies such as FEMA, AT&T, and FPL. The project must be completed by November 30, 2026, with all work adhering to strict technical standards from organizations such as ANSI, NEMA, and NECA. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of financial capability, past performance, licensing, and professional references. Bidders must submit their proposals through the OpenGov e-Procurement Portal by the specified deadline, including a bid guaranty of 5 percent and a commitment to provide performance and payment bonds equal to 100 percent of the total bid. Because the project involves federal grant funding via the FDEM, the contractor must comply with various federal regulations, including the Davis-Bacon Act for prevailing wages, the Clean Air Act, and the Federal Water Pollution Control Act for contracts exceeding specific thresholds. Additionally, the contractor is required to follow Generally Accepted Accounting Principles for quarterly invoicing and adhere to non-discrimination mandates under Title VI of the Civil Rights Act and the Americans with Disabilities Act.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Headwork Scrubber Rehabilitation (Project No. 23-9219)
Solicitation # IFB-439-26-JM
The City of Hollywood is soliciting bids for the Headwork Scrubber Rehabilitation project at the South Regional Wastewater Treatment Plant located at 1621 North 14th Avenue, Hollywood, Florida. The project aims to rehabilitate an odor control system designed in 1985 that has reached the end of its useful life. The scope of work includes replacing blowers, motor starters, and two scrubber vessels, while upgrading recirculation pumps, feed systems, ductwork, valves, and pH controls. Additionally, the contractor will perform minor electrical, instrumentation, and yard piping improvements. The project budget is under 8 million dollars, with a contract duration of 430 calendar days and a requirement to commence work within ten days of the contract date. Award will be granted to the lowest responsive and responsible bidder, with a local preference policy allowing Hollywood-based vendors to submit a second bid if their initial quote is within 5 percent of the lowest non-local bid. Bidders must provide a bid guaranty of 5 percent of the bid amount, and the successful awardee must provide performance and payment bonds equal to 100 percent of the total bid. The project is subject to prevailing wage requirements and federal procurement standards. Technical specifications cover various divisions including demolition, concrete, metal fabrications, and electrical systems, with strict inspection criteria including hydrostatic leak testing for scrubbers and visual weld inspections. Payments will be made via ACH within 30 days of a final accounting statement.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS