Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Freeport Bridge Deck Repair Project

Closed
4702State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Modjeska Grade Road, Road and Drainage Improvements
Solicitation # IFB-080-2914301-MG
The Modjeska Grade Road, Road and Drainage Improvements project, solicitation IFB-080-2914301-MG, is an invitation for bid issued by OC Public Works in California. The scope of work involves comprehensive roadway, drainage, and erosion control improvements, including pavement reconstruction, concrete ditches, storm drain lines, retaining walls, guardrail installation, and utility adjustments. The estimated contract amount is 18,300,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid Amount. Preference policies are available for certified Orange County Local Small Businesses (OCLSB) at 5% and Disabled Veteran Business Enterprises (DVBE) at 8%, with a maximum cap of 100,000 dollars. Bidders must be prequalified and capable of performing at least 51% of the Base Bid Amount with their own organization. Required submissions include a 10% bid security, a proposed staffing plan, and various certifications, including the Iran Contracting Act and Campaign Contribution Disclosure forms. The project adheres to Caltrans, AASHTO, or ASTM testing methods, with quality assurance managed by the David Dixon Memorial Materials Laboratory. The bid deadline was extended to November 10, 2026. Key administrative requirements include a valid UEI number, California Secretary of State registration in good standing, and a DIR Public Works Registration Number.
OC Public Works

POSTED

about 13 hours ago

DEADLINE

in 11 days
NAICS: 237310
New
SLED
Citywide Accessibility Improvements No. 13
Solicitation # PJ2817
The Citywide Accessibility Improvements No. 13 project (Project No. PJ2817/Contract No. 6771) is a public works initiative by the City of Concord, California, focused on accessibility upgrades at various city locations. The scope of work includes mobilization, site preparation, clearing and grubbing, earthwork, and the installation of concrete curbs, curb ramps, and sidewalks. Additional requirements involve pruning tree roots, adjusting utility covers to finish grade, applying thermoplastic pavement markings, installing roadside signs, and implementing water pollution control and traffic management programs. The estimated construction cost is between $350,000 and $400,000, with a strict completion timeline of 25 working days anticipated to begin around February 2027. The contract will be awarded to the responsible bidder providing the lowest responsive bid. Qualified bidders must hold a valid California Class A or C-8 contractor license and be registered with the DIR. Key administrative requirements include the provision of performance and payment bonds for 100 percent of the contract price and adherence to federal prevailing wages under the Davis-Bacon Act. The project is subject to strict compliance with Caltrans Standard Specifications, City of Concord standards, and federal non-discrimination and equal opportunity clauses. Failure to meet the completion deadline will result in liquidated damages of $2,322 per day.
Community Development - Engineering

POSTED

about 14 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Freeport Bridge Deck Repair Project involves addressing structural damage identified during a recent routine inspection of the bridge. Specifically, repair work is required for damaged deck welds located at the centerline of the bridge span, as well as maintenance on the pins, rollers, and joint armor situated at each end of the bridge to ensure continued operability. This solicitation, issued by the California Department of General Services’ Construction division, targets qualified contractors to perform the necessary repairs, with a bid response deadline set for late February 2026. The project is managed by the Sacramento office of the agency, with Tim Stevens, Senior Civil Engineer, serving as the primary point of contact, supported by Jesse Sanchez, Senior Contract Services Officer. The contract includes strict adherence to federal non-discrimination laws and regulations, as outlined in the Title VI Assurances document. Contractors must comply with U.S. Department of Transportation and Federal Highway Administration requirements, ensuring all subcontracting and procurement activities are free from discrimination, accompanied by necessary reporting and sanctions provisions to enforce these commitments. This comprehensive framework assures equity and legal compliance throughout the project duration.

General Info

Freeport Bridge Repair project seeks contractors to fix deck welds, pins, rollers; bids due February 2026.

Documents

7

4702 Freeport Bridge Deck Repair Project - Notice to Contractors

PDF, High priority: read this first13 pages · rfb
High

4702 Freeport Bridge Deck Repair Project Plans

PDF, High priority: read this first6 pages · specifications
High

FHWA-1273 Required Contract Provisions for Federal-Aid Construction Contracts 10.2023

PDF, High priority: read this first14 pages · contract-document
High

Special Provisions for Freeport Bridge Deck Repair Project Contract No. 4702

PDF, High priority: read this first43 pages · special-provisions
High

AdTech Advertising System New Print Order 4008814

PDF, Low priority1 page · other
Low

Attachment 2 Title VI Assurances

PDF, Low priority4 pages · contract-document
Low

Notice to Contractors for Sacramento County Project

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → DGS: CAPSD - Construction
Contacts2 people available
OfficeSacramento, CA, 95827, USA
Office AddressSacramento, CA, 95827, USA
Contacts
Tim StevensSenior Civil Engineer
Jesse SanchezSr. Contract Services Officer

Interested Companies (18)

Certified CoatingsFairfield, CA
Golden State BridgeBenicia, CA
AnrakSACRAMENTO, CA

See All 18 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
During the most recent routine bridge inspection, damage to the deck welds was discovered at the centerline of the bridge span. Additionally, the pins, rollers, and joint armor at each end of the bridge need repair to maintain the operability of the Freeport Bridge.

More opportunities from California → DGS: CAPSD - Construction

Same awarding agency

NAICS: 561730
New
SLED
Hazel Avenue At U.S. 50 Interchange Segment 1 Tree Removal Project
Solicitation # 41022
The Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project, solicitation number 41022, is a CUPCCAA project issued by the County of Sacramento. The project involves providing all labor, materials, and equipment for tree removal in Rancho Cordova, California, with an estimated construction cost of $150,000.00. The scope of work includes traffic control, the installation of 954 linear feet of ESA fencing, and the removal of trees, with stumps left two feet above grade. All debris must be hauled away and legally disposed of. To avoid nesting season, trees must be cut down before January 31st; any removals after February 1st require engineer approval and an agency survey. The contractor is responsible for field marking all trees for verification by the engineer and must ensure no damage occurs to underground facilities or existing improvements. Bids are due electronically via SacCountyEbids by November 12, 2026, at 2:00 PM, and the award will be based on the base bid only. Eligible contractors must possess a C-49 or C-61/D-49 California contractor's license and provide Certificates of Reported Compliance regarding CARB Advanced Clean Fleets regulations. The project has a completion timeframe of twenty working days and must be finished before February 1, 2027. Liquidated damages for delays are set at $2,800.00 per day. Required security includes a bid bond, certified check, or cash for 10 percent of the aggregate bid, with the successful bidder required to provide performance and payment bonds for 100 percent of the contract price. The contractor must also comply with prevailing wage rates, ADA accessibility laws, and Caltrans encroachment permit requirements.
Landscaping Services

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 238210
SLED
Main Jail – Hall of Justice – Refurbish Existing Pipe Chase Leak Detection System
Solicitation # 41010
The County of Sacramento is soliciting bids for solicitation number 41010 to refurbish the non-functional Raychem Tracetek leak detection system for sanitary and pressure water lines at the Main Jail facility located at 651 I Street. The project involves replacing the leak detection panel in the basement and refurbishing water sensing cables, zone connectors, leader cables, and control monitoring modules within pipe chases. The system must be integrated with the facility building management system for alarm and fault monitoring. The estimated construction cost is 148,590.00 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. The work must be completed within 90 calendar days and requires a C-7 Low Voltage Systems Contractor license and technicians certified by the system manufacturer. Due to the secure nature of the correctional environment, the project is subject to strict security protocols. All personnel must pass background checks, be escorted while onsite, and coordinate activities with the Sacramento Sheriff Organization. Work on the second and third floors is restricted to the hours of 12pm to 4pm. Safety requirements include the use of N95 or P-100 respirators in designated pipe chases. Bidders must submit responses via the SacCountyEbids portal by November 5, 2026. The successful contractor is required to provide performance and payment bonds for 100 percent of the contract price and submit as-built drawings and test results for final acceptance.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

17 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS