Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Forestry and Parks - Invitation to Bid - Miquelon Lake Provincial Park, Wastewater and Distribution System Refurbishment

Active
AB-2026-06416International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract, issued by Forestry and Parks under solicitation number AB-2026-06416, involves the wastewater and distribution system refurbishment at Miquelon Lake Provincial Park in Alberta. The scope of work is divided into several schedules, including VFD conversion for Lift Station 1, the full replacement of Lift Stations 2 and 3 using Gorman-Rupp packages, and the decommissioning of an abandoned park well. Additional requirements include the installation of a 25mm watermain connection for campground looping, shop lift station upgrades with new grate tops and bollards, and the removal of redundant piping and wiring at the Water Treatment Plant. Two provisional schedules are also included for the decommissioning of an abandoned house well and panel cleanup. The project is located at Township 49, Range 20, West of the 4th Meridian. A critical condition for the contract award is the provision of safety certification, and the successful contractor must maintain a valid COR, SECOR, COREL, or TLC certification throughout the duration of the work. The response deadline for this solicitation is October 15, 2026.

General Info

Forestry and Parks wastewater and distribution system refurbishment at Miquelon Lake Provincial Park.

Agency

Forestry and ParksView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyForestry and Parks
Contacts1 person available
OfficeN/A
Organization / Agency
Forestry and Parks
View Agency Profile
Office AddressN/A
Contacts
Michael B. EdwardsInquiries Contact

Full Description

Show more
Work of this Contract comprises the following: .1 Miquelon Lake Provincial Park, various projects including: .1 Schedule 1 - Lift Station #1 - Main Lift Station VFD Conversion .1 Installation of electrical equipment for VFD conversion. .2 Schedule 2 - Lift Station #2 - Boat Launch Lift Station Replacement .1 Removal and disposal of the existing lift station equipment and pumps. .2 CCTV Inspection of the existing forcemain connection. .3 Inspection of the existing wet well. .4 Installation of a new Gorman-Rupp Lift Station Package. .3 Schedule 3 - Lift Station #3 - Campground Loop "C" Lift Station Replacement .1 Removal and disposal of the existing lift station equipment and pumps. .2 CCTV Inspection of the existing forcemain connection. .3 Inspection of the existing wet well. .4 Installation of a new Gorman-Rupp Lift Station Package. .4 Schedule 4 - Abandoned Park Well Decommissioning .1 Demolition and Disposal of existing well head, building and foundation and equipment. .2 Pour well plug. .3 Site restoration. .5 Schedule 5 – Watermain Addition .1 Installation of a 25mm waterline connection to improve looping capacity in the campground area. .6 Schedule 6 – Shop Lift Station .1 Disposal of existing grate top. .2 Supply and installation of a new grate top. .3 Supply and installation of protective bollards. .7 Schedule 7 - Water Treatment Plant Yard Piping Removals .1 Hydrovac services to expose existing piping. .2 Removal of abandoned redundant lines. .3 Site restoration. .8 (PROVISIONAL) Schedule 8 – Water Treatment Plant Panel Cleanup .1 Removal and disposal of redundant wiring. .9 (PROVISIONAL) Schedule 9 – Abandoned House Well Decommissioning .1 Demolition and Disposal of existing well head. .2 Pour well plug. Work of this Contract location is the following: .1 Municipal Address: Miquelon Lake Provincial Park, Alberta .2 Legal Description: Township 49, Range 20, West of the 4th Meridian .3 Coordinates: 53°14'28.7"N 112°53'40.9"W
.1 Safety certification, as specified in Section 00 21 13 - Instructions to Bidders, is a condition of contract award. .2 The Contractor shall maintain a valid standard COR, SECOR, COREL, or TLC for the duration of the Work of this Contract.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 5 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Forestry and Parks

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS