Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Flood Resilience Engineering & Modeling

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Flood Resilience Engineering and Modeling supports prime contractors on flood resilience projects for the Town of Westport, Massachusetts. The selected provider will be responsible for performing technical analysis and hydrological and hydraulic modeling using HEC-RAS or Mike 21 to evaluate water flow, flood levels, and the resulting impact on local infrastructure. Key deliverables include comprehensive technical analysis reports, detailed flood maps, and professional engineering recommendations. The project requires the performing party to hold a Professional Engineer license and operate under NAICS code 541330. The performance of work is centered in Westport, Massachusetts. Interested parties must submit their responses by the deadline of October 29, 2026.

General Info

Flood resilience engineering and modeling subcontract for Westport, MA, due October 29, 2026.

Place of Performance

Main Road Westport, MA, 02790, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1731-WSPT-WSPT-134329.

The full solicitation package (19 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Old County Road & East Branch Flood Resilience Study

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → Town of Westport
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical analysis and modeling for prime contractors on Town of Westport, MA flood resilience projects. Conducts hydrological and hydraulic (H&H) modeling using HEC-RAS or Mike 21 to analyze water flow, flood levels, and infrastructure impact. Requires a Professional Engineer (PE) license. Delivers technical analysis reports, flood maps, and engineering recommendations.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Massachusetts → Town of Westport

Same awarding agency

NAICS: 114112
SLED
Supply and Delivery of Contaminated Quahogs
Solicitation # BD-27-1731-WSPT-WSPT-134381
The Town of Westport is soliciting sealed bids for the supply and delivery of up to 2,000 bushels of quahogs contaminated specifically by fecal coliform. The scope of work includes all costs associated with harvesting, packaging, transportation, and delivery to a location designated by the Town. To be eligible, quahogs must be sourced from Massachusetts Division of Marine Fisheries certified harvest areas. Technical specifications require each bushel to weigh 80 pounds, packed as two 40-pound boxes, with a composition of 20 percent Cherry Stone and 5 percent Large or Chowder quahogs. The contract will be awarded to the lowest responsive and responsible bidder based on the price per 80-pound bushel, in accordance with M.G.L. c. 30B. Bids must be submitted in sealed envelopes marked 2026 CONTAMINATED QUAHOGS – BID and received at the Town Administrator's Office by November 2, 2026, at 2:00 PM. Required documentation includes a signed bid form, a Certificate of Non-Collusion, a Tax Compliance Certification, and identification of the proposed DMF-authorized harvest area. The resulting agreement will expire on December 31, 2026, and requires the contractor to maintain Commercial General Liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, as well as 1 million dollars in Auto Liability.
Shellfish Fishing

POSTED

14 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS