Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ft. Bliss BLDG 2479 Kitchenette Installation Amendment 03

Closed
W911RX-26-B-A002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to correct HVAC and plumbing deficiencies. The project also encompasses the installation of new signage and ensures all work complies with ADA accessibility guidelines. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeframe of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The contractor is required to provide performance and payment bonds equal to 100 percent of the contract price and must adhere to specific prevailing wage rates for the Georgia region. Quality control is strictly managed through a required Construction QC Plan, with a multi-stage inspection process including punch-out, pre-final, and final acceptance inspections. Proposals must be submitted electronically to the contracting officer by November 9, 2026.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project encompasses site improvements such as paving removal and replacement, drainage upgrades, water, sanitary, and storm system repairs, and hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price, evaluated by combining the costs for building renovation and paving replacement. Bidders must adhere to Davis-Bacon Act wage determinations and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Contractors must submit a Quality Control Plan for approval prior to construction and utilize a three-phase control process for each Definable Feature of Work. Invoicing is managed through Wide Area Work Flow with specific NAVFAC form requirements.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 27, 2026, with a response deadline of November 4, 2026. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if they fail to include proof of GFE #2, requiring solicitations to be posted in an online publication for 30 consecutive calendar days and in a print newspaper for one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) per GFE #5 must be submitted with the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing. Prime contractors are further required to flow down these GFE requirements to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement of drywall, painting, ceiling tiles, flooring, and rubber wall bases, as well as electrical and plumbing restoration to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and adherence to Davis-Bacon Act wage determinations. Contractors must provide a one-year workmanship guarantee and a 20-year product warranty for Luxury Vinyl Plank flooring.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The U.S. Army’s Mission and Installation Contracting Command at Fort Riley, Kansas, is soliciting bids for the installation of two kitchenettes in Building 2479 at Fort Bliss, Texas, under a firm-fixed-price contract set aside entirely for small businesses. The scope includes supplying and installing complete kitchenettes with sinks featuring hot and cold running water, upper and lower cabinets with food-preparation-grade countertops, 220v electrical wiring to support electric ranges, and a fire suppression system. All work must comply with regulatory codes, safety standards, and environmental requirements, including adherence to updated asbestos and lead survey data provided in attachments. The contract duration is 180 days from the notice to proceed, with performance expected to commence on November 1, 2026, and conclude by April 1, 2027. Bids must be submitted as a single hard-copy volume with specific tabbed sections, including pricing, bonding documentation, and digitally signed drawings, and must be hand-delivered to the specified Fort Bliss location between 7:30 AM and 11:00 AM MDT on July 28, 2026; mail submissions require prior email notification of tracking information. The North American Industry Classification System code is 236220 with a $45 million size standard, and the solicitation is a total small business set-aside under FAR 19.5. Contractors must comply with a range of federal and Department of Defense clauses, including anti-kickback procedures, suspension of work, changes and changed conditions, termination for convenience, and security requirements. The contract includes provisions for potential extension of services up to six months and requires key personnel qualifications, quality control plans, and documentation of all work through progress reports, shop drawings, test results, and as-built submissions. Payment will be processed through the Wide Area WorkFlow system, and inspections will be conducted by government representatives at the designated acceptance location. No contract value is stated, and pricing is to be submitted by offerors as part of their bid, with liquidated damages of $1,717.24 per day for delays. All amendments to the solicitation, including revised drawings, statements of work, and bid question responses, must be reviewed by potential bidders prior to submission.

General Info

Department of Defense seeks small business for kitchenettes installation at Fort Bliss, 180-day fixed-price contract.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Fort Bliss, TX, 79916, USA

Set-Aside

SBA

Documents

24

Amendment 0001 to Solicitation W911RX26BA002

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W911RX26BA002

PDF, High priority: read this firstamendment
High

As Built Drawings for Barracks Modernization Buildings Fort Bliss TX

PDF, High priority: read this firstas-built-drawings
High

Attachment 07 - Drawing of Building 2479 Kitchenette Installation

PDF, High priority: read this firstspecifications
High

Bldg 2479 Asbestos and Lead-Based Paint Survey Report

PDF, High priority: read this first42 pages · specifications
High

Davis-Bacon Act Wage Determination TX20260245

PDF, High priority: read this firstwage-determination
High

Environmental Review 11B 10118 6P W911RX26BA002

PDF, High priority: read this firstenvironmental-review
High

Fort Bliss Fire Prevention Construction Guide 2025

PDF, High priority: read this firstfire-prevention-guide
High

iWATCH Army Training for Contractors - June 2019

PDF, High priority: read this firsttraining-material
High

Material Approval Submittal Form for Contract W911RX26BA002

PDF, High priority: read this firstmaterial-approval-submittal
High

RFI Template Blank Form V.1.2 W911RX26BA002

PDF, High priority: read this firstrfi
High

Solicitation W911RX26BA0020001 - Install Kitchenette Building 2479

PDF, High priority: read this firstifb
High

Solicitation W911RX26BA0020002 - Install Kitchenette Building 2479

PDF, High priority: read this firstifb
High

Solicitation W911RX26BA002 - Install Kitchenette Building 2479

PDF, High priority: read this firstifb
High

SOW B2479 Kitchenette Installation Rev2 07172026

PDF, High priority: read this firstsow
High

Statement of Work for Kitchenette Installation at Fort Bliss Bldg 2479

PDF, High priority: read this firstsow
High

W911RX26BA0020003 - Amendment 03

PDF, High priority: read this first6 pages · amendment
High

W911RX26BA0020003 - Kitchenette Install Building 2479

PDF, High priority: read this first76 pages · ifb
High

W911RX-26-BA002 Industry Q&A Document 22JUL2026

PDF, High priority: read this firstq-and-a
High

W911RX-26-BA002 Industry Q&A Document for Kitchenette Installation

PDF, High priority: read this firstq-and-a
High

Asbestos and Lead-Based Paint Survey Report Building 2478 Fort Bliss TX Feb 2012

PDF, Low prioritysurvey-report
Low

Building 2479 Limited Asbestos & Lead Sampling Report

PDF, Low priorityspecifications
Low

W911RX26BA002 - Fort Bliss Bldg 2479 Asbestos Notification

PDF, Low priorityother
Low

Attachment+03-ENG_FORM_4288-R+W911RX26BA002.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Riley
Contacts2 people available
OfficeFORT RILEY, KS, 66442-0248, USA
Office AddressFORT RILEY, KS, 66442-0248, USA
Contacts
Joni N. Wardosky
Travis E Engle

Full Description

Show more

The mission and Installation Contracting Command (MICC)- Ft. Riley, KS is issuing a solicitation for an Invitation for Bids (IFB) to award a single firm-fixed-price contract to install new kitchenettes at Building 2479, Ft Bliss TX.  Install kitchenettes at building 2479 that will include a sink with running hot/cold water and upper and lower cabinets with countertops appropriate for food preparation. Install 220v wiring to support electric range and fire suppression system. The Contractor shall provide all work, labor, materials, related fees, and related services for construction requested herein until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract, by the Government in a professional and collaborative environment to sustain mission requirements. Construction services and finished products shall be delivered on schedule, safely, and compliant with regulatory codes and standards.  The contract duration is 180 days after notice to proceed. This project is a Total Small Business set aside. The North American Industry Classification System (NAICS) code is 236220, with a size standard of $45,000,000.00.  The solicitation will result in a Firm-Fixed-Price (FFP) contract.


-All questions and requests for information (RFI) must be received NO LATER THAN 13 July 2026 at 10:00 AM CST. 


-Any bids hand-delivered between 07:30 AM and 11:00 AM MDT on the due date shall only be delivered to the bid opening room at: MICC-Fort Bliss, Room 220, 111 Pershing Rd. Fort Bliss, TX 79916.  If you will be mailing your bid via UPS, USPS, or FedEx, please e-mail tracking number to Daniel Garcia at contact@example.gov & Joni Wardosky at contact@example.gov.


-Invitation for Bid No: W911RX-26-B-A002 Due Date of Bids: 28 July 2026 Time by which Bids are due: 11:00 AM MDT


Updates:


Amendment 03 provides updated Attachment 02 and additional attachments.


Attachment 02: Asbestos and Lead Survey UPDATE Building 2479


Attachment 13: Ltd Asbestos-Lead Survey Bldg 2479 


Attachment 14: Project closeout report



Amendment 02 provides updated clarification to vendor bid questions, only two kitchen installations are required for building 2479.


(Includes updates to Attachment 11)



Amendment 01 answers vendor bid questions, provides updated SOW and updates to the drawing for building 2479.


(Includes two additional attachments):


Attachment 11- Bid Questions and Answers


Attachment 12- Asbuilt drawings and specifics.

More opportunities from Department Of Defense → W6QM Micc-Ft Riley

Same awarding agency

NAICS: 212321
Federal
Aggregate Stone Material - Fort Riley, Kansas
Solicitation # W911RX27QA002
Solicitation W911RX27QA002 is a Firm-Fixed Price requirements contract set aside 100% for small businesses under NAICS 212321. The contract covers the procurement, hauling, and delivery of various aggregate stone and sand materials, specifically AB-3, SA-1, SS-5, and Fill Sand (FA-3), to multiple Directorate of Public Works locations at Fort Riley, Kansas. These materials are essential for maintaining base road infrastructure, tactical trails, and erosion control. The period of performance begins January 1, 2027, and consists of a base year with four subsequent option years. Award will be determined based on the Lowest Price Technically Acceptable (LPTA) criteria, evaluating technical capability, past performance, and total evaluated price. The contractor is responsible for all transportation costs under FOB Destination terms and must utilize cleaned, tight-bed dump trucks or semi-trailers to prevent leakage and adhere to weight limits. Deliveries must commence within five business days of order issuance, following a 3-to-5-day advance notice. All materials must meet strict gradation, moisture, and purity standards, with laboratory certification required prior to initial delivery and certified weight tickets provided upon delivery. Contractors must comply with Fort Riley special requirements, including mandatory insurance per FAR 52.228-5, pollution prevention, and security badge protocols. Invoicing and payment will be processed electronically through the Wide Area WorkFlow (WAWF) system.
Construction Sand and Gravel Mining

POSTED

9 days ago

DEADLINE

in 11 days
View Details
NAICS: 562111
Federal
FY27 APOD Solid Waste - Fort Polk
Solicitation # W911RX-27-Q-1CJ4
The Mission and Installation Contracting Command Fort Riley is seeking sources for a non-personal services contract to provide solid waste management at the Aerial Port of Debarkation England Airpark, located at Alexandria International Airport in Alexandria, Louisiana. This total small business set-aside requirement involves the collection, transportation, and disposal of solid waste. The contractor must furnish at least seven 40-cubic-yard roll-off containers, with the ability to provide seven additional units if requested. Key operational requirements include collecting large bulky items at least once weekly, performing unscheduled collections within four duty hours of notification, and transporting all waste to a permitted facility within three days of collection. The contractor is required to provide a Program Manager and an Alternate Program Manager, with specific availability hours for both non-rotational and rotational periods. Essential deliverables include a Quality Control Plan, a Safety Plan, and Anti-Terrorism Level I Training, all due within 30 days of award. Compliance with FAR 52.236-13 for accident prevention and OSHA standards for personal protective equipment is mandatory. Additionally, vehicle operators must hold valid licenses, with a Louisiana State Commercial Driver's License required for vehicles rated at 2.5 tons or those hauling hazardous materials. The government will evaluate performance based on a Performance Requirements Summary, specifically monitoring vehicle appearance and ensuring that APOD waste is not commingled with other sources.
Solid Waste Collection

POSTED

14 days ago

DEADLINE

in about 7 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS