Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fort Riley Tank CoatingsRepair

Closed
W9128F26RA063Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CT
Solicitation # W912WJ26QA164
The U.S. Army Corps of Engineers New England District is soliciting quotes for the removal and replacement of fuel tanks at the Colebrook River Lake gatehouse in Colebrook, Connecticut. The project requires a contractor to provide all labor, materials, and equipment to remove and dispose of one 600 gallon fuel tank, a catch basin containing approximately 300 gallons of fuel, a 10 gallon day tank, a fuel transfer pump, and associated supply lines. These will be replaced with two 275 gallon insulated double walled fuel tanks, a new 10 gallon day tank, grounding systems, a fuel transfer pump, vent pipes, fill whistle, crossover manifold kit, fill caps, fuel level gauges, a tie down kit, and new fuel supply return lines. The work must be completed within a 120 day period of performance and adhere to all local, state, and federal laws. This procurement is a total small business set aside under NAICS code 237120, with a construction magnitude of less than 25,000 dollars. The contract is a firm fixed price agreement. To be considered responsive, all vendors must maintain an active registration in SAM.gov at the time of submission. The solicitation process includes a requirement for a detailed solicitation survey regarding vendor qualifications and a comprehensive safety and accident prevention plan. The deadline for responses is September 15, 2026, at 5:00 PM Eastern.
W2SD Endist New England

POSTED

2 days ago

DEADLINE

in 3 days
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, managed by the USACE Japan Engineer District, is for the Bulk Fuel Storage Tanks Phase II project at Yokota Air Base, Japan. The scope of work involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank, a reinforced concrete pump house containing four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump, and an access tunnel. The project includes the installation of a product saver tank, an automatic tank gauging system, and the necessary piping and control systems to integrate the new facility with the existing filter separator building. The estimated magnitude of the project is between 7.5 and 15 billion Yen, with a period of performance of 1,020 calendar days following the Notice to Proceed. The contract will be awarded using the Lowest Price Technically Acceptable (LPTA) process. To be eligible, offerors must be rated as acceptable across three evaluation factors: construction experience, which requires at least one prime contract for a fuel facility valued at 1 billion JPY or 10 million USD within the last 20 years; system supplier subcontractor experience, requiring five projects completed within the last five years; and satisfactory past performance. Proposals are due by January 25, 2027. Key contractual requirements include adherence to EM 385-1-1 safety procedures, the implementation of a Three Phase Inspection process, and liquidated damages of 615,000 Yen per calendar day of delay. The project carries a priority rating of DO-C2.
W2SN Endist Japan

POSTED

2 days ago

DEADLINE

in 4 months

AI Contract Overview

Show more

The contract is for the repair of internal tank coatings at Fort Riley, Kansas, in compliance with API 653 standards and all applicable federal, state, and local regulations, specifically targeting Facility #8314A (101A). The work must be performed in strict adherence to established industry and governmental guidelines, ensuring structural integrity and regulatory compliance. This solicitation, identified by W9128F26RA063, is a Service-Disabled Veteran-Owned Small Business Set Aside under NAICS code 237120, with responses due by June 25, 2026, at 1400 local time, after an extension from the original deadline. Inquiries must be submitted through ProjNet using the key 9DDJQK-QIPWZG and can no longer be extended beyond June 11, 2026. The contracting office is the U.S. Army Corps of Engineers, Omaha District, located in Omaha, Nebraska, with point of contact for technical and procurement matters being Jaylem Durousseau and Minhthu Vu. The work location is Fort Riley, Kansas, ZIP 66442, and all proposals must be submitted via the SAM.gov portal linked in the solicitation.

General Info

DoD Fort Riley Tank Coatings Repair, SDVOSB set-aside, solicitation closes June 15, 2026.

Agency

Department Of Defense → W071 Endist OmahaView Agency

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

500 Huebner Road, Fort Riley, KS 66442., Fort Riley, KS, 66442, USA

Set-Aside

SDVOSBC

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Organization / Agency
Department Of Defense → W071 Endist Omaha
View Agency Profile
Office AddressOMAHA, NE, 68102-4901, USA

Full Description

Show more

PROJECT TITLE: FORT RILEY TANK COATINGS PROJECT LOCATION: FORT RILEY, KS INTERNAL COATING REPAIRS IAW API 653 STANDARDS AT FORT RILEY, KS INACCORDANCE WITH ALL LAWS STANDARDS, FEDERAL REGULATIONS, AS WELL AS ANY STATE AND LOCAL REGULATIONS AND GUIDELINES. FACILITIES #8314A (101A)



Due date for inquires via ProjNet has been extended to 11 June 2026. No other extensions to inquires will be granted. Proposal due date has been extended to 25 June at 1400. To submit inquiries via ProjNet please go to :  https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicReviewEditSelect&PKeyReview=260546 and use the Quick Add Key 9DDJQK-QIPWZG.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 236220
New
Federal
Industry Feedback for Draft Requirements, Solicitation, and Request for White Papers for Other Transaction (OT) - Initial Minot Sentinel Beddown (IMSB), Minot Air Force Base, North Dakota (ND)
Solicitation # W9128F26SM025
The Initial Minot Sentinel Beddown (IMSB) project suite, managed by the USACE Omaha District, involves the construction of three key facilities at Minot Air Force Base, North Dakota: a Consolidated Vehicle Maintenance Complex, a Security Forces Operations Complex, and an Athletic Complex. These projects support the Ground Based Strategic Deterrent (GBSD) Sentinel Program to modernize the nation's land-based nuclear deterrent. The procurement utilizes a Design-Bid-Build approach under Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a, meaning it is not subject to standard FAR-based contract clauses. The total project suite funding is capped at 203 million dollars, with individual project magnitudes ranging from 5 million to 108 million dollars. Performance periods are specified as 920 calendar days for the Security Forces Operations Complex and 550 calendar days for the Athletic Complex. The government is employing a qualifications-based selection methodology consisting of a two-step evaluation process. Step one involves a comparative evaluation of white papers focusing on bonding capacity, relevant experience, staffing, and execution strategy. Approximately three highly qualified contractors will then be invited to step two, which consists of a pitch meeting to evaluate their understanding of the project suite, subcontractor engagement, and technical approach. The project is structured in two phases, with phase one focusing on pre-construction services and open-book pricing to develop a final construction price for the phase two award. Interested parties must be registered in the System for Award Management (SAM) and possess a valid Unique Entity Identifier. Feedback on the draft requirements and white paper requests was due by September 23, 2026, with the official request for qualifications planned for October 2026.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Federal
Industry Day - Space Force Operations Centers - Various Locations
Solicitation # W9128F26SM026
The USACE Omaha District is conducting market research via solicitation W9128F26SM026 to gauge industry interest and capabilities for the construction of four mission-critical Space Operations Facilities (SOF). These facilities will be located at Grand Forks AFB, North Dakota; Schriever SFB, Colorado; Redstone Arsenal, Alabama; and Kirtland AFB, New Mexico. The total estimated portfolio value is 1 billion dollars, with approximately 250 million dollars allocated per site. The government intends to utilize a Progressive Design-Build approach executed through an Other Transaction Agreement under 10 USC 2808a, which exempts the project from standard Federal Acquisition Regulation clauses. Each facility must meet stringent technical and security standards, including the Uptime Institute Tier III fault-tolerant standard, Protection Level 2 requirements, and ICD 705 standards for secure spaces. Key deliverables for each site include a 500-person secure auditorium, a 6,297 square foot dining area for 24/7 operations, and redundant power and cooling distribution paths. The selection process will be qualifications-based, involving a Request for Qualifications, down-selection based on past performance, and collaborative oral pitches. Interested parties must submit their capabilities narratives, company identifiers, and CMMC status to Sarah Martin by October 15, 2026.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS