Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 3, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FXSB 17-4704 Repair Tank Farm 3 and 4

Closed
FA500023B0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

about 20 hours ago

DEADLINE

in 3 months
NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

4 days ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Threemile Slough Pipeline Crossings Remediation and Decommissioning ProjectThe Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.
California State Lands Commission

POSTED

4 days ago

DEADLINE

N/A
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

11 days ago

DEADLINE

in 9 days
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

11 days ago

DEADLINE

in 9 days

General Info

Contract Value

$26,377,544.14

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

JBER, AK, 99506, USA

Set-Aside

8A

Award Issued Date

Documents

29

AK20230001 Wage Determination - Alaska

PDF, High priority: read this first18 pages · wage-determination
High

Attachment 21 - Clarification to Specifications

PDF, High priority: read this first1 page · amendment
High

Attachment 3 - Specifications REV001

PDF, High priority: read this first2071 pages · specifications
High

Attachment 9 - Project Price Breakdown

PDF, High priority: read this first2 pages · specifications
High

Drawing Index - Attachment 2 Drawings 1

PDF, High priority: read this firstspecifications
High

FA500023B00010003 Amendment SF 30

PDF, High priority: read this firstamendment
High

FA500023B00010004 Amendment 0004

PDF, High priority: read this firstamendment
High

FA500023B0001 Amendment 0001

PDF, High priority: read this first6 pages · amendment
High

FA500023B0001 Amendment 0002

PDF, High priority: read this first3 pages · amendment
High

FA500023B0001 Attachment 5 AF 66 Submittal Register

PDF, High priority: read this first77 pages · specifications
High

FA500023B0001 Attachment 6 - Class J&A ALC

PDF, High priority: read this first5 pages · justification-and-authorization
High

FA500023B0001 - Repair Fuel Farms 3 and 4 SOW

PDF, High priority: read this first76 pages · sow
High

FA500023B0001 - Repair Tank Farms 3 and 4

PDF, High priority: read this first62 pages · ifb
High

Fuel Farm #3 Electrical Demolition Plan (ESD-151)

PDF, High priority: read this firstspecifications
High

JBE057/058 Asbestos and Hazardous Materials Survey

PDF, High priority: read this first74 pages · specifications
High

JBER Tank Farm 3 and 4 - Round 2 Q&A

PDF, High priority: read this first8 pages · q-and-a
High

Site-Specific Spill Plan - JBER

PDF, High priority: read this first1 page · specifications
High

Wage Determination AK200300001 - Renovate Polar Bowl B7176

PDF, High priority: read this first14 pages · wage-determination
High

Wage Determination AK20230001

PDF, High priority: read this first14 pages · wage-determination
High

2019 JBER Environmental Handbook (4th Edition)

PDF, Low priorityspecifications
Low

Attachment 18 - Attachments for A33

PDF, Low priority1 page · other
Low

Class J&A for Automated Logic Controls (ALC) Components - JBER

PDF, Low priority4 pages · justification-and-authorization
Low

FA500023B0001 - Abstract of Offers: Repair Tank Farm 3 and 4

PDF, Low priority1 page · abstract-of-offers
Low

FXSB 17-4704 Repair Tank Farms 3 and 4 - Pre-bid Site Visit Sign-In Sheet

PDF, Low priorityindustry-day
Low

J&A for ENRAF Fuel Tank Gauge System

PDF, Low priority3 pages · justification-and-authorization
Low

J&A for Veeder Root Fuel Tank Monitoring System

PDF, Low priority7 pages · justification-and-authorization
Low

JBER 2022 Environmental Restoration Program Atlas

PDF, Low priorityspecifications
Low

JBER Spill Reporting Poster

PDF, Low priority1 page · other
Low

Repair Tank Farms 3 and 4 Questions and Answers

PDF, Low priority14 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jun 28, 2023 to Jul 19, 2023. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 19, 2023 to Jul 26, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5000 673 Cons Lgc
Contacts2 people available
OfficeJBER, AK, 99506-2501, USA
Office AddressJBER, AK, 99506-2501, USA

Full Description

Show more
AMENDMENT 0004 The pupose of this amendment is to: 1. Provide an updated Wage Determination AK20230001 2. Extend the bid due date to 1 August 2023 at 1300 (AKDT) ------------------------------------------------------End of Amendment 0004--------------------------------- AMENDMENT 0003 The purpose of this amendment is to: 1. Provide Attachment 21 - Clarification to Specifications ------------------------------------------------------End of Amendment 0003--------------------------------- AMENDMENT 0002 The purpose of this amendment is to: 1. Provide an updated Wage Determination AK20230001, dated 23 June 2023 2. Provide Attachment 17 - RTA ED151 3. Provide Attachment 18 - Attachments for A33 4. Provide Attachment 19 - JBER 2022 Atlas Map Book 5. Provide Attachment 20 - Round 2 of Questions Tank Farm 3 & 4 6. Extend the bid due date to 26 July 2023 at 1300 (AKDT) ------------------------------------------------------End of Amendment 0002--------------------------------- AMENDMENT 0001: The purpose of this amendment is to: 1. Extend the bid due date to 19 July 2023 at 1300 (AKDT). 2. Offer additional time to receive questions. New questions are due on 26 June 2023 at 1300 (AKDT). 3. Add Clause 52.204-27 Prohibition on a ByteDance Covered Application Jun 2023 4. Update Attachment 1 - Wage Determination AK200300001 5_19_2023 5. Update Attachment 3 - Specifications REV001 6. Add Attachments 10 - Site Specific Spill Plan 7. Add Attachment 11 - JBER Spill Reporting Poster 8. Add Attachment 12 - 2019 JBER Environmental Handbook 9. Add Attachment 13 - JBE057_058_Asbestos_Final 10. Add Attachment 14 - Sign-in Sheet 11. Add Attachment 15 - Questions and Answers 12. Add Attachment 16 - Class J&A ALC ------------------------------------------------------End of Amendment 0001--------------------------------- IAW DFAR 236.204(i), Disclosure of Magnitude of Construction Projects, the estimated price range of this between $10,000,000 and $25,000,000. Payment and Performance bonds shall be obtained IAW FAR 28.102. Requirement / Description Contractor shall provide all labor, materials, equipment, hardware, software and programming necessary to provide fully functional repairs for Tank Farms 3 and 4 as detailed in the attached Statement of Work (Attachment 1), drawings (Attachment 2), and specifications (Attachment 3). The purpose of this project is to consolidate the bulk JP-8 and Ultra-low Sulfur Diesel (ULSD) storage and issue capabilities of Fuel Farm #3 and Fuel Farm #4. The existing bulk storage Underground Storage Tank (USTs) at Fuel Farm #3 and #4 are of 1950s vintage and have reached the end of their service life. The Fuel Farm #3 and #4 aviation and bulk ULSD infrastructure will be demolished, along with the underground JP-8 transfer pipeline, and reconstructed as a consolidated system at the Fuel Farm #4 area. The consolidated facility will have six 50,000-gallon double-wall USTs for JP-8 storage and one 25,000-gallon double-wall UST for ULSD storage. A new filter building with control room and motor control center (MCC) will also be constructed at Fuel Farm #4. A new truck loading and offloading area will be provided for ULSD receipt and issue west of the existing truck fill stands. Additionally, a return to bulk station will be constructed at the existing JP-8 truck fill stand. In place of Fuel Farm #3, a new Retail Station with two ULSD and two JP-8 dispensers will be constructed. The existing USTs for retail sales will be reused. The new service station building will contain an office, bathroom, and eyewash station. Site Visit: IAW FAR 52.236-27 SITE VISIT (Construction) Alternate I (Feb1995). If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic provision: (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Bidders are urged and expected to inspect the site where the work will be performed. (b) An organized site visit has been scheduled for 24 May 2023 at 10:00AM AKDT. i. If interested parties would like to attend the site visit and requires temporary base access, please contact Christopher Nelson at Christopher.Nelson.70@us.af.mil at least three (3) days prior to the site visit. (c) Participants will meet at BLDG 10480 Sijan Avenue in RM 211. After a brief discussion, all parties will be escorted to the site where the work will be performed. Questions Due Date: Due to the importance of maintaining the schedule for this project, it is requested that all questions regarding the specifications and/or drawings be submitted by 10:00 AM AKDT, Thursday, 1 June 2023. All questions must be in writing and shall be emailed to Christopher.Nelson.70@us.af.mil and Brian.Barcelona@us.af.mil with the SUBJECT identified as "FA500023B0001 - QUESTION". Any questions received after the above date and time are at the discretion of the Contracting Officer. Requests for hardcopies of the solicitation, specifications, drawings, and amendments (if applicable) will not be honored.

More opportunities from Department Of Defense → FA5000 673 Cons Lgc

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS