Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fort Bliss B2903 Kitchenette (Amendment 3)

Closed
W911RX-26-B-A004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment activities, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. Failure to submit proof of these specific public notices and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Documentation for general outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, proof of specific automobile liability insurance naming Adams and Associates, Inc. as an additional insured, and compliance with Davis-Bacon Act wage determinations, OSHA, EPA, ADA, and NFPA-101 life safety codes. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The U.S. Army’s Mission and Installation Contracting Command at Fort Riley, Kansas, is soliciting sealed bids for the installation of a new kitchenette in Building 2903 at Fort Bliss, Texas, under a Firm-Fixed-Price contract set aside entirely for small businesses. The work encompasses comprehensive renovations including new ceiling systems for kitchen use, installation of upper and base cabinets, countertops, backsplashes, a sink with garbage disposal, a drinking fountain, new plumbing runs above ceilings and below floors to the basement, a range hood with wall-mounted exhaust ducting, electrical wiring and conduit, and necessary wall repairs and painting across all three levels of the structure. The project is governed by the NAICS code 236220 with a size standard of $45 million, and the contract value is estimated between $100,000 and $250,000. The period of performance is 120 calendar days following the Notice to Proceed, with liquidated damages of $1,717.24 per day for delays. Bids must be submitted via hard copy only, either hand-delivered during specified hours or mailed via UPS, USPS, or FedEx with tracking numbers reported to designated contacts. Electronic submissions, including email and fax, are strictly prohibited. The solicitation mandates strict compliance with federal, state, and local regulations, including the Unified Facilities Guide Specifications, International Code Council standards, NFPA 101 Life Safety Code, and Architectural Barriers Act requirements. Contractors must adhere to stringent safety protocols outlined in USACE EM 385-1-1 and OSHA 1926 standards, require all personnel to complete asbestos awareness and OSHA 30-hour construction training, and undergo antiterrorism and OPSEC training, including iWATCH Army program briefings. All workers must comply with identity verification procedures including NACI-level background checks for CAC access. The offeror must provide Performance and Payment Bonds within ten days of award, as well as an original bid bond as required by FAR 52.228-1. The contract includes mandatory clauses on convict labor, withholding of funds, security prohibitions, subcontractor management, inspection of construction, warranty, termination for convenience, drug-free workplace, and cybersecurity safeguards. All work is subject to government inspection under FAR 52.246-12, requiring a formal pre-final inspection and final acceptance inspection with contractor management and the Contracting

General Info

Firm-fixed-price contract for kitchenette installation at Fort Bliss, $250K-$500K, 180-day completion.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Bliss, TX, 79916, USA

Set-Aside

SBA

Documents

22

Addendum 1 for Solicitation W911RX-26-B-A004 Install Kitchenette at B2903

PDF, High priority: read this firstamendment
High

Amendment 0001 to Solicitation W911RX26BA004

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W911RX26BA004

PDF, High priority: read this firstamendment
High

Amendment W911RX26BA0040003 to IFB W911RX-26-B-A004 Kitchenette Installation

PDF, High priority: read this firstamendment
High

DWG_2903 Kitchenette New Work Plans

PDF, High priority: read this firstspecifications
High

Environmental Review Record of Environmental Consideration NEPA Log#26-0380

PDF, High priority: read this firstenvironmental-review
High

Fort Bliss Fire Prevention Construction Guide 2025

PDF, High priority: read this firstfire-prevention-guide
High

iWATCH Army Training for Contractors

PDF, High priority: read this firsttraining-material
High

Request for Information Report Template

PDF, High priority: read this firstrfi
High

RFI Response for W911RX-26-B-A004 Small Business Set-Aside Clarifications

PDF, High priority: read this firstrfi-response
High

Room Finish Schedule B2903 Kitchenette

PDF, High priority: read this firstspecifications
High

Solicitation W911RX26BA0040001 - Kitchenette Install B2903 IFB

PDF, High priority: read this firstifb
High

Solicitation W911RX26BA0040002 - Kitchenette Install B2903 IFB

PDF, High priority: read this firstifb
High

Solicitation W911RX26BA0040003 - Kitchenette Install B2903 Fort Bliss

PDF, High priority: read this firstifb
High

Solicitation W911RX26BA004 - Kitchenette Install B2903 Fort Bliss IFB

PDF, High priority: read this firstifb
High

Statement of Work for Kitchenette Installation at B2903 Amendment 0002

PDF, High priority: read this firstsow
High

Statement of Work for Kitchenette Installation at B2903 Fort Bliss

PDF, High priority: read this firstsow
High

TRADOC Form 928-R-E Material Approval Submittal Form

PDF, High priority: read this firstmaterial-approval-submittal-form
High

Wage Determination TX20260245 for Texas Construction

PDF, High priority: read this firstwage-determination
High

Asbestos and Lead-Based Paint Survey Report for Building 2903 Fort Bliss TX

PDF, Low prioritysurvey-report
Low

Building 2903 Basement & 1st Floor Plumbing As-Built Drawings Addendum 1

PDF, Low priorityas-built-drawings
Low

ENG_FORM_4288-R_Submittal+Register+Form.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline changed from Jun 18, 2026 to Jul 20, 2026. The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Jul 20, 2026 to Jul 27, 2026. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Riley
Contacts2 people available
OfficeFORT RILEY, KS, 66442-0248, USA
Office AddressFORT RILEY, KS, 66442-0248, USA
Contacts
Patricia Barth
Kevin M Jones

Full Description

Show more

The mission and Installation Contracting Command (MICC)- Ft. Riley, KS is issuing a solicitation for an Invitation for Bids (IFB) to award a single firm-fixed-price contract to install new kitchenettes at  Building 2903 (Room 125). Work to include new ceiling for kitchen use, upper and base cabinets, counter tops and backsplash, new sink, garbage disposal, drinking fountain, new plumbing work above the ceiling and below the floor to the basement for new sink faucet and waste disposal, new range hood through wall exhaust duct and vent, wiring and conduit and any wall repair / paint for all three levels. Work is located within the Fort Bliss TX Installation. 


The contract duration is 120 days after notice to proceed.  This project is a Total Small Business set aside. The North American Industry Classification System (NAICS) code is 236220, with a size standard of $45,000,000.00.  The magnitude of construction is between $100,000 and $250,000. The solicitation will result in a Firm-Fixed-Price (FFP) contract. 


24 June 2026: Amendment 1 or W911RX-26-B-A0040001 has been posted to add an attachment for an asbestos survey, additional clauses, and to clarify the language in Section 00 00 00.


08 July 2026: Amendment 2 or W911RX-26-B-A0040002 has been posted. Amendment 2 provides a change in project magnitude, an attachment response for RFIs, and a revised SOW. Regarding the SOW, item 1.4.2.1. Includes more information regarding Hazardous Requirements, item 1.4.6.1. has been removed, and item 1.4.7.2. has been revised to include a different location. 


16 July 2026: Amendment 3 or W911RX-26-B-A0040003 has been posted. Amendment 3 provides a clarification on the period of performance which is 120 days after the notice to proceed. The deadline has also been extended to allow time for prospective bidders to modify their bids. 


Please see attached solicitation and supporting documents.


If you will be hand delivering your bid before the bid opening, you shall coordinate drop off by e-mailing Silvia Kane at contact@example.gov & Patricia Barth at contact@example.gov.


If you will be mailing your bid via UPS, USPS, or FedEx, please e-mail tracking number to Silvia Kane at contact@example.gov & Patricia Barth at contact@example.gov.

More opportunities from Department Of Defense → W6QM Micc-Ft Riley

Same awarding agency

NAICS: 212321
Federal
Aggregate Stone Material - Fort Riley, Kansas
Solicitation # W911RX27QA002
Solicitation W911RX27QA002 is a Firm-Fixed Price requirements contract set aside 100% for small businesses under NAICS 212321. The contract covers the procurement, hauling, and delivery of various aggregate stone and sand materials, specifically AB-3, SA-1, SS-5, and Fill Sand (FA-3), to multiple Directorate of Public Works locations at Fort Riley, Kansas. These materials are essential for maintaining base road infrastructure, tactical trails, and erosion control. The period of performance begins January 1, 2027, and consists of a base year with four subsequent option years. Award will be determined based on the Lowest Price Technically Acceptable (LPTA) criteria, evaluating technical capability, past performance, and total evaluated price. The contractor is responsible for all transportation costs under FOB Destination terms and must utilize cleaned, tight-bed dump trucks or semi-trailers to prevent leakage and adhere to weight limits. Deliveries must commence within five business days of order issuance, following a 3-to-5-day advance notice. All materials must meet strict gradation, moisture, and purity standards, with laboratory certification required prior to initial delivery and certified weight tickets provided upon delivery. Contractors must comply with Fort Riley special requirements, including mandatory insurance per FAR 52.228-5, pollution prevention, and security badge protocols. Invoicing and payment will be processed electronically through the Wide Area WorkFlow (WAWF) system.
Construction Sand and Gravel Mining

POSTED

9 days ago

DEADLINE

in 11 days
View Details
NAICS: 562111
Federal
FY27 APOD Solid Waste - Fort Polk
Solicitation # W911RX-27-Q-1CJ4
The Mission and Installation Contracting Command Fort Riley is seeking sources for a non-personal services contract to provide solid waste management at the Aerial Port of Debarkation England Airpark, located at Alexandria International Airport in Alexandria, Louisiana. This total small business set-aside requirement involves the collection, transportation, and disposal of solid waste. The contractor must furnish at least seven 40-cubic-yard roll-off containers, with the ability to provide seven additional units if requested. Key operational requirements include collecting large bulky items at least once weekly, performing unscheduled collections within four duty hours of notification, and transporting all waste to a permitted facility within three days of collection. The contractor is required to provide a Program Manager and an Alternate Program Manager, with specific availability hours for both non-rotational and rotational periods. Essential deliverables include a Quality Control Plan, a Safety Plan, and Anti-Terrorism Level I Training, all due within 30 days of award. Compliance with FAR 52.236-13 for accident prevention and OSHA standards for personal protective equipment is mandatory. Additionally, vehicle operators must hold valid licenses, with a Louisiana State Commercial Driver's License required for vehicles rated at 2.5 tons or those hauling hazardous materials. The government will evaluate performance based on a Performance Requirements Summary, specifically monitoring vehicle appearance and ensuring that APOD waste is not commingled with other sources.
Solid Waste Collection

POSTED

14 days ago

DEADLINE

in about 11 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS