Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Justice was posted on April 27, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FUEL TANK MONITORS

Closed
15B30223Q0000005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

about 19 hours ago

DEADLINE

in 3 months
NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

4 days ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Threemile Slough Pipeline Crossings Remediation and Decommissioning ProjectThe Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.
California State Lands Commission

POSTED

4 days ago

DEADLINE

N/A
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

11 days ago

DEADLINE

in 9 days
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

11 days ago

DEADLINE

in 9 days

General Info

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

Coleman, FL, 33521, USA

Set-Aside

SBA

Documents

4

FCC Coleman Fuel Storage Tank Monitoring Systems Solicitation

DOCX, High priority: read this firstrfq
High

FCC Coleman - Replace Tank Monitors SOW

PDF, High priority: read this firstsow
High

RFQ - Replace Fuel Tank Monitors - FCC Coleman

DOCX, High priority: read this firstrfq
High

Solicitation 15B30223Q00000005 - Fuel Monitoring System Installation

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → FCC Coleman
Contacts2 people available
OfficeCOLEMAN, FL, 33521, USA
Office AddressCOLEMAN, FL, 33521, USA

Full Description

Show more
SCOPE OF WORK FEDERAL CORRECTIONAL COMPLEX, COLEMAN, FLORIDA PROJECT 23Z3AS5 REPLACE TANK MONITORS April 15, 2023 1. DESCRIPTION OF REQUIREMENT / SPECIFICATIONS A. INTRODUCTION Gregory Lux Digitally signed b Gregory Lux Date: 2023.04.19 14:56:52 -04'00' The Federal Bureau of Prisons (FBOP), Federal Correctional Complex, Coleman, Florida (FCC Coleman) located at 846 NE 54th Terrace, Coleman, Florida in Sumter County intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to install new fuel storage tank monitoring systems at three (3) 10,000 gallon diesel storage tanks, one located at the FPC Remote Utility Building (RUB) and the other two (2) tanks located at the FCI Low RUB. Repairs shall comply with Federal, state, and local regulations, codes, and standards. This contract will consist of supply and install. B. BACKGROUND INFORMATION During periodic inspection, the fuel monitors failed. Due to the age of the monitoring systems, complete replacement of these systems is required. New tank monitoring system shall comply with all Federal, State of Florida, and local regulations and law, particularly, Florida Department of Environmental Protection, which is the Authority Having Jurisdiction (AHJ) C. GOVERNMENT FURNISHED PROPERTY FCC Coleman will not provide any materials or labor needed to complete the work identified in the Description of Requirement. FCC Coleman will provide one staff to escort Contractor's personnel at each RUB. Electrical service from standard duplex outlets, normal city water from sink faucets and spigots, and toilet facilities shall be provided by FCC Coleman, if needed. . D. DESCRIPTION OF REQUIREMENT FCC Coleman requires the contractor awarded this contract to perform the following services. At the FPC RUB and at the FCI Low RUB, contractor shall: - Replace existing Incon tank monitoring system. - Contractor will coordinate with the customer to mobilize men, material and equipment to the site. - Contractor shall create an appropriate work area will be with secured with visual or vehicular barricades at each RUB. - Contractor shall lockout/tagout the electrical power to the existing Incon tank monitoring systems at RUB - Contractor shall dismount the existing Incon and install in its place, a new Vendeer Root TLS4B Unit at each RUB. - Contractor shall provide and install a new external printer which shall be mounted onto the wall next to the new TLS4B unit at each RUB. - Contractor shall disconnect the existing level probe, and leak sensor at each RUB. - Contractor shall furnish and install a new probe, float unit, and leak sensor to include new mounting hardware into the tank at each RUB. The FCI Low RUB has two (2) tanks that will need new probe, float unit, and leak sensor to include mounting hardware into the tanks. Both tanks at the FCI Low RUB can operate of the one new TLS4B Unit for that RUB. U. S. Department of Justice Federal Bureau of Prisons FCC Coleman, Florida 23Z3AS5 Replace Tank Monitors - Contractor shall make connections utilizing the existing conduit, wire will be new shielded Belden type at each RUB and tank. If existing conduit is found to be unsuitable, the unsuitable items will be replaced / repaired at an additional cost to the customer upon approval. - Contractor shall startup and commission the new equipment at each RUB. - Contractor shall program the new TLS4B system and checked for proper operation at each RUB. - Upon successful startup, Contractor shall provide training to a customer representative on the operation of new TLS4B system at each RUB. - Contractor shall clean up all debris generated from work at both RUBs and dispose of debris off FBOP property and in compliance with Federal, State, and local regulations. - Contractor shall then demobilize from the FBOP property. - Contractor shall provide to FCC Coleman operability paperwork for submission to the FDLEP for each fuel storage tank, for a total of three. - All labor, material, and equipment to complete the work described herein shall be included in the contractor's bid. Any materials or equipment needed to complete this work, not specifically identified, shall be provided by the Contractor at no additional cost to the Government. - Final payment will not be processed until all written certifications and testing have been received by the Complex Facility Manager. Contractor shall supply the following fuel storage tank monitoring system, and associated parts, etc., for the FPC RUB storage tank (1 tank), or a FBOP approved technical equivalent system. Contractor shall provide a completely operational system to monitor and report fuel storage tank levels, including, but not limited to: - 1 ea.: Veeder Root TLS 4B Console (Max 6 probes / 6 2-wire sensors) or a FBOP approved technical equivalent system. - 1 ea.: TLS4B Console, Color Touch Screen Display, EDIM, UL (Part #860196-020) or a FBOP approved technical equivalent system. - 1 ea.: TLS4B Application Software, 6 Universal Inputs - must order one per console (Part #333435-001) - 1 ea.: External Printer for TLS4 Series Consoles (Epson Model: TM-T88V) (Part # 330020-832) or a FBOP approved technical equivalent system. - 1 ea.: Wall Mounting Bracket for External Printer for TLS4 Series Consoles (Part #330020-839) - 1 ea.: SS Probe, 0.1 Mag Plus, HGP Canister, Water Detection, UL, ANY STD LENGTH (Part #846397-1xx) - 1 ea.: Install. Kit, Mag Plus, Diesel, 4" Float, 5' Cable (Part #846400-001) - 1 ea.: Mag Probe Installation Kit for Aboveground Storage Tank (Part #312020-984) - 1 ea.: Interstitial Sensor for Steel Tanks (4'-12' Tank I.D.) with 16' Cable (Part #794390- 420) - 1 ea.: 2" Interstitial Sensor Riser Cap and Adaptor Kit (Part #312020-928) Contractor shall supply the following fuel storage tank monitoring system, associated parts, etc. for the FCI Low RUB storage tanks (2 tanks), or a FBOP approved technical equivalent system. Contractor shall provide a completely operational system to monitor and report fuel storage tank levels, including, but not limited to: - 1 ea.: Veeder Root TLS 4B Console (Max 6 probes / 6 2-wire sensors) or a FBOP approved technical equivalent system. Page 2 of 6 U. S. Department of Justice Federal Bureau of Prisons FCC Coleman, Florida 23Z3AS5 Replace Tank Monitors - 1 ea.: TLS4B Console, Color Touch Screen Display, EDIM, UL (Part #860196-020) or a FBOP approved technical equivalent system. - 1 ea.: TLS4B Application Software, 6 Universal Inputs - must order one per console (Part #333435-001) - 1 ea.: External Printer for TLS4 Series Consoles (Epson Model: TM-T88V) (Part # 330020-832) or a FBOP approved technical equivalent system. - 1 ea.: Wall Mounting Bracket for External Printer for TLS4 Series Consoles (Part #330020-839) - 2 ea.: SS Probe, 0.1 Mag Plus, HGP Canister, Water Detection, UL, ANY STD LENGTH (Part #846397-1xx) - 2 ea.: Install. Kit, Mag Plus, Diesel, 4" Float, 5' Cable (Part #846400-001) - 2 ea.: Mag Probe Installation Kit for Aboveground Storage Tank (Part #312020-984) - 2 ea.: Interstitial Sensor for Steel Tanks (4'-12' Tank I.D.) with 16' Cable (Part #794390- 420) - 2 ea.: 2" Interstitial Sensor Riser Cap and Adaptor Kit (Part #312020-928) Name brand components are identified above in this Scope of Work, as they are known to be compatible with the existing systems. While other components may be proposed by bidders as - a technical equivalent system, it is the Contracting Officer Representative's decision if - technical equivalent to specified is approved or rejected by the FBOP. E. QUALITY ASSURANCE/INSTALLATION REQUIREMENTS Compliance with all environmental regulations, Life Safety codes, NFPA, OSHA, ABA, and Federal, State, and Local codes and regulations will be required for the duration of this contract. Services and materials provided by the Contractor will adhere to and shall be consistent with the most current industry standards. 2. CONTRACTOR SECURITY/WORKING REGULATIONS A. Security Clearances All Contractor's personnel coming onto Federal property must successfully pass a security clearance (NCIC). Security clearance paperwork shall be submitted to the Contracting Officers Representative (COR) within seven (7) calendar days of the Award of Contract. The Contractor awarded the contract should plan on security clearances being completed within fourteen (14) working days from submittal of a fully completed NCIC packet. NCIC clearances must be successfully processed prior to any personnel coming onto the FCC Coleman property. In addition to security clearance compliances addressed elsewhere in this solicitation, the following conditions are specific to FCC Coleman. 1. Security clearance documents will only be accepted from the Contractor awarded the contract. If the services are subcontracted out to another Contractor, the Prime Contractor awarded the contract must submit the security clearance forms to the FBOP. If submitted by any other Contractor, they will be rejected. The Prime Contractor awarded the contract has the responsibility to review the security clearance submissions to ensure they are filled out completely and signed prior to submitting to the FBOP for processing. 2. In the event a contractor's employee cannot pass the security clearance process, they will not be permitted to work on this contract or be on FCC Coleman property. Page 3 of 6 U. S. Department of Justice Federal Bureau of Prisons FCC Coleman, Florida 23Z3AS5 Replace Tank Monitors By law, the FBOP cannot, and will not, release any information to the Contractor concerning the nature of why the rejected employee was not able to pass the security clearance process. 3. Residency Requirements - The residency requirement applies to both individuals and employees of companies providing services to the FBOP. For three (3) of the five (5) years immediately prior to submission of your bid, individuals and/or Contractor employees providing services in any Federal Bureau of Prisons facility must have: a. resided in the United States (U.S.). b. worked for the U.S. overseas in a Federal or military capacity; or c. been a dependent of a Federal or military employee serving overseas. B. Work Hours Work Hours shall be between the hours of 6:30 AM and 3:30 PM EST, Monday through Thursday, excluding Friday, Saturday, Sunday, and any Federal holiday. Should the Contractor need to access the site to conduct work associated with this contract at a time other than those listed above, the Contractor will request an alternate time in writing to the COR five (5) working days prior to the date and time requested. Contractors should plan for a minimal amount of time accrued for security considerations, i.e., check-in screening, inventorying of tools, institution emergencies, etc. In the event of an institution emergency, depending on the type of emergency, the Contractor may be instructed to secure all work, secure and stow all tools, equipment, and materials, and be escorted out of the institution. Work will resume once the institution emergency passes. The decision to remove Contractors from the institution during an institutional emergency will be made by the Captain or his designee. All work under this project is outside the secured perimeter fence; therefore, the delays typically experienced by contractors processing into an institution will NOT likely be experienced by the contractor for the duration of this contract. Contractor's personnel should bring all materials, supplies, tools, incidentals, etc. with them each day. C. Tool Control All tools will be inventoried at the beginning and end of each work period, or when departing one work area for another work area, to ensure accurate accountability prior to exiting the institution and/or each department area. Should a tool become missing, Contractor's personnel will not be permitted to leave the work site until the tool is found or a search has been completed for the missing tool to the satisfaction of the on-duty Chief of Correctional Services or Operations Lieutenant. The Government will not incur any additional charges because of searching for a lost tool due to the negligence of the Contractor's personnel. D. Safety and Personal Protective Equipment All Contractor's employees shall have and wear the required personal protective equipment (PPE) prescribed by industry standards, OSHA, etc., always while on the job site. It is the responsibility of the Contractor to provide all PPE equipment. Should a system require Lock- out/Tag-out, the system will be required to have both Contractor and FCC Coleman locks on the isolation point to prevent shock. All Lock-out/Tag-out procedures will follow the institution Lock- Out/Tag-Out program. E. Additional Considerations Page 4 of 6 U. S. Department of Justice Federal Bureau of Prisons FCC Coleman, Florida 23Z3AS5 Replace Tank Monitors Contractors will NOT be allowed to bring cell phones, cameras, or two-way radios/pagers into the secured perimeter of any FCC Coleman institution. The Facilities Department maintains a digital camera that may be utilized by the Contractor, should it be needed. The Contractor may request copies of these documentation photographs for record keeping. Contractor will be permitted to wear jeans in the institution; however, shorts, camouflaged clothing, offensive clothing, or clothing that is dark green, bright orange, or khaki in color are prohibited, as these are the color of clothing worn by inmates. The clothes will be proper and suitable for the services that are being provided. Smoking policy on Federal property states that smoking is only allowed in outdoor designated areas. This policy will be strictly enforced. Lighters, tobacco products, and electronic/vapor cigarettes are not permitted inside the perimeter fences and should remain secured in the Contractor's locked vehicle. Illegal drugs, weapons, and firearms of any kind are strictly prohibited on Federal property. Introduction of contraband, which is anything inmates are prohibited from possessing (such as, cell phones, cigarettes, alcohol, pornographic material, etc.), into a correctional facility is a Federal felony offense. Violators will be prosecuted to the fullest extent of the law. F. COVID-19 As of the date of this Description of Requirement, there is no daily COVID-19 screenings being conducted. Contractor's personnel should police themselves for COVID-19 symptoms, and if symptoms are present, those personnel should not report to work. Contractors should be prepared to wear a mask covering nose and mouth when social distancing of 6 feet or more cannot be maintained, especially when encountering the inmate population. As COVID-19 is a fluid situation, these requirements can increase or decrease at any given time. FCC Coleman has three stages of COVID-19 operations: Green, Yellow, and Red with Green being the least restrictive and Red being the most restrictive. As of the date of this Description of Requirement, FCC Coleman is operating at the Green Level. Should Red Level be implemented, all Contractor's personnel will be required to complete a medical screening every day they come onto FCC Coleman property. The medical screening consists of three medical questions and a temperature reading. More intense medical screenings may be imposed at a future date, which cannot be known as of the date of this Scope or Work. Any personnel that fail the medical screening currently in effect will not be allowed on the property to work for that day. The decision of the screening staff is final and not open for discussion or exceptions. Should a Contractor's personnel begin to develop typical symptoms related to COVID-19 during the workday, they must immediately inform the escorting FBOP staff. The Contractor's personnel will be assessed by FBOP Medical staff. If the FBOP Medical staff determine the Contractor's personnel is highly likely to be infected with COVID-19, they will immediately be escorted from the property. That Contractor's personnel will not be allowed back on the property for a minimum of ten (10) calendar days and only if after ten days they are asymptomatic. The decision of the medical staff is final and not open for discussion or exceptions. Protecting our staff and inmates from the introduction of COVID-19 is our top priority. As this is a fluid situation with regular changes, more intense medical screenings and/or restrictions may be imposed at a future date, based on guidance from the Center for Disease Control (CDC), the World Health Organization (WHO), and/or the Central Office of the Federal Bureau of Prisons. Any future required Page 5 of 6 U. S. Department of Justice Federal Bureau of Prisons FCC Coleman, Florida 23Z3AS5 Replace Tank Monitors Page 6 of 6 Personal Protective Equipment (PPE), as with current non-pandemic related PPE, will be the responsibility of the Contractor awarded this contract to provide for their staff, ensure their staff have adequate PPE and required training, and to maintain required documentation as required by OSHA, CDC, or any other Authority Having Jurisdiction (AHJ).

More opportunities from Department Of Justice → FCC Coleman

Same awarding agency

NAICS: 311991
Federal
FCC Coleman FY26 December Produce
Solicitation # 15B30226Q00000005
Solicitation 15B30226Q00000005 is a Small Business Set-Aside Request for Quote issued by the Department of Justice, Federal Bureau of Prisons, for the procurement of fresh produce for the Federal Correctional Complex Coleman in Florida. The requirement covers a variety of produce items, including apples, cabbage, carrots, lettuce salad mix, potatoes, and tomatoes, all of which must meet or exceed specific U.S. grade standards and packaging requirements. All deliveries must be palletized and wrapped, and wooden crates are strictly prohibited. The procurement will be conducted via an online competitive reverse auction through the Unison Marketplace, with pricing bids due by November 25, 2025, at 11:00 AM Eastern Time. The period of performance for the second quarter of 2026 runs from January 1 through March 31, 2026. Deliveries are organized into four distinct schedules ranging from single shipments to weekly deliveries every Monday and Tuesday between 7:30 AM and 12:00 PM. Strict temperature controls are required, with non-frozen perishables maintained between 34 and 40 degrees Fahrenheit and frozen foods at 0 degrees Fahrenheit or below. Award is based on the lowest price among responsive bidders who meet all technical specifications. Failure to adhere to delivery schedules or quality standards will be documented as a performance issue and may result in the rejection of items and re-award to the next lowest bidder. Invoices must be submitted via mail or email, as faxed invoices are not accepted.
Perishable Prepared Food Manufacturing

POSTED

11 months ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS