This Solicitation opportunity from Forestry and Parks was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Forestry and Parks - Request for Proposal - ENGINEERING AND CONSTRUCTION ADMINISTRATION CONSULTANT SERVICES Potable Water and Wastewater Infrastructure Assessment and Refurbishment

Awarded
AB-2026-05555International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 10 hours ago

DEADLINE

in 19 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the rehabilitation of reactor mixers and aerators and the installation of new slide gates. Electrical and instrumentation work includes the replacement of motor control center components and general system improvements. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, lead abatement, metals fabrication, painting, coatings, trucking, hauling, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid for reimbursement. Quotes for services and supplies are due by November 17, 2026, at 2:00 PM PT, ahead of the final bid date on November 18, 2026. Any exceptions to the standard purchase order and subcontract forms must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 10 hours ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The contract entails comprehensive engineering and construction administration services for the assessment, planning, design, and implementation of potable water and wastewater infrastructure improvements at Beauvais Lake Provincial Park in Alberta. The proponent will manage all phases from initial evaluation through to project close-out, ensuring alignment with technical, financial, environmental, operational, and stakeholder needs. For wastewater, the focus is on consolidating existing systems into a regionalized approach wherever feasible, with clear justification required for any site-specific alternatives, including isolated facilities like the park office. The Consultant is expected to rely on prior assessments, records, and targeted site evaluations rather than conducting an extensive options analysis, streamlining the scope to practical and justifiable solutions. For potable water, the assessment will identify deficiencies and advance designs for authorized upgrades, with no intention to replace the recently installed distribution system unless necessary for connections, protection, or localized modifications. The project is scheduled to commence in September 2026 and conclude by October 2028, with proposals due by September 3, 2026, under solicitation number AB-2026-05555. The work is being procured by Alberta Forestry and Parks, with Aaron Faber serving as the primary point of contact. The place of performance is at NW29-5-1-W5M, and the services require integration of regulatory approvals, contractor procurement support, construction administration, and commissioning. The scope emphasizes efficiency, feasibility, and lifecycle cost considerations, particularly in wastewater infrastructure, while ensuring the potable water system enhancements support current operational requirements without unnecessary redundancy.

General Info

Engineering and construction services for potable water and wastewater upgrades at Beauvais Lake Provincial Park, Alberta, 2026–2028.

Contract Value

$369,216.4

Place of Performance

AB, CAN

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyForestry and Parks
Contacts1 person available
OfficeN/A
Organization / AgencyForestry and Parks
Office AddressN/A
Contacts
Aaron FaberSenior Project Manager

Full Description

Show more
PROJECT DESCRIPTION .1 The successful Proponent will be responsible for assessment, planning, evaluation and recommendations, reporting, design, regulatory approval securement, contractor procurement support, construction administration, commissioning, and project close-out services for potable water and wastewater infrastructure improvements at Beauvais Lake Provincial Park. The work shall consider technical, financial, environmental, operational, and stakeholder requirements. .2 For the wastewater component, Alberta Forestry and Parks prefers to consolidate existing systems and provide regionalized collection, treatment, and disposal infrastructure where technically, environmentally, operationally, and financially feasible. The Consultant shall determine where consolidation is practical and provide clear technical, operational, and lifecycle-cost justification for any separate site-specific systems recommended, including any separate system proposed for an isolated facility such as the park office. .3 The wastewater component is not intended to include an extensive or openended options analysis. The Consultant shall use the previous infrastructure assessment, available records, operational knowledge, targeted field investigations and site-evaluation results to evaluate only the practical servicing configurations and treatment-area alternatives reasonably required to confirm the recommended replacement approach. .4 For the potable water component, the Consultant shall assess the existing source and treatment systems, confirm current deficiencies and required upgrades, and advance the design of authorized improvements. The recently replaced potable water distribution system is not intended to be reassessed or replaced except where coordination, protection, connection, or localized modification is required. ANTICIPATED PROJECT SCHEDULE .1 The project schedule calls for commencement of Contract by September 2026 and completion of Services by October 2028. Municipal address is NW29-5-1-W5M

More opportunities from Forestry and Parks

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS