Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Flow Isolation Bypass Piping (Alternate Bid Item)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure solicitation issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional requirements encompass the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises, with a strong emphasis on M/W/DBE participation. James W. Fowler Co. offers support to these subcontractors in securing bonding, insurance, and necessary materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. Quality control testing is a specified requirement for the project.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The contract pertains to the installation of temporary bypass piping systems using either HDPE or steel materials to temporarily redirect flow during utility or drainage operations, ensuring continuous service while work is performed on existing infrastructure. This is designated as an alternate bid item under subcontract, with the North American Industry Classification System code 237110 indicating it falls under water and sewage line and related structures construction. The work is specifically tied to projects managed by the Texas Department of Transportation, with performance expected in Tarrant County. Though the solicitation and response deadlines are listed as July 1, 2026, this appears to be a placeholder or administrative date. The contractual scope focuses on temporary flow isolation solutions critical to minimizing disruption during infrastructure maintenance or upgrades, and bidders must be prepared to meet technical specifications for material selection, installation methods, and safety compliance in an active transportation environment. All project details and plans are accessible via the provided Texas DOT public portal link.

General Info

Install temporary bypass piping with HDPE or steel for Texas DOT projects in Tarrant County.

Agency

Texas Department of TransportationView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Tarrant, TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 0902-90-129.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tarrant County — CSJ 0902-90-129 — July 2026 Letting — State-Let Construction

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of temporary bypass piping systems using HDPE or steel to isolate flow during utility or drainage work.

More opportunities from Texas Department of Transportation

Same awarding agency