Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on October 2, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--679-19-1-5533-0002 VISN 7 Solar PV Service and Maintenance Contract (VA-19-00016340)

Awarded
36C24719R0031Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

7 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

23 days ago

DEADLINE

in about 2 months

General Info

Agency

N/A

Contract Value

$743,800

NAICS

221114 - Solar Electric Power Generation

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice type changed from Presolicitation to Special Notice. The response deadline was removed. The notice title changed. Set-aside removed. The notice description changed.

Notice updated

Response deadline added: Sep 20, 2019. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This is a pre-solicitation for commercial services prepared in accordance with Federal Acquisition Regulation (FAR) Parts 12 and 13, The Department of Veterans Affairs (VA), Veterans Integrated Service Network (VISN7) has a requirement to procure routine maintenance and rapid response corrective maintenance component support services of Solar PV Systems for medical facilities supported by the Network Contracting Office NCO7 (Southeast Region). Services shall be procured under North American industry Classification System (NAICS) code is 221114 Solar Electric Power Generation with a Size Standard of employees 250. This requirement will be solicited as a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns in accordance 38 USC 8127-8128 regarding the Veterans First Contracting Program and implemented under VA Acquisition Regulation (VAAR) subpart 819.70 as a result of the June 16, 2016 decision of the U.S. Supreme Court in Kingdom ware Technologies, Inc. v. United States (Kingdom ware). A Solicitation is forth coming and will be posted to fbo.gov Site Visit information for Solar PV Panel Systems: The Solar PV panel systems are located in three (3) states within the Veterans Integrated Service Network (VISN 7) area: Tuscaloosa, Alabama, Montgomery, Alabama, Augusta Georgia, Dublin Georgia and Columbia, South Carolina. The site visits for this requirement will be conducted over an estimated three (3) day period within the VISN 7 area. The scheduled dates are April 23, 24 and 25, 2019. Attendance is free and open to all SDVOSB business concerns. Attendance is NOT mandatory nor required but is strongly encouraged. Participants are solely responsible for all expenses associated with travel and lodging associated with participation in the scheduled Site Visit. Attending: To attend the Site Visit, interested businesses shall register with the Contracting Specialist via email at contact@example.gov no later than Monday, April 16, 2019 at 2:00 PM EST. There is a maximum of two (2) individuals per company. The location and point of contact for the initial site will be provided to those participating SDVOSBs after the due date of registration. Please indicated the site or sites you will attend. Registration requires the following information to be submitted: Name of Company Site Location Attending Number of Attendees Name of Individual(s) attending. Title of person(s) attending (President, CEO, CFO, Etc.) Email Address(es) of person(s) attending Cell Phone Number of at least one individual attending (In case of changes the morning of site visit) NOTE: Attendees must have valid identification (i.e. driver license) - Copies are not acceptable Questions will be permitted during each site visit however, all government responses during the visit are unofficial. Offerors will be asked to confirm verbal questions in writing for each location visit. The Government will receive questions pertaining to each visit on April 25, 2019 PERFORMANCE WORK STATEMENT FOR VISN 7 SOLAR PV MAINTENANCE SERVICES 1. DESCRIPTION OF SERVICES: This is a complete service contract for Routine Maintenance as well as a Rapid Response Corrective Maintenance Component and for the proper functioning of the Solar PV systems at the following VISN 7 Department of Veterans Affairs Medical Centers (VAMCs) Tuscaloosa, Alabama, Montgomery, Alabama, Dublin Georgia, Augusta Georgia and Columbia, South Carolina. The preventative maintenance program is designed to ensure all aspects of each system is installed and working in the most efficient means possible, ensuring maximum generation capacity. The corrective maintenance portion is designed to quickly address any component/system failures that unexpectedly arise resulting in lost production. This contract is for a base year and 4 option years to cover the Solar PV systems as listed, for each of the years. Contractor will provide at contractor s expense all supervision, tools, materials, supplies, equipment and labor to perform the work. Site Visits can be arranged for field verification. LISTING LOCATIONS OF SOLAR PV SYSTEMS: Facility PV Capacity Types of Structures for PV Number of Panels Augusta 1.26 MW 2 Acre Ground Mount 3900 Dublin 185KW Rooftop, Canopy 800 Montgomery 400 KW Rooftop, Ground Mount >1400 Tuscaloosa 2.6 MW 4 Acre Ground Mount, 3 Canopy Structures >3000 Columbia 1.3 MW 3 Parking canopies >3000 Scope of Work - Preventative Maintenance: Contractor shall conduct 2 planned preventative maintenance visits per facility per year. Contractor will coordinate with the staff at the VA Medical Center to determine the most reasonable time to conduct preventative maintenance visits. The VAMC is expecting the following during preventative maintenance visits for each facility where applicable: Inspect all electrical equipment for water-tight integrity, cleanliness and proper operation. Grounding components will be checked for integrity. Conduct electrical checks to verify performance of the solar PV array. Ground-mounted systems will be inspected for structural integrity, corrosion and erosion. The monitoring system will be analyzed to verify satisfactory system performance. Thoroughly clean all solar PV panels in the array. Mow and trim the grass inside the solar PV array fenced in area (where applicable per facility). Replace any required NEC markings that are worn or faded. A preventative maintenance report shall be provided to the COR and facility Energy Manager that will show the results of the site visit and explain any corrective actions that were taken, to include information regarding any corrective maintenance visits. 3. CORRECTIVE MAINTENANCE: Contractor shall review monitoring system information weekly to determine if there is any corrective action needed. In the event of a situation that requires corrective action, contractor shall inform the COR and facility Energy Manager at the VAMC. Within 3 days of becoming aware of any malfunction, contractor is required to inform the COR and facility Energy Manager at the VAMC of plans for repair. With respect to corrective maintenance, contractor shall respond within 48 hours of notification of a system/component failure that results in lost production. The following is a list of items to be completed as part of the corrective maintenance program: The monitoring system will be utilized to gain as much information as possible to identify the fault/failure. Once on site, information will be gathered and a troubleshooting plan established to identify the failure/fault. Once the fault is identified, it will be determined what the nature of the failure was, if the failure is a warranty covered failure, and what actions are required to correct the failure. If the failure will be covered under warranty, contractor shall coordinate with the respective vendor to correct the fault/failure. If the failure is the result of some action that will not be covered under warranty, contractor shall notify the COR and facility Energy Manager and determine what actions the VA desires to be taken towards correcting the fault/failure. Most faults that occur are such that the contractor can identify and correct them on the spot. Any fault covered under warranty and requiring coordination with the vendor for tech support/replacement parts will be closely managed/supervised by the contractor to ensure prompt action. A detailed maintenance report will be provided following each visit. Any damage, fault or other malfunction resulting from workmanship, manufacturing defect, blown fuse, or any other fault/failure covered by a manufacturer s warranty shall be corrected by the contractor. Corrections such as blown fuses, loose connections, etc. shall be corrected on the spot. Any correction that will require coordination with vendor for replacement parts related to warranty coverage shall be coordinated by and corrected by the contractor. Any fault/failure or damage resulting from actions/incidents which falls outside of workmanship or warranty coverage specifications may be corrected by the contractor at the direction and expense of the VA. Any such failure will be noted on the inspection report and specifically addressed with the COR and facility Energy Manager prior to contractor departure from the site. REPORTING: For repairs or services that will be performed during normal working hours, the Contractor repairman must notify the Facility s Energy Manager. Contractor will need to obtain an Identification Badge which shall be worn at all times while on station. After all work is completed, the Contractor must notify the facility s Energy Manager of completion. A service report will be sent to the COR and Facility Energy Manager following the completion of site visits. For repairs or services required after normal working hours the Contractor s repairman shall notify the Facility s Energy Manger for coordination. PERFORMANCE AND DELIVERABLES: The Contractor must respond in accordance with above maintenance descriptions. All work must be performed by competent personnel who are experienced and qualified to work on the specific equipment. All work performed shall be accomplished in accordance with the manufacturer s instructions including, but not limited to, adjustments, calibrations, cleaning, lubrication, testing, disassembly, check-out, replacement of worn or defective parts, etc., required to keep the equipment in operating condition. Contractor s maintenance of the equipment must satisfy all requirements as set forth by NFPA, OSHA, ASME and JCAHO. Contractor must ensure all trash and debris is removed from site after work is completed. PEFORMANCE PERIOD: The services shall be within five days after contract award authorizes the services for a base period of twelve (12) months with four (4) additional one-year option periods. KEY PERSONNEL: Approval of Key Personnel, as specified in Contractor s Technical Proposal who will be working on this project, must be obtained from the Government within thirty (30) business days of any change in these Key Personnel. The Contractor s Project Manager is a Key Person as defined by this section. Name Position/Title Skill Set Start Date A. CONTRACTOR PERSONNEL REQUIREMENTS - The Contractor shall provide personnel capable of performing routine maintenance as well as a rapid response corrective maintenance component, all related industry and governmental departments instructions and regulations for successful accomplishment of the work to be performed under this contract. Additionally, all personnel shall pass a Government specified background investigation prior to working with Personally Identifiable Information. The position sensitivity for this effort has been designated as Low Risk and the level of background investigation is a National Agency Check with Written Inquiries. All personnel shall be U.S. Citizens. The Contractor will coordinate with the COR for all Security Issues. HOURS OF WORK: This contract shall include all necessary service calls seven (7) days per week, between the hours of 8:00a.m. and 4:30p.m. Central Standard Time, Federal Holidays included. CONTRACT TYPE: - This is a firm fixed price contract TRAVEL: The Department of Veterans Affairs Medical Centers (VAMCs) is NOT responsible for any travel expenses associated with this requirement. AUTHORIZED SERVICES: The only services authorized under this contract are routine repairs and preventative maintenance checks and services. Routine repairs are defined as those repairs caused by normal wear and tear. Before performing any service or repair of a non-contract nature, the Contracting Officer or his/her designee must be advised of the reason for this additional work. All performance under this contract shall fall within the scope of work identified in Section 1 Scope of Work. Changes to the scope of work will require a bilateral modification between both the government and contractor in accordance with FAR 52.212-4 (c) Changes. COR AUTHORITY: In no event is the COR empowered to change any of the terms and conditions of the contract. All changes, to any section of this contract, shall be made only by the Contracting Officer pursuant to a properly executed modification. The types of actions within the purview of the COR s authority are to ensure that the Contractor performs the technical requirements of the contract, and to notify the Contracting Officer of any deficiencies observed. A Letter of Designation shall be issued to the COR and a copy shall be sent to the Contractor at the time of contract kickoff meeting or post-award conference setting forth in full the responsibilities and limitations of the COR. DISCONTINUANCE OF SERVICE: The Government reserves the right to terminate service under this contract in accordance with FAR 52.212-4 (l)(m). SUBCONTRACTING: Due to the complexity of the services required herein, if subcontracting is required to meet the services performed under this contract a subcontracting plan shall be submitted in accordance with FAR Regulations. PARTS: (a) Only new, standard parts shall be furnished by the Contractor. All parts shall be of current manufacture and have versatility with presently installed equipment. (b) All newly installed replacement parts become the property of the Government. Replaced parts are to be disposed of legally by the Contractor after obtaining approval from the Contracting Officer s Representative (COR). GOVERNMENT FURINSH EQUIPMENT: The VAMC will not furnish parts and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring the appropriate equipment and/or supplies necessary to complete the work as required within. QUALITY CONTROL: After contract award, the Contractor shall follow the Quality Assurance and Surveillance Plan (QASP) developed by the Government. The QASP with performance goals and acceptable quality levels is necessary to ensure quality for this acquisition. The Contractor shall address any issues meeting established Government performance goals as needed. The Contractor shall provide a Quality Control Plan that will demonstrate how the QASP performance goals will be sustained during the life of this contract. - A. - QUALITY ASSURANCE: As stated in the QASP, the Government shall evaluate the Contractor's performance under this contract. For those tasks listed in the QASP, the COR or evaluators shall follow the methods of surveillance specified in this contract. The Government shall record all surveillance observations. When an observation indicates defective performance, the COR shall forward the observation to the Contractor manager or alternate(s), who shall initial the observation. The initialing of the observation does not necessarily constitute concurrence with the observation, only acknowledgment that he or she has been made aware of the defective performance. Government surveillance of tasks not listed in the QASP or by methods other than those listed in the QASP may occur during the performance period of this contract. Such surveillance shall be done according to standard inspection procedures or other contract provisions. Deliverables PWS Section Performance Standard AQL Planned Preventative Maintenance Visits 1 Setup and Coordination with Energy Managers for schedule visits Services shall be performed within 5 days of being scheduled. Performance Maintenance/Service of PV systems in accordance with PWS 1 Section 1 of PWS objectives are meet and satisfied No maintenance service items shall be missed Corrective Maintenance 2 Section 2 of PWS objectives are meet and satisfied System Functions 95% of time. Reporting 3 Section 3 of PWS objectives are meet and satisfied Reports are received within 5 working days following work completion Performance 4 Section 4 of PWS objectives are meet and satisfied Requirements met 100% of time COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS: The Contractor shall ensure that services provided to the Government under this agreement comply with all applicable laws, statutes, regulations, and guidelines that govern the operation of systems by the Government. The Contractor shall also ensure that all services provided to the Government under this contract comply with all Government mandated procedures, standards, and requirements. As the Government develops and implements new or modified policies and procedures either to comply with internal agency rules and procedures or to comply with applicable rules, regulations, statutes, or other binding obligations ("Additional Compliance Terms"), the Government reserves the right to incorporate such Additional Compliance Terms into this contract via a bilateral modification.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS