Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 22, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FORT IRWIN RENEWABLE ENERGY SERVICES (FIRES)

Closed
W9124J20R0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a pool of prequalified energy service providers to design, install, operate, and maintain clean energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors finance, own, and operate the systems with no upfront capital required from state agencies. Projects will be managed under long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity sold to host facilities at a fixed price per kilowatt hour. Systems are categorized by size into Class 1 (under 0.50 MW), Class 2 (0.51 MW to 10.0 MW), and Class 3 (over 10.0 MW). To qualify for the vendor pool, respondents must pass a comprehensive evaluation of their technical qualifications, financial strength, and regulatory compliance. Mandatory requirements include providing a California Secretary of State Certificate of Status, a Darfur Contracting Act Certification, and a veracity statement. Vendors must hold appropriate licensing, such as C-10 Electrical or C-46 Solar certifications, and provide evidence of adequate bonding capacity and creditworthiness from recognized rating agencies. Additionally, a commitment letter from financing partners is required. Qualified vendors will then be eligible to bid on specific future projects through subsequent Requests for Proposals. Responses are due by December 23, 2026, and must be submitted in both hard copy and electronic formats.
California Department of General Services

POSTED

13 days ago

DEADLINE

in 2 months
NAICS: 221114
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Solicitation # JN 225005
The Operations Yard and Employee Parking Lot PV Solar and Battery Project, identified by JN 225005, is an initiative by the Padre Dam Municipal Water District located in Santee, California. The project involves the design and installation of a photovoltaic solar panel array, a battery storage system, and Level 2 EV charging stations. Solar panels will be mounted on existing canopy roofs or on newly constructed carport structures within the existing employee parking lot. The scope of work also includes minor alterations to existing structures and mechanical equipment, as well as necessary ADA upgrades. All construction and operational activities will take place within existing District property at active operations facilities and previously developed or disturbed areas. The primary objectives of this project are to improve energy efficiency, stabilize long-term energy costs, and reduce the environmental impacts associated with the District's energy consumption. All work must comply with all applicable codes, regulations, and standards. Regarding environmental regulatory compliance, the project has been granted a Notice of Exemption under CEQA Guidelines Sections 15301, 15303, and 15311, as the work constitutes minor alterations and the construction of new small structures without an expansion of use. The project is managed by the Director of Engineering and Planning, Lewis Clapp, and is situated at 9120 Carlton Oaks Drive in San Diego County.
Padre Dam Municipal Water District

POSTED

25 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

25 days ago

DEADLINE

N/A

General Info

Contract Value

$224,480.16

NAICS

221114 - Solar Electric Power Generation

Place of Performance

TX

Set-Aside

NONE

Award Issued Date

Documents

9

Amendment+0001+W9124J-20-R-0009.pdf

PDF

FBO.PDF

PDF

Posted+Q+and+As++as+of+19+Jun+2020+-+W9124J-20-R-0009.pdf

PDF

Q++A+-+W9124J-20-R-0009+-+as+of+01+Jun+20.pdf

PDF

Rev2+PERFORMANCE+WORK+STATEMENT+28MAY2020.pdf

PDF

RFP+W9124J-20-R-0009+-+Ft+Irwin+Renewable+Energy+Services.pdf

PDF

Site+Visit+Request+Process+Request+Ft+Irwin.pdf

PDF

TE-1_Spares_Inventory.xlsx

XLSX

W9124J20R0009.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Fdo Ft Sam Houston
Contacts2 people available
OfficeFORT SAM HOUSTON, TX, 78234-1361, USA
Office AddressFORT SAM HOUSTON, TX, 78234-1361, USA

Full Description

Show more
This is a non-personnel services contract to maintain the renewable energy facilities installed on Fort Irwin and their supporting infrastructure. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to maintain renewable energy facilities installed on Fort Irwin and their supporting infrastructure as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract. Objectives: Operate and Maintain Government-Owned Fort Irwin Renewable Energy Systems (FIRES), the list of the renewable energy facilities are as follows: - 1 MW Soitec based Concentrated PhotoVoltaic (CPV) plant - 2.4DC/2.0AC MW Hospital solar plant - Facilities >100 kw, <1MW including; o Building 990 507 kW car port mounted PhotoVoltaic (PV) o Building 998 254 kW car port mounted PV o RUFMA 108 kW shelter mounted PV - Faciliti s <100 kw o o Building 237 10.2 kW roof mounted PV o Building 254 18.4 kW roof mounted PV o Building 452 19 kW roof mounted PV o Building 990 15.8 kW roof mounted PV o Building 4980 13kW roof mounted PV - Net Zero o Ammo Supply Point (ASP) net zero roof mounted PV, battery storage, and inverter(s) o Theatre Support Division (TSD) net zero roof mounted PV, battery storage, and inverter(s) - Telemetry system located in Building 384 - Major / Emergency Maintenance - Major repairs of CPV

More opportunities from Department Of Defense → W6QM Micc-Fdo Ft Sam Houston

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS