This Solicitation opportunity from Texas was posted on August 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Fire Sprinkler System Upgrades at Lufkin State Supported Living Center
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves upgrading fire sprinkler systems at the Lufkin State Supported Living Center in Texas, with a project budget of approximately $324,045. The scope includes designing, fabricating, installing, testing, and commissioning NFPA 13D and NFPA 13 sprinkler systems in designated buildings, ensuring full operational readiness and compliance with applicable codes, standards, and local authority requirements. The work must be completed in accordance with detailed project drawings and specifications, with the contractor responsible for all materials, labor, and documentation, including shop drawings, hydraulic calculations, and test reports. The project schedule anticipates a contract start date of December 5, 2025, following a series of mandatory site visits, webinars, and proposal deadlines, with the award expected by November 5, 2025. The procurement process emphasizes a best-value selection method, where proposals are evaluated based on 40% price, 30% relevant experience, 25% methodology, and 5% safety and quality programs. Respondents must attend mandatory site visits, submit a comprehensive proposal package—including a signed pricing form, HUB subcontracting plan if applicable, and certifications—by September 4, 2025. The contract incorporates state-specific regulations, including Texas Government and Health and Safety Codes, and requires compliance with cybersecurity, conflict of interest, and confidentiality provisions. It also mandates criminal background checks for personnel, adherence to HUB subcontracting goals, and detailed representations and certifications. Payment procedures follow the Uniform General Conditions, with invoicing and record retention governed accordingly. The contract’s terms ensure rigorous inspection, testing, and acceptance at the project site, with all work subject to approval by the Owner’s designated representatives and in strict accordance with NFPA, IBC, IFC, UL, and FM standards.
General Info
Place of Performance
TX, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
