Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Freshwater Intake Pipeline Maintenance

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the California State Lands Commission involves the maintenance and leak detection of two freshwater intake pipelines located in Lake Tahoe. The selected provider will be responsible for inspecting pipeline integrity, cleaning intake screens, and repairing corrosion or leaks using specialized underwater inspection tools and PVC or HDPE piping. The primary objective is to deliver an operational, leak-free intake system while strictly adhering to water quality standards to prevent environmental contamination. This project falls under NAICS code 237110 and is focused on ensuring the long-term functionality of critical water infrastructure for prime contractors.

General Info

Maintenance and leak detection for two Lake Tahoe freshwater intake pipelines for CSLC.

Agency

California State Lands Commission

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of L8469.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Issuance of General Lease – Recreational Use – Lease 8469

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State Lands Commission
ContactsNo contacts available
OfficeN/A
Organization / Agency
California State Lands Commission
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs maintenance and leak detection for two freshwater intake pipelines for prime contractors on California State Lands Commission projects in Lake Tahoe. Inspects pipeline integrity, cleans intake screens, and repairs leaks or corrosion using underwater inspection tools and PVC/HDPE piping. Maintains water quality standards to prevent contamination. Delivers an operational and leak-free intake system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 9 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional technical requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The contractor is responsible for electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, as well as the excavation of cobbles and large boulders. This solicitation, managed by James W. Fowler Co., is open to small businesses, including certified service-disabled veteran-owned, minority-owned, and women-owned enterprises. Bids are due by September 29, 2026, and the project encourages the use of apprentices and provides support for M/W/DBE subcontractors regarding bonding, insurance, and materials.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 25 days
View Details