Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Forestry and Parks - Request for Quotes - PIGEON LAKE PP FIREWOOD STORAGE SHED REPLACEMENT

Active
AB-2026-07074International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation, issued by Forestry and Parks under number AB-2026-07074, outlines the requirements for the replacement of a firewood storage shed at Pigeon Lake PP in Alberta. The project involves the mobilization of equipment, site preparation, and the removal and off-site disposal of an existing 20 by 19 by 9 foot woodshed. The contractor is responsible for constructing a new 26 by 16 foot lean-to storage shed featuring a compacted road crush pad, pressure-treated sleepers, and a combination of pressure-treated plywood and OSB exterior finishing wrapped in a water-resistive barrier. The new structure will include 2 by 6 wall framing, 2 by 8 roof framing with Metro Brown metal roofing, and reinforced interior walls to withstand firewood deliveries. Key installations include two sets of 8-foot high lockable double-swing chain link gates and three solar-powered motion-activated lights. The scope concludes with a full site cleanup and the removal of all construction debris to an off-site location. Responses to this request for quotes are due by November 3, 2026.

General Info

Replace firewood shed at Pigeon Lake PP, Alberta. Quotes due November 3, 2026.

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyForestry and Parks
Contacts1 person available
OfficeN/A
Organization / AgencyForestry and Parks
Office AddressN/A
Contacts
Kevin WenzelContract & Procurement Specialist

Full Description

Show more
SCOPE OF WORK: • Mobilization and Demobilization of all equipment. • Complete First Call and secondary line locates as needed. • Erect signage for public acknowledgement of construction in progress. • Remove existing 20’L X 19’D X 9’T woodshed and dispose of off site. • Remove vegetation and prep site for new 26’ L X 16’ D woodshed. • Supply and haul onto site all materials for construction of a new 26’ L X 16’ D lean-to firewood storage shed (14’T walls at front of shed and 10’ T walls at rear of shed) with a compacted 3/4-inch road crush pad inside woodshed. • Wall framing for the new shed is to be 2” X 6” dimensional lumber and LVL headers where needed. Wall framing to be placed at 24” o/c and on 6” X 6” pressure treated sleepers placed flush with grade under all four walls. • Exterior wall finishing of the shed to be 1/2” pressure treated plywood on the bottom course and 7/16” OSB from 4’ above grade to top of walls. • Exterior of the shed is to be wrapped with a Water Resistive Barrier (WRB’s) such as Tyvek® HomeWrap® or equivalent product with approval of the project manager. • Front openings to be framed in to provide shed with two 8’ height openings with 8” X 8” pressure treated centre support post for header. • Interior rear and side walls to have six courses of 2” X 6” dimension lumber added to prevent damage when receiving firewood deliveries. • Lockable gates to be welded double swing (2 Sets) 8’ T - 1 5/8” frame c/w 9 ga chain link mesh to fit two approximate 12’ wide openings. • Roof framing to be 2” X 8” dimensional lumber 24” o/c and 2” X 8” rough fascia with 4” overhangs on all sides and 1” X 4” dimensional lumber strapping placed perpendicularly at roughly 30” o/c. • Roofing materials to be 26ga metal roofing Westform Metals WF-12-36® and all associated flashings and materials, (Metro Brown in color) or equivalent product with approval of the project manager. No soffit, fascia, eavestroughs or downspouts are needed. • 3 solar powered motion activated lights. 2 lights to be mounted on the interior side walls with light directed to the back wall and 1 light to be mounted on the exterior in the middle of the front wall above the chain link gates. • Clean up of site and removal of all debris created during removal of existing firewood shed and construction of new firewood shed. Clean up of site is required and debris is to be disposed of offsite, and not in parks refuse containers.

Similar Contracts

Same NAICS industry code

More opportunities from Forestry and Parks

Same awarding agency

NAICS: 237990
New
International
Forestry and Parks - Request for Quotes - Lakeland PROVINCIAL PARK Jackson Lake Mile 12 Staging Area Development & Shaw Lake Backcountry Camping Development
Solicitation # AB-2026-07078
This project involves the development and improvement of the Jackson Lake Mile 12 and Shaw Lake staging areas within Lakeland Provincial Park, Alberta. The scope of work includes enhancing parking areas and driving surfaces, clearing vegetation, upgrading connecting trails, and improving day-use picnic areas. Additionally, the contractor will develop walk-in campsites, repair vault toilet roofs, and install or upgrade amenities such as signage, information kiosks, fire rings, and waste receptacles. All work must comply with local and provincial codes, be performed by qualified tradespeople, and include a one-year warranty from the date of acceptance. The selected contractor is responsible for providing all necessary labor, materials, equipment, and transportation, ensuring a complete job that includes all demolition and debris removal. The contractor assumes full liability for any site damages resulting from their activities. To be eligible for the award, proponents must provide a valid Certificate of Recognition (COR), a Temporary Letter of Certification, or a COR Equivalency Letter. In the absence of these certifications, a comprehensive company safety plan and a site-specific safety plan must be submitted. All shop drawings and product alternatives require prior approval before construction begins.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS