Fort Peck PH 1 Surge Tank Roof Replacement

Awarded
W9128F25BA002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
INDEX ROOF FLUID APPLIED ROOF
Solicitation # 27-350SOS-PHYSE-B-54721
The Illinois Secretary of State is soliciting bids for the installation of a new fluid-applied roof system on the Index Building located at 111 E. Monroe St, Springfield, IL. The project requires the application of a white, cold-applied, single-component silicone elastomer membrane designed for permanent weather and sunlight exposure. Key deliverables include the construction of a 100 square foot mock-up, the performance of a 72-hour flood test to ensure water resistance, and the provision of a 20-year manufacturer full labor and material warranty. The award will be granted to the responsive and responsible bidder who submits the lowest price. Bidders must submit all proposals electronically via BidBuy by November 19, 2026, and must provide a 10% bid bond. The contract requires adherence to strict material storage and delivery standards, including the use of original manufacturer containers and storage in weather-protected environments. Compliance with the State Prompt Payment Act, prevailing wage laws, and the Illinois Department of Human Rights Act is mandatory. Additionally, the total contract term, including all renewals and extensions, cannot exceed ten years. Vendors must provide a Certificate of Insurance naming the State as an additionally insured party and are responsible for all safety barricades and traffic signage during the project.
PHYSERV350 - Physical Services

POSTED

about 18 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Omaha District, is soliciting bids for the Fort Peck PH 1 Surge Tank Roof Replacement at the Fort Peck Dam in Valley County, Montana. This project is a total small business set-aside with an estimated construction magnitude between 1,000,000 and 5,000,000 dollars. The work involves restoring a 2,500 square foot roof, situated approximately 272 feet above grade, to its original 1940s design in compliance with Montana State Historical Preservation Office regulations. The scope includes the complete removal of existing felt and Ludowici Provincial clay tile shingles and their replacement with matching materials, along with new copper flashings and potential asphaltic waterproofing, while preserving the existing precast concrete roof slabs. The procurement is conducted as a two-step sealed bid process. Step-One focused on technical approach and qualifications without pricing, while Step-Two involved final pricing from technically acceptable firms. Amendment 0003 identified five firms eligible for Step-Two pricing: AOD RBT Roofing JV, A-VET Roofing, Blue Frog Roofing Limited, Tradesmen Group, LLC, and Tri Coast Construction. The contract requires strict adherence to historical preservation standards, specific Montana building construction wage determinations, and mandatory antiterrorism and operations security training for all personnel. Final offers must acknowledge all amendments, including updates to the instructions to bidders and the addition of detailed technical specifications and reference drawings.

General Info

Contract Value

$1,116,246

NAICS

238160 - Roofing Contractors

Place of Performance

Nashua, MT, 59248, USA

Set-Aside

SBA

Award Issued Date

Documents

15

Amendment 0002 - Construction of FP PH1 Surge Tank Roof Replacement

PDF, High priority: read this first1 page · amendment
High

Amendment W9128F25BA0020002

PDF, High priority: read this first3 pages · amendment
High

Antiterrorism (AT)/Operations Security (OPSEC) Provisions

PDF, High priority: read this firstspecifications
High

Fort Peck Dam Powerhouse #1 Roof Repairs - Drawings

PDF, High priority: read this first18 pages · specifications
High

Fort Peck Surge Tank Roof Replacement - Abstract of Offers

PDF, High priority: read this first1 page · abstract-of-offers
High

FP PH1 Surge Tank Roof Replacement - Bid Schedule

PDF, High priority: read this first1 page · specifications
High

FP PH1 Surge Tank Roof STEP 1 Drawing

PDF, High priority: read this firstspecifications
High

MT20250057 - Building Construction Wage Determination (Montana)

PDF, High priority: read this firstwage-determination
High

Powerhouse #1 Roof Repairs Fort Peck Dam - Section 01 12 00 Construction General

PDF, High priority: read this first6 pages · specifications
High

Powerhouse #1 Surge Tank Roof Replacement Specifications - W9128F25BA002

PDF, High priority: read this first222 pages · specifications
High

Solicitation W9128F25BA002 - FP PH1 Surge Tank Roof Replacement

PDF, High priority: read this first48 pages · ifb
High

W9128F25BA002 AM0002 FP PH1 Surge Tank Repair Reference Drawings

PDF, High priority: read this firstspecifications
High

W91Z8F25BA002 Amendment 0001 - Fort Peck Surge Tank Roof Replacement

PDF, High priority: read this firstamendment
High

Attachment A - Past Performance Questionnaire (Form PPQ-0)

PDF, Low prioritypast-performance
Low

Site Visit Attendee List - Powerhouse #1 Surge Tank Roof Replacement (W9128F25BA002)

PDF, Low priority1 page · site-visit-list
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 5, 2025 to Jun 12, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 12, 2025 to Jul 22, 2025. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts

Full Description

Show more
BID ABSTRACT HAS BEEN UPLOADED INTO THE ATTACHMENT SECTION. ========================================================= AMENDMENT 0003 FOR ACCEPTABLE BIDS IN STEP ONE THAT ARE TO STEP - TWO PRICING ARE AS FOLLOWED BELOW ONLY: 1. AOD RBT ROOFING JV; 2. A-VET ROOFING; 3. BLUE FROG ROOFING LIMITED; 4. TRADESMEN GROUP, LLC.; 5. TRI COAST CONSTRUCTION THE SPECIFICATION AND DRAWINGS ARE 100% COMPLETE IN THE ATTACHMENT SECTION AND AMENDMENT 0003 HAS BEEN INCLUDED IN THE ATTACHMENT SECTION. UPON SUBMITTING STEP-2 PRICING, ACKNOWLEDGE ALL AMENDMENT FROM STEP-1 AND STEP-2 WITH YOUR FINAL OFFER. =========================================================== AMENDMENT 0002 PLUS AMENDMENT NARRATIVE, AM0002 01 12 00 FP PH1 SURGE TANK SPECS, AND AM0002 W9128F25BA002 4 OF 4 FP PH1 SURGE TANK REPAIR REFERENCE DRAWINGS ARE POSTED IN THE ATTACHMENT SECTION OF THIS SOLICITATION. ACKNOWLEDGEMENT OF ALL AMENDMENTS MUST BE PROVIDED WHEN SENDING IN STEP ONE AND STEP TWO OF THE OFFER. =========================================================== AMENDMENT 0002 TO EXTEND THE SOLICITATION DUE DATE FROM 5 JUNE 2025 12 JUNE 2025 WILL BE POSTED TOMORROW MORNING. =========================================================== AMENDMENT 0001 TO UPDATE THE 2100 INSTRUCTIONS. PLEASE REVIEW AND ACKNOWLEDGE THE AMENDMENT AND PROVIDE WHEN SENDING IN THE STEP-ONE TECHNCIAL APPROACH. =========================================================== SITE VISIT SIGN IN SHEET POSTED. ============================================================ This SOLICITATION is for W9128F25BA002. The U.S. Army Corps of Engineers, Omaha District intends to issue a Two-Step IFB solicitation for - Fort Peck PH 1 Surge Tank Roof Replacement. The solicitation will close on or about 5 June 2024 by 2:00 PM CT. Step-One will be for the Technical only. NO pricing information will be provided during the Step-One process. DESCRIPTION OF WORK: The Surge Tank roof of the Ft. Peck Powerhouse, constructed in the 1940s, requires restoration to its original design in compliance with Montana State Historical Preservation Office (SHPO) regulations. The project involves the complete removal of existing roofing layers, including felt and Ludowici Provincial clay tile shingles, and the replacement with new Ludowici tiles that match the original materials to ensure historical accuracy. The roof, situated 272.48 feet above grade with an 8:12 slope and spanning 40 feet in diameter (2,500 square feet), currently features original clay tiles, 15-pound asphalt-impregnated waterproof felt with coal-tar pitch, and 2" nailable precast concrete roof slabs secured with copper nails. The restoration will replace the clay tiles, copper flashings, and potentially the asphaltic waterproofing, while preserving the structural integrity of the precast concrete panels and maintaining the historical character of the Ft. Peck Dam. Comprehensive documentation will be kept throughout the project to track all aspects of the restoration and ensure adherence to historical preservation standards. Site Visit: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation. Site Visit Date, Time and location is listed under FAR 52.236-27. Please respond to Mr. Zachary Watts your intent to attend the site visit. MAGNITUDE OF CONSTRUCTION: The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. Place of Performance: Fort Peck Dam, Valley County, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this pre-solicitation should be made to the Contract Specialist, Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Lynne Reed, who can be reached by email: contact@example.gov.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS