Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Freegard Lift Station Emergency Storage

Closed
c18009 – Freegard Lift Station Emergency StorageState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional site responsibilities include clearing and grubbing of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Key operational deliverables include the maintenance of flows and bypass for all pipes and manholes during construction, as well as geotechnical instrumentation and monitoring. The project also requires specific railroad insurance. The bid schedule encompasses general base bid items, sewer base bid items, and contingent items, with primary contact for bid documents and subcontracting opportunities being John Connelly.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, generator, and odor control equipment, as well as the demolition of existing pumps and piping, installation of new gravity sewers and manholes, and various site improvements including stormwater facilities and fencing. The contract is governed by EJCDC standard general and supplementary conditions and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A. The project requires performance and payment bonds, as well as proof of insurance. Contract administration is managed by the City of Belmont with Willis Engineers serving as the representative. Payment is processed via Applications for Payment, with the Engineer reviewing submissions within 10 days and payment becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Bidders must provide a minimum of three similar project references, a detailed Quality Management Plan, and a Timeliness Tracking Plan. The project is subject to Davis-Bacon wage determinations, American Iron and Steel requirements, and strict adherence to OSHA and ADA standards. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract amount.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

Sammamish Plateau Water and Sewer District is soliciting bids for the Freegard Lift Station Emergency Storage project in Issaquah, Washington. The project focuses on increasing operational and emergency storage capacity through the replacement of the existing wet well with a 12-inch diameter precast polymer concrete structure and the installation of a new 12-inch diameter emergency storage wet well to the north. Key infrastructure work includes the construction of a 36-inch PVC sewer pipe connecting the two wells and a 12-inch sewer line from a new 48-inch polymer concrete manhole to ensure continuous station operation during construction. Additionally, the scope includes the installation of an emergency backup Godwin 180M Diesel Pump with associated suction and discharge piping, as well as the installation of Flygt Model ENM-10 float switches. The contract is estimated at approximately 1.5 million dollars and will be awarded to the lowest responsive and responsible bidder. Bids must be submitted via the MRSC Rosters Procurement Portal by October 15, 2026. The successful contractor will be responsible for the shipping, delivery, and acceptance of prepurchased composite concrete structures from Armorock Polymer Concrete, LLC. The project must be physically completed within 210 consecutive calendar days following the Notice to Proceed. Requirements for the award include the provision of performance and payment bonds, adherence to prevailing wage rates, and compliance with bidder responsibility criteria pursuant to RCW 39.04.350.

General Info

Bids for Freegard Lift Station storage project due October 15, 2026, estimated $1.5M.

Documents

2
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Sammamish Plateau Water
Contacts1 person available
OfficeWA, USA
Office AddressWA, USA
Contacts

Full Description

Show more
The proposed project will provide additional operational storage and emergency storage at the Freegard Lift Station site. The existing wet well structure will be replaced with a 12-inch diameter precast polymer concrete wet well and a 36-inch PVC sewer pipe will be constructed to connect the wet well to a new 12-inch diameter precast polymer concrete emergency storage wet well structure to the North. This project also includes the installation of an emergency backup Godwin 180M Diesel Pump with a suction line routed to the wet well expansion and the discharge piping connecting to an existing tee just south of the existing lift station building. A 12-inch sewer line will also be constructed from a new 48-inch polymer concrete manhole into the new emergency storage wet well structure so that the station can remain in operation while the existing wet well is being replaced. Engineering Estimate: ~$1.5M (not including tax) Microsoft Teams Virtual Bid Opening Link: https://teams.microsoft.com/meet/221400019445812?p=WJGJKgGPVpP1sZp5qV Meeting ID: 221 400 019 445 812 Passcode: MR9f9Zf3

More opportunities from Washington → Sammamish Plateau Water

Same awarding agency

NAICS: 541330
New
SLED
RFQ - South Plateau Parallel Conveyance Interceptor - Consultant Design Services
Solicitation # c18009
The Sammamish Plateau Water and Sewer District is soliciting Statements of Qualifications from consultants to provide design services for the South Plateau Parallel Conveyance Interceptor project in Washington. The project involves the installation of approximately 5,000 linear feet of 20-inch low pressure sewer main along SE 43rd Way, extending from the Highland Creek Parallel sewer to the District's Control Structure. This infrastructure is designed to provide redundancy and reduce high velocity flows by splitting the flow path as sanitary sewer volumes increase. The selected consultant will be responsible for developing Plans, Specifications, and Estimates (PS&E) through 30, 60, and 90 percent stages, performing topographic surveys, preparing a geotechnical report, and securing necessary permits from federal, state, and City of Issaquah agencies. The procurement process is based on qualifications rather than price, with the best-qualified consultant selected via an evaluation of their SOQ and potential oral presentations. Submissions are limited to 12 pages, excluding resumes, and must be delivered by November 24, 2026. The contract will utilize the District's Standard Agreement for Consulting Services, which includes detailed monthly billing requirements and a payment term of 45 days. The scope may optionally expand to include inspection and construction support services. Awardees must comply with Title VI of the Civil Rights Act and the Americans with Disabilities Act, and they are required to maintain specific insurance coverages naming the District as an additional insured.
Engineering Services

POSTED

5 days ago

DEADLINE

in 21 days
View Details
NAICS: 424690
SLED
2027 Chemical Supply Contract for Water and Sewer Treatment
Solicitation # RFQ-2026-0001
The Sammamish Plateau Water and Sewer District is soliciting quotes for the sale, delivery, and supply of chemicals for the 2027 calendar year to support potable water treatment and odor control at three sewer lift stations. Under solicitation RFQ-2026-0001, the District will award Material Purchase Agreements to the lowest responsive and responsible bidders for each specific chemical requested. The response deadline is November 13, 2026, with all submissions required electronically via the Beacon Bid portal. Suppliers must adhere to strict quality and packaging standards, including compliance with ANSI/NSF Standard 60 and specific AWWA standards for sodium chloride, sodium fluoride, sodium hydroxide, and ferric chloride. Bagged materials must be delivered on pallet-jack compatible pallets, while other materials may be delivered via tanker truck. Deliveries are scheduled between 8 AM and 2 PM at designated facilities in Sammamish and Issaquah, Washington. The purchase price must include all delivery costs, including fuel and energy surcharges, with a sales tax rate of 10.3% applied at the time of invoice. To qualify, applicants must submit a mandatory Qualification Statement detailing their business experience, UBI number, and past performance. Specific requirements for Liquid Calcium Nitrate include a list of five references with at least three years of experience and detailed technical documentation on hydrogen sulfide control. Additionally, vendors must provide an Affidavit of Compliance and a spill/leak response plan for certain materials. The successful contractor is required to maintain insurance against claims for personal injury or property damage for the duration of the agreement.
Other Chemical and Allied Products Merchant Wholesalers

POSTED

18 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS