Follins Pond Green Stormwater Infrastructure
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Follins Pond Green Stormwater Infrastructure project, managed by the Town of Yarmouth Department of Public Works in Massachusetts, involves the installation of critical drainage systems beneath Gun Rock Road and Follins Pond Road. The scope of work includes placing 28 leaching infiltration chambers, two catch basins, and one water quality unit, all of which must be interconnected. Additionally, the contractor will construct three infiltration trenches utilizing 12-inch perforated HDPE pipes backfilled with crushed stone. The project further requires the construction of new manholes and catch basins, the connection of trenches to these structures, and the replacement of existing grates. This solicitation, identified by number BD-27-1355-TYARM-YADPW-131632, was posted on July 29, 2026, with a response deadline of August 19, 2026. All work will be performed in West Yarmouth, MA, under NAICS code 237310.
General Info
Agency
NAICS
Place of Performance
Town Brook Road West Yarmouth, MA, 02673, USASet-Aside
Documents
(16)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Massachusetts → TYARM - DEPARTMENT OF PUBLIC WORKS
Same awarding agency
