Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Florida was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Firestop and Penetration Fireproofing

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238390
New
Federal
Supply & Installation of guards booths in US Mission Residences in Paris, France
Solicitation # 19FR6326Q0075
The U.S. Embassy in Paris is soliciting quotes for the supply, delivery, and installation of guard booths at four government residences in Paris and its vicinity. The project involves three primary phases: the removal and off-site disposal of existing booths, site preparation including concrete slab and electrical provisions, and the installation of new booths at the Neuilly Complex, Boulogne Complex, and Weber Residence, as well as the relocation of an existing booth from the Weber residence to the CMR Building. New booths must meet specific minimum requirements, including glazed aluminum doors, sliding-pane windows, interior lighting, power sockets, and electric heating. All work must comply with U.S. Army Corps of Engineers EM 385-1-1, OSHA 29 CFR 1910, and French occupational safety laws, with the most stringent standard applying. This is a firm-fixed-price contract with an estimated value between 25,000 and 100,000. Award will be granted to the lowest priced, technically acceptable, and responsible offeror. The mandatory performance period requires work to begin within 10 calendar days of award and be completed within 120 calendar days. Offerors must be registered in the System for Award Management and provide proof of registration with their electronic submission. Key requirements include the provision of an English-speaking on-site supervisor, specific general liability insurance coverage, and payment protection amounting to 50 percent of the contract price. Final acceptance is contingent upon a joint inspection with the Contracting Officer's Representative to ensure all work meets approved specifications and trade practices.
US Embassy Paris

POSTED

1 day ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves the installation and repair of firestop systems designed to ensure the integrity of fire-rated walls, floors, and penetrations, thereby maintaining compliance with life safety codes. This work is critical to sustaining fire-resistant barriers that protect buildings and occupants by preventing the spread of fire and smoke through openings and joints in structural assemblies. Issued by the Facilities Management agency in Florida, the subcontract falls under the NAICS code 238390, which pertains to fireproofing and insulation contractors. The solicitation was posted on June 17, 2026, with a submission deadline of July 22, 2026. While specific location details and point-of-contact information are not provided, the contract emphasizes adherence to stringent safety and building standards essential for fire protection in construction and maintenance projects.

General Info

Install and repair firestop systems to maintain fire-rated barriers, ensuring code compliance.

Agency

Florida → Facilities ManagementView Agency

NAICS

238390 - Other Building Finishing ContractorsView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP 27-213 MB.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Annual Fire Protection Repairs, Maintenance, and New Installations JOC (Job Order Contract)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Facilities Management
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Facilities Management
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation and repair of firestop systems in walls, floors, and penetrations to maintain fire-rated assemblies and comply with life safety codes.

More opportunities from Florida → Facilities Management

Same awarding agency

NAICS: 238290
SLED
Ocean Center Parking Garage Elevator Modernization
Solicitation # 26-B-123JS
Invitation for Bid 26-B-123JS is a solicitation by the County of Volusia for the modernization of five hydraulic passenger elevators and a pedestrian bridge at the Ocean Center Parking Garage in Daytona Beach, Florida. With an estimated construction cost of 1,500,000 dollars, the project requires the contractor to furnish all labor, materials, and services necessary to bring the equipment into compliance with current code requirements. The contract will be awarded to the single lowest responsive and responsible bidder based on factors including total cost, technical experience, resource capacity, and past performance. The project timeline specifies substantial completion within 330 days and final completion within 365 days, including a 12-month warranty period following final acceptance. Operational coordination is critical, as all work must be scheduled around the 2026-2027 Ocean Center event calendar and confirmed with the County Project Manager to avoid blackout dates. Technical execution must adhere to the specifications provided by Lerch Bates Inc., starting with the Level 5 pedestrian bridge elevator and proceeding level by level. The contractor is responsible for maintaining strict site security, adhering to insurance requirements, and managing all subcontractors through the required Prime-Subcontractor forms. Final acceptance is contingent upon a County inspection and the successful remediation of any punch list items within 20 days.
Other Building Equipment Contractors

POSTED

about 1 month ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS