Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 24, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fort Benning MATOC

Closed
W911SF-18-R-0022Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, and the contractor must maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors are required to use the Textura electronic invoicing system, provide a 100 percent performance and labor bond if requested, and adhere to arcflash compliance for electrical work. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 4 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$0

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

6650 Meloy Drive Building 6, Suite 320, FORT BENNING, GA, 31905, USA

Set-Aside

SBA

Award Issued Date

Documents

140

16MAY20 Sources Sought Technical Capability Review Q&A

PDF, High priority: read this first9 pages · q-and-a
High

43632 - List of Mechanical Drawings (Revised 11 June 2019)

PDF, High priority: read this first4 pages · specifications
High

43632p3 - Domestic Water New Work Specifications

PDF, High priority: read this firstspecifications
High

A05 Wall Sections

PDF, High priority: read this firstspecifications
High

Addendum 2: JACE 8000 Series Specs for Niagara AX Server Installation

PDF, High priority: read this first6 pages · specifications
High

Addendum No. 1 - MATOC Seed Contract: Replace HVAC System, Building 2882

PDF, High priority: read this first1 page · amendment
High

Addendum No. 4 - MATOC Seed Project: Replace HVAC System, Building 2882

PDF, High priority: read this first2 pages · amendment
High

Amendment 0003 Clarification - Question 135

PDF, High priority: read this first1 page · q-and-a
High

Bldg 2882 HVAC System and Controls Replacement SOW

PDF, High priority: read this first27 pages · sow
High

Bldg 2882 HVAC System and Controls Replacement SOW

PDF, High priority: read this first24 pages · sow
High

Camp Merrill Building 14 Fire Alarm Design Review Submittal (7 Nov 2016)

PDF, High priority: read this first2 pages · specifications
High

Construction MATOC Statement of Work

PDF, High priority: read this first28 pages · sow
High

Construction MATOC Statement of Work (11 June 2019)

PDF, High priority: read this first28 pages · sow
High

Door Hardware and Keying Specifications - Ft. Benning

PDF, High priority: read this first2 pages · specifications
High

Drawing Index - Building 2882

PDF, High priority: read this first4 pages · specifications
High

Enclosure 5 - Construction Specifications

PDF, High priority: read this firstspecifications
High

Fort Benning Fire Alarm/Mass Notification System SOP

PDF, High priority: read this first4 pages · specifications
High

Fort Benning Installation Specific Fire Protection Requirements

PDF, High priority: read this first8 pages · specifications
High

Fort Benning Installation Specific Fire Protection Requirements

PDF, High priority: read this first24 pages · specifications
High

Fort Benning Installation Specific Fire Protection Requirements

PDF, High priority: read this first8 pages · specifications
High

Fort Benning Niagara AX Graphics and Programming Standards Rev 0

PDF, High priority: read this first58 pages · specifications
High

Fort Benning Specifications Cover Sheet

PDF, High priority: read this first3 pages · specifications
High

Fort Benning Specifications Cover Sheet (Revised 11 June 2019)

PDF, High priority: read this first3 pages · specifications
High

Level of Design Matrix

PDF, High priority: read this first2 pages · specifications
High

MAIDIQ Key Personnel Price Worksheet

XLSX, High priority: read this first4 pages · specifications
High

MATOC Seed Project: Addendum No. 3 - Replace HVAC System, Building 2882

PDF, High priority: read this first7 pages · amendment
High

Questions for Amendment 0002

PDF, High priority: read this first21 pages · q-and-a
High

Section 08 11 13 - Steel Doors and Frames

PDF, High priority: read this first9 pages · specifications
High

Section 08 14 00 - Wood Doors

PDF, High priority: read this first5 pages · specifications
High

Section 10 21 13 - Toilet Compartments

PDF, High priority: read this first12 pages · specifications
High

Section 10 28 13 - Toilet Accessories

PDF, High priority: read this first5 pages · specifications
High

Section 13855N - Fire Alarm/Mass Notification System Specification

PDF, High priority: read this first42 pages · specifications
High

SOW - Replace HVAC System and Controls Bldg 2882

PDF, High priority: read this first27 pages · sow
High

UFC 3-600-01 Fire Protection Engineering for Facilities

PDF, High priority: read this first186 pages · specifications
High

UFGS 01 33 00 Submittal Procedures

PDF, High priority: read this first24 pages · specifications
High

UFGS 01 35 26 Governmental Safety Requirements

PDF, High priority: read this first34 pages · specifications
High

UFGS 01 45 00.00 10 - Quality Control

PDF, High priority: read this first12 pages · specifications
High

UFGS 01 78 00 Closeout Submittals

PDF, High priority: read this first15 pages · specifications
High

UFGS 01 78 23 - Operation and Maintenance Data

PDF, High priority: read this first14 pages · specifications
High

UFGS 05 50 13 - Miscellaneous Metal Fabrications

PDF, High priority: read this first9 pages · specifications
High

UFGS 06 61 16 - Solid Surfacing Fabrications

PDF, High priority: read this first9 pages · specifications
High

UFGS 07 84 00 Firestopping

PDF, High priority: read this first8 pages · specifications
High

UFGS 07 92 00 Joint Sealants

PDF, High priority: read this first12 pages · specifications
High

UFGS 08 91 00 - Metal Wall Louvers

PDF, High priority: read this first4 pages · specifications
High

UFGS 09 90 00 - Paints and Coatings

PDF, High priority: read this first29 pages · specifications
High

UFGS 10 21 13 Toilet Compartments

PDF, High priority: read this first10 pages · specifications
High

UFGS 10 28 13 Toilet Accessories

PDF, High priority: read this first4 pages · specifications
High

UFGS 10 44 16 Fire Extinguishers

PDF, High priority: read this first4 pages · specifications
High

UFGS 11 47 00 Ice Machines

PDF, High priority: read this first3 pages · specifications
High

UFGS 22 00 00 - Plumbing, General

PDF, High priority: read this first52 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

11 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jan 28, 2019 to Apr 27, 2019. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Apr 27, 2019 to May 29, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 29, 2019 to Jun 17, 2019. The notice description changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 10:00 PM UTC on Jun 17, 2019. The notice description changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 17, 2019 to Jun 25, 2019. The notice description changed.

Notice updated

Response deadline changed from Jun 25, 2019 to Jun 26, 2019. The notice description changed.

Notice updated

Response deadline changed from Jun 26, 2019 to Jun 27, 2019. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Leonard Wood
Contacts2 people available
OfficeFORT LEONARD WOOD, MO, 65473-0140, USA
Office AddressFORT LEONARD WOOD, MO, 65473-0140, USA
Contacts
Jackie D PeacockContract Specialist

Full Description

Show more
24 June 2019 - Amendment 0003 provides changes to section M of the solicitation and clarification to Question #135 of amendment 0002. Proposals are due 27 June 2019 by 4:00 PM EST.

More opportunities from Department Of Defense → W6QM Micc-Ft Leonard Wood

Same awarding agency

NAICS: 325120
Federal
Propane Fort Leonard Wood
Solicitation # W911S727BA000
The Department of Defense, through the W6QM MICC-Ft Leonard Wood, is conducting a sources sought notice to identify qualified small businesses capable of supplying and delivering propane gas on a requirements basis. The services will support locations at Fort Leonard Wood, Missouri, and the US Army Lake of the Ozarks Recreation Facility (LORA) near Camdenton, Missouri. The anticipated contract structure consists of one base year and four one-year renewable options, for a maximum performance period of five years, with a projected start date of April 1, 2027. The requirement falls under NAICS code 325120 for Industrial Gas Manufacturing. The scope of work includes monitoring fuel levels, filling tanks, and redistributing government-owned propane between tanks as directed. All propane must meet or exceed GPA Standard 2140-97. The contractor is required to provide a delivery schedule within 60 days of the start of work and must calibrate propane meters at least once per quarter. Performance will be monitored by the Directorate of Public Works (DPW) Operation Branch using a Quality Assurance Surveillance Plan and a Performance Requirements Summary. Invoicing and payment will be processed through the Wide Area Work Flow (WAWF) system. This notice is for planning purposes and does not constitute a formal solicitation. The government intends to set aside this procurement for small businesses, provided at least two qualified small businesses respond with sufficient capability information. Interested firms must submit their company details, CAGE code, and small business status via email to the designated points of contact by 3:00 pm Central Time on October 30, 2026.
Industrial Gas Manufacturing

POSTED

28 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS