This Solicitation opportunity from Colorado was posted on April 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum 01 - Project 2024-079M23 (IFB1-NHAA-2025000182): Addendum No. 01 dated April 8, 2025, for the Ft. Lyon Wastewater Treatment facility aeration brushes, motors, and metal walkway replacement. This document updates technical specifications (Section 11300), postpones the bid due date to April 15, 2025, and provides clarifications regarding the requirement for a direct drive conversion and the replacement of aeration brushes.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Appendix D1 - Prevailing Wage Rates for Colorado Building Construction 2024: This document is Appendix D1 containing prevailing wage rates for building construction projects in various counties of Colorado for the year 2024. It supersedes General Decision Number C020230001 and includes wage rates for multiple trades such as asbestos workers, bricklayers, carpenters, electricians, elevator mechanics, ironworkers, laborers, glaziers, cement masons, and plumbers. The document references compliance with Executive Orders 14026 and 13658 regarding minimum wage requirements for federal contracts subject to the Davis-Bacon Act. It provides detailed wage and fringe benefit rates by county and trade classification, along with modification publication dates throughout 2024. The document is essential for contractors to determine the minimum wages payable under federal construction contracts in Colorado.
XLSX
XLSX, High priority: read this firstwage-determination
HighAI Summary for Appendix D - CO Apprenticeship Contribution Rates 2024-January: A schedule of apprenticeship contribution rates for various trades in Colorado, effective January 2024. It lists specific rates for unions including Boilermakers, Bricklayers, Carpet/Linoleum Layers, Glaziers, and Painters, along with trade descriptions and geographic regions.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Appendix G - Ft. Lyon Partial Site Plan: A partial site plan for Fort Lyon, Colorado, issued on June 16, 2020, by T.A. Duke & Associates, Inc. The document details circulation and parking changes, including curb and gutter replacement and road resurfacing, and includes a detailed site map with building identifiers and infrastructure markers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix H - Ft Lyon WWTP Brushes Bid Set: Technical bid set containing diagrams and images of the existing aeration brush motor shed, bearing support sump, and oxidation ditch cross-sections for the Ft Lyon Wastewater Treatment Plant (WWTP).
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB1-NHAA-2025000182 - Ft. Lyon Waste Water Treatment Facility Renovations: Invitation for Bid (IFB) issued on 3/21/2025 for the renovation of the Ft. Lyon waste water treatment facility. The project involves replacing aeration brushes, motors, walkway grating, and handrails with an estimated cost of $435,000. Includes minimum requirements for prime contracting experience, bonding capability of $500,000, and a mandatory pre-bid meeting on 3/26/25. Sealed bids are due by 4/11/25 via Rocky Mountain BidNet Direct.
DOCX
DOCX, High priority: read this firstbid-bond
HighAI Summary for Project 2024-079M23 - Bid Bond Form: A standard Bid Bond form for the State of Colorado Department of Local Affairs, Project #2024-079M23 (Ft. Lyon Wastewater Treatment facility aeration brushes, motors and metal walkway replacement). The document requires a guaranty of 5% of the total bid price and specifies that failure to provide a properly executed bond and power of attorney will result in the proposal being deemed non-responsive.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for Project 2024-079M23 - Ft. Lyon Wastewater Treatment Facility Agreement: This is a State of Colorado Contractor's Design/Bid/Build (D/B/B) Agreement (State Form SC-6.21) for the Department of Local Affairs. The project involves the replacement of aeration brushes, motors, and metal walkways at the Ft. Lyon Wastewater Treatment facility (Project # 2024-079M23). The document outlines the performance of work, contract sum, time of completion, and includes various exhibits for bonds, insurance, and prevailing wage determinations.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for Project 2024-079M23 - Ft. Lyon Wastewater Treatment Facility Bid Form: Official bid form for the State of Colorado Department of Local Affairs, Project #2024-079M23. The procurement involves the replacement of aeration brushes, motors, and metal walkways at the Ft. Lyon Wastewater Treatment facility. The document includes fields for base bid pricing, completion timelines, and certifications regarding Colorado labor requirements, SDVOSB status, and bid guarantees.
DOCX
DOCX, High priority: read this firstifb
HighAI Summary for Project 2024-079M23 - Ft. Lyon Wastewater Treatment Facility Information for Bidders: This document provides bidding instructions for the Ft. Lyon Wastewater Treatment facility aeration brushes, motors and metal walkway replacement (Project # 2024-079M23) for the Colorado Department of Local Affairs. It outlines requirements for bid form submission via Box.com, bid security (5% for bids over $50,000), 'or equal' substitutions, and the method of award based on the lowest responsible bidder considering additive and deductible alternates.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Project 2024-079M23 - State Labor Burden Calculation: A State of Colorado Office of the State Architect form for the Department of Local Affairs regarding the Ft. Lyon Wastewater Treatment facility project (#2024-079M23). This document requires contractors and major subcontractors to provide a detailed labor overhead percentage (taxes, pensions, insurance, etc.) to be used in the construction agreement and for calculating future Change Order Proposals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 11300 - Oxidation Ditch Brush Replacement (2024-079M23): Technical specifications for the replacement of two aeration brushes, drives, and seals in an existing Oxidation Ditch. The document details quality assurance, submittals, acceptable installers (Veolia/Copperstate), equipment components (15 hp motors, 9 ft brush assemblies), installation requirements, and performance testing.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.23 General Conditions of the Contractor’s Design/Bid/Build Agreement: This document establishes the General Conditions for the State of Colorado Office of the State Architect's Design/Bid/Build (D/B/B) agreements. It outlines comprehensive contractual obligations, including definitions, insurance requirements, payment processes, change orders, dispute resolution, and termination procedures.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyColorado → DOLA - Division of Housing - Public Housing Agency