Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on May 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Station No. 1 Wind Retrofit Project

Closed
26-009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work encompasses architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price. Bidders must submit proposals by September 21, 2026, and those exceeding 150,000 dollars are required to provide bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and Buy American requirements. Key deliverables include a facility operating plan and manufacturer-provided training information. Administrative requirements include submitting invoices via Wide Area Workflow and providing a detailed schedule of prices within 15 days of the award. Quality control is heavily emphasized, requiring the Contracting Officer's acceptance of a QC plan before any construction work, other than mobilization and surveying, may begin.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 14 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The City of Dania Beach is soliciting bids under ITB No. 26-009 for critical upgrades to Fire Station No. 1 to enhance its resilience against extreme weather events. The project involves comprehensive structural, electrical, and roofing improvements including the installation of a 250 kW emergency generator with a 187 mph-rated enclosure, new transfer switch and annunciator systems, underground conduits, grounding systems, and replacement of the roof and structural components to meet modern wind mitigation standards. Work also includes replacing hollow metal doors and frames, installing a 2-hour fire-rated gypsum board soffit, upgrading HVAC for improved ventilation, seismic bracing for mechanical and plumbing systems, and full restoration of all disturbed areas. The scope is defined by precise compliance with the Florida Building Code, OSHA 29 CFR Part 1926, and other local and manufacturer specifications, with no waivers permitted and the most stringent standard governing in case of conflict. The project requires strict adherence to a defined schedule with performance milestones tied to phases of construction, engineering, and inspections, with completion expected within a 27-month timeframe beginning upon contract execution. All work must be performed with minimal disruption to ongoing emergency operations, and contractor access must be carefully managed to ensure station operational continuity. Proposals must be submitted electronically via the OpenGov Procurement portal by the stated deadline, accompanied by mandatory certifications including non-collusion, debarment clearance, public entity crime statements, and compliance with Equal Employment Opportunity and Davis-Bacon wage requirements. Invoices are to be submitted to the City’s Finance Department via email or mail, with no use of federal invoicing systems. Inspection and acceptance occur on-site, with the Contractor responsible for all testing, corrections, and associated costs, while the City’s Engineer holds sole authority to approve work. The 10% contingency line item indicates budget flexibility, but no total estimated contract value is disclosed. The City retains the right to inspect materials at origin and finished work at the site, with acceptance contingent on full compliance with all specifications and documentation submittals including as-built records.

General Info

Dania Beach Fire Station No. 1 retrofit adds generator, roof, structural upgrades for resilience.

Agency

Florida → Public ServicesView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(11)

21-43131 Fire Station No. 1 Cost Estimate

PDFcost-estimate

2026.05.12 Combined Technical Specifications for City of Dania Beach Project

PDFspecifications

4337-285-R Period of Performance Extension Request

PDFperiod-of-performance-extension-request

4337-285-R Federally-Funded Subaward and Grant Agreement

PDFcontract-document

Performance Bond for City Bid No. 24-0XX

PDF6 pagesperformance-bond

Performance Bond for City of Dania Beach Construction Contract

PDF6 pagesperformance-bond

Fire Station No. 1 Wind Mitigation Engineering Plans

PDFspecifications

Dania Beach Construction Agreement Draft

DOCX53 pagescontract-document

City of Dania Beach ITB 26-009 Fire Station No. 1 Wind Retrofit Project

PDFitb

Payment Bond for City of Dania Beach Construction Contract

PDF5 pagespayment-bond

Payment Bond for City of Dania Beach Restroom Renovation Project

PDF5 pagespayment-bond

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Services
Contacts2 people available
OfficeDania Beach, FL, 33004, USA
Organization / Agency
Florida → Public Services
View Agency Profile
Office AddressDania Beach, FL, 33004, USA
Contacts
Joel RodriguezProject Manager
Sasha RamosProcurement Manager

Interested Companies (30)

Show more
Dbtech
Miami, FL
NEFI Services, Inc. (Surety & Commercial Insurance)
St. Augustine, FL
Zabatt Power Systems
Jacksonville, FL

See All 30 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Fire Station No. 1 plays a critical role in emergency response and public safety for the City of Dania Beach. However, its infrastructure requires upgrades to ensure operational continuity during extreme weather events. The addition of a dedicated generator, along with roof and structural improvements, will enhance the facility's resilience and support first responders. Challenges include maintaining access to the station during construction and integrating systems without disrupting emergency operations.

More opportunities from Florida → Public Services

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS