Fire suppression system installation

Closed
12639526Q0210Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
Solicitation 70CMSW25R00000011 is a firm-fixed-price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for design-build services to support the Immigration and Customs Enforcement (ICE) Office of Firearms and Tactical Programs at Fort Benning, Georgia. The project, valued between 4.0 million and 4.5 million dollars, focuses on life, safety, and operational improvements. The scope of work includes the installation of two aluminum awnings at the shipping and receiving dock and Fiske Range Lane 2, turf replacement at Fiske Range, the demolition of Building 2294, gutter and drainage improvements for Building 234, commercial HVAC services and replacements, and general facility improvements for Building 301 and the DAGr Team facility. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. The contract is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave for workers. Performance and payment bonds are required per FAR 52.228-15. Proposals must be submitted in two volumes: a technical and safety volume and a pricing volume using the provided template. All payment requests must be processed electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The project objective is to replace corroded and obsolete equipment with high-quality, coastal weather-resistant, and durable systems that exceed commercial standards. The scope includes removing existing RTUs, replacing necessary piping, electrical, and ducting, and installing new SCADA software and two chemical feed pumps in compliance with Texas Commission of Environmental Quality standards. The estimated magnitude of the project is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. Key requirements include the submission of a Quality Control Plan, a safety plan, and the designation of a Project Manager with at least five years of relevant federal contracting experience. The contractor must also provide a one-year warranty for installation and craftsmanship and ensure all personnel pass required background checks for site access. Compliance with the Davis-Bacon Act and associated executive orders regarding wages and sick leave is mandatory. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 13 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation is seeking fixed-price lump sum bids for a subcontracting opportunity to replace the HVAC system at Building E8 Welding within the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes the complete change-out of the existing motor, installation of wiring, conduit, disconnects, breakers, fuses, and starters, and the subsequent validation of voltage, phase, and grounding. Deliverables include startup and testing documentation, onsite training for maintenance personnel, and the provision of manufacturer O&M manuals. All work must adhere to OSHA requirements, federal, state, and local codes, and site safety procedures. Bids must be submitted via email to nelson.dar@jobcorps.org and patricia.willover@mtctrains.com by September 19, 2026, at 3:00 PM MST. To be considered for award based on overall best value, offerors must complete a physical site visit, provide a detailed bid breakout on company letterhead, and submit a bid bond guarantee. The project is a small business set-aside under NAICS 238220 and requires compliance with Davis-Bacon prevailing wage determinations for Davis County. Awardees must provide a UEI number, submit a Schedule of Values for invoicing via AIA G702/G703 forms, and provide original payment and performance bonds from a surety with at least an A- rating within five business days of an Intent to Award letter. Performance dates will be established upon the signing of a Notice to Proceed.
Management & Training Corporation

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. The project is structured in five phases: preparation and environmental safety, demolition and removal, installation of an OEM-specified compressor and related components, system testing and commissioning, and final closeout. The contractor must ensure full restoration of cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within 30 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedules. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, along with performance and payment bonds from an A-rated surety company. Submission requirements include a signed bid sheet, a detailed bid breakout, and verification of a physical site visit. Contractors must comply with Davis-Bacon Act wage determinations for Washoe County and provide self-certification of their business size and socioeconomic category per FAR 52.219-8. Final payment is contingent upon the submission of a Notice of Final Completion, certified payroll reports, and two sets of operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking bids for a subcontracting opportunity to replace a failing air-cooled chiller at the North Texas Job Corps Center, specifically within Building 214/215 in McKinney, Texas. The scope of work includes the demolition and disposal of the existing chiller, the installation and startup of a new air-cooled chiller, and the integration of building automation controls using a JACE 9000 central integration point. Additionally, the contractor is responsible for installing three-way control valves at four air handling units, replacing VFDs, performing AHU cleaning and inspection, and ensuring all wiring is plenum-rated. Bids must be submitted by September 18, 2026, and quotes must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, a Certificate of Liability Insurance naming Serrato Corporation as the holder, and Form 1413 for Davis-Bacon Act certified payroll compliance for work exceeding 2,000 dollars. Insurance requirements include a minimum of 500,000 dollars for Employers Liability and 1,000,000 dollars per occurrence for Commercial General Liability. The project is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Primary points of contact for this solicitation are Stacy Smith and Roy Henderson.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 10 hours ago

DEADLINE

in 10 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
Adams & Associates, Inc., operating for the U.S. Department of Labor, is soliciting a single lump sum contract to replace HVAC systems at the ABL Dormitory within the Atterbury Job Corps Center in Indiana. The project involves replacing existing R-22 Bryant gas-fired furnaces and condensing units with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The scope includes the installation of compatible coils and the reuse of existing electrical disconnects, ductwork, and thermostat wiring. All recovered refrigerant must be labeled and left on-site. Eligible bidders must be registered in SAM.gov with a valid Unique Entity ID and hold a valid Indiana Contractor's License. A mandatory site visit is scheduled for September 23, 2026, with final proposals due by October 5, 2026. Award decisions will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The contractor must provide a sequenced construction schedule within 10 days of the Notice to Proceed and guarantee all workmanship for one year. Payment terms are Net 30, contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens. Compliance with EPA, OSHA, and Davis-Bacon Act wage determinations is required.
Adams & Associates, Inc.

POSTED

about 10 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

A fire suppression system installation is required at Building 6418 on Moore Air Base in Edinburg, Texas, following a recent fire that exposed the absence of any fire protection in the structure, which was built in the early 1980s. The project is a turnkey effort requiring the full design, installation, permitting, and commissioning of a new automatic sprinkler system including underground and overhead piping, canopy protection, flex drops for sprinkler heads centered in ceiling tiles, and a riser room with an above-ground backflow preventer, PIV, tap, and testing certification. All work must comply with NFPA standards, State of Texas environmental regulations, and local ordinances, using only new and unused materials. The system must be designed to allow for future integration with a fire alarm panel, though no active monitoring is required at this time. The solicitation is a combined synopsis and request for quotations issued under FAR Part 12 as a commercial items acquisition, with a total small business set-aside under NAICS code 238220 and a size standard of $19 million. Offers must be submitted electronically by 12:00 p.m. CT on August 6, 2026, to james.g.roloff@usda.gov with the solicitation number included in the subject line. A site visit is scheduled for July 23, 2026, and attendees must register in advance and present a valid driver's license or state ID for facility access. Award will be made using the Lowest Price Technically Acceptable (LPTA) method under FAR 12.203, where only the lowest-priced offer will be evaluated for technical acceptability unless it fails to meet requirements, in which case the process continues sequentially down the price list. The quote must include a complete breakdown of all components making up the lump-sum price, and the government will conduct a price realism analysis to ensure the submission is realistic, reflects a clear understanding of requirements, and is consistent with the technical proposal. Submissions deemed unreasonably low or high may be rejected for incorporating excessive risk. Technical acceptability is rated as acceptable or unacceptable based on the offeror’s demonstrated ability to meet all requirements, including relevant experience with fire sprinkler systems of similar scope. Past performance will be evaluated as acceptable, neutral, or unacceptable, with no history resulting in a neutral rating. All contractors must be registered in SAM, provide payment and performance bonds under FAR 52.

General Info

Retrofit wet fire suppression system for Building 6418 at Moore Air Base, Texas; small business set-aside, due August 6, 2026.

Agency

Department Of Agriculture → Mrpbs Minneapolis MnView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Edinburg, TX, 78541, USA

Set-Aside

SBA

Documents

(13)

Amendment 0003 to Solicitation 1263952600210

PDF1 pageamendment

Solicitation 12639526Q0210 Amendment 0005

PDF1 pageamendment

Building 6418 - Birds Eye View Map

PDFspecifications

RFIs and Responses for Fire Alarm and Sprinkler System Project

DOCX3 pagesq-and-a

Amendment 0002 to Solicitation 1263952600210

PDF1 pageamendment

Solicitation 12639526Q0210 - RFIs and Responses for Fire Suppression System Installation

DOCX1 pageq-and-a

Federal Construction Wage Rates for Hidalgo County TX 2026

TXT4 pageswage-determination

6418 Installation Fire Suppression System - Solicitation Walkthrough Sign-In Sheet

PDFsign-in-sheet

Solicitation 12639526Q0210 Request for Quotations for Fire Suppression System

DOCX15 pagesrfq

12639526Q0210 Amendment 0004

PDF3 pagesamendment

Amendment 0001 to Solicitation 1263952600210

PDF1 pageamendment

SOW Installation of Wet Fire Suppression System USDA Moore Air Base June 2026

DOCX2 pagessow

MFFRF Building 6418 Drawings June 1984

PDFdrawings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

12 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Amendment 8

Contract was updated

Amendment 9

Contract was updated

Amendment 10

Contract was updated

Amendment 11

Contract was updated

Amendment 12

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Mrpbs Minneapolis Mn
Contacts1 person available
OfficeMINNEAPOLIS, MN, 55401, USA
Organization / Agency
Department Of Agriculture → Mrpbs Minneapolis Mn
View Agency Profile
Office AddressMINNEAPOLIS, MN, 55401, USA
Contacts

Full Description

Show more

Due to a recent fire in building 6418 at Moore Air Base, Texas, a wet fire suppression system is needed. Building 6418 was constructed in the early 1980s with no fire suppression initially.  Contractor shall provide design/as-built drawings submittals and installation of a new retrofitted system. The system shall be a turnkey project encompassing everything needed to have a fully functioning fire suppression system.


Solicitation documents are posted below.


NOTE: For those wishing to attend the site visit, please send names of attendees to james.g.roloff@usda,gov. A valid drivers license or state ID is required.


Amendment 1 is posted below.


RFI: Does Building 6418 currently have an existing fire alarm panel/system that the sprinkler monitoring would tie into? If so, could you please provide the panel/system type, make/model, or any available details needed for a sprinkler monitoring quote? The fire panels are old and obsolete. They will be replaced at another time, but the new sprinkler system must be able to connect to a fire panel in the future. No monitoring is needed.


The sign-in sheet for the site visit is posted below.


Building drawings posted below.


RFIs and responses posted below.


Amendment 2 is posted below. It extends the closing date.


Amendment 3 is posted below. It extends the closing date.


Additional RFIs and responses posted below.


Amendment 4 is posted below.


There's a change to the response to RFI 6 posted here on August 17. The correct answer is as follows:


6) Please confirm if a CVPC/PEX fire suppression would be sufficient or the USDA prefers schedule 10 or schedule 40 Victaulic black iron piping? Or provide a specification with minimum standards for Moore Airfield that must be met regarding fire suppression piping? It is typical for local building codes and state codes to be of a lesser standard than what a federal installation requires. The statement of work indicates in accordance state and local codes and standards only opening the door for a CVPC system to be priced.


The USDA prefers the use of Schedule 40 Victaulic black iron piping.


An amendment to postpone this solicitation indefinitely is posed below.

More opportunities from Department Of Agriculture → Mrpbs Minneapolis Mn

Same awarding agency

NAICS: 238990
New
Federal
Installation of Livestock Holding Pens and Chutes
Solicitation # 12639526Q0284
The Department of Agriculture is seeking a firm-fixed-price construction purchase order for design-build services at the National Detector Dog Training Center in Newnan, Georgia. The project focuses on expanding the New World Screwworm training program by installing essential livestock infrastructure to acclimate detector dogs to real-world field conditions. The scope of work includes the design and construction of 1,550 linear feet of livestock-grade fencing, two holding pens measuring 80 by 190 feet and 60 by 220 feet, a 300 linear foot chute system, and a simulated chute-training environment. Additionally, the contractor must provide shelters, flooring, drainage, and necessary water and electrical utilities, ensuring all work complies with USDA animal-welfare and safety standards. This acquisition is a total small business set-aside under NAICS code 238990, with an estimated project magnitude between 100,000 and 250,000 dollars. The government will evaluate quotes based on a pass/fail basis for the delivery schedule and a subjective assessment of past performance. Work must commence immediately upon receipt of the notice to proceed and be completed by October 30, 2026. The contract requires performance and payment bonds and adheres to Davis-Bacon Act wage determinations for Coweta County. Payment will be handled via electronic funds transfer, with provisions for monthly progress payments and the ability to invoice for materials stored onsite without the application of retainage.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS