Flow Meter Installation and Calibration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the supply, installation, and calibration of two in-line flow meters to be placed at the inlet and outlet of the Grossmont Reservoir, enabling precise measurement and monitoring of water demand. This project is critical for enhancing the accuracy of water usage data, supporting operational efficiency and regulatory compliance for the Helix Water District. The flow meters must be installed to exact technical specifications and calibrated to ensure reliable, long-term performance under varying flow conditions. The work is classified under NAICS code 334510, indicating it pertains to the manufacturing of measuring and controlling devices, and is structured as a subcontract under the Helix Water District in California. The contract was posted on July 1, 2026, with no set-aside designation specified. The place of performance is tied to the Grossmont Reservoir location, though specifics such as city or zip code are not provided. All work must be performed in alignment with the district’s operational standards and technical requirements, with the ultimate goal of improving water resource management through real-time, accurate flow monitoring.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
This scope was carved out of CIP25003.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
GROSSMONT RESERVOIR OUTLET FLOW METER REPLACEMENT PROJECT (CIP25003)
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
