Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FSH Remove and Install Air Handler Cooling Coil at B1620

Closed
FA301624Q0131Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe in both the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, and applicable federal, state, and local regulations. Contractors are responsible for all cutting, patching, and debris removal, ensuring that all materials used are new and of commercial quality. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid valid for at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, W-9, business licenses, Massachusetts plumbing credentials, and certificates of liability insurance. The project is subject to various Federal Acquisition Regulation clauses, including the Davis-Bacon Act and Service Contract Act for prevailing wages, and requires the submission of weekly certified payroll reports. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. Performance and payment bonds are required for projects exceeding 35,000 dollars, with specific requirements increasing for projects over 150,000 dollars.
Westover Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 9 days

General Info

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

0, TX, 78234, USA

Set-Aside

SBA

Documents

4

Reference Pictures - Air Handler Cooling Coil B1620

PDF, High priority: read this firstspecifications
High

RFQ FA301624Q0131 - Remove and Install Air Handler Cooling Coil

PDF, High priority: read this first38 pages · rfq
High

SOW - Air Handler Cooling Coil Replacement B1620 JBSA Fort Sam Houston

PDF, High priority: read this firstsow
High

Wage Determination 2015-5253 Revision 24

PDF, High priority: read this first11 pages · wage-determination
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Larissa Showers
Lauren Macias

Full Description

Show more
This is a combined synopsis solicitation Notice. Description of the service: The contractor shall provide all licensed labor, tools, hardware, and equipment necessary to complete the removal and installation of a new cooling coil that shall be supplied by 502 CES on air handler unit which is currently on site at Building 1620, JBSA Fort Sam Houston. The contractor shall ensure compatibility and dimensions of the new coil, safely disconnect power, disconnect piping, remove old coil, install new one, inspect and clean mounting area, reinstall panels, pressure test and leak check, confirm proper operation, and maintain a clean work site. The contractor shall comply with all relevant codes, regulations, standards, and criteria. If interested and capable of fulfilling the requirements listed in the statement of work (SOW), please complete the attached RFQ and return to the listed POCs no later than 10:00am CDT, 09 August 2024. Questions shall be submitted in writing via email NLT 05 August 2024 at 10:00 am CDT. Please refer to the following attachments for all pertinent information: RFQ Document SOW Reference pictures Wage Determination 2015-5253 Rev 24

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS