Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

FY 2023/24 Sewer Lining Project

Closed
CC-1777State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the installation of a GD Membrane Bio-Reactor wastewater treatment plant, including new process facilities, instrumentation and control systems, electrical infrastructure, and administrative support buildings. The scope of work encompasses comprehensive site preparation, grading, paving, fencing, and improvements to the facility access road, as well as the complete demolition and removal of existing infrastructure once the new plant is accepted. The project includes a 12-month operational support period and requires strict adherence to Department of the Interior cybersecurity requirements, ADA and ABA accessibility standards, and union prevailing wage rates. The contract is a firm-fixed-price award with a magnitude of construction exceeding 100 million dollars. The period of performance is scheduled from February 1, 2027, to February 1, 2030, with a total performance duration of 1095 calendar days after the notice to proceed. Award selection will be based on a multi-factor, best-value tradeoff process evaluating technical experience, past performance, and proposed pricing. Offerors must provide performance and payment bonds and identify key personnel, including a Project Manager, Superintendent, and specialists in quality control, safety, and historic preservation. Proposals are submitted in two volumes, with technical evaluations focusing on the relevance of project experience and the contractor's capability to manage a project of this scope and complexity.
Dsc Contracting Services Division

POSTED

1 day ago

DEADLINE

in 21 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

8 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

16 days ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The FY 2023/24 Sewer Lining Project for the City of Huntington Beach involves rehabilitating existing sewer pipelines through advanced lining techniques, primarily UV and CIPP methods. The project covers approximately 13,500 linear feet of 8-inch pipes for UV lining and around 9,900 linear feet of various sizes (8, 10, and 12 inches) for CIPP lining, targeting pipes affected by calcium deposits, minor cracks, joints with tree root intrusion, and groundwater seepage. The work also includes grinding and re-opening approximately 506 service laterals and rehabilitating about 86 manholes to ensure proper sewer function and longevity. The locations for the work are detailed in accompanying maps included in the bid package. The solicitation was posted on March 17, 2025, with a response deadline of April 10, 2025. The project is estimated to have a contract value between $2.5 million and $4.5 million and is managed under the NAICS code 221320, which pertains to water and sewer line construction. The primary contact for inquiries is Joe Fuentes, reachable via email at [email hidden] or by phone at [phone hidden]. The project aims to address pipe scaling, root intrusion, and joint issues to improve sewer system reliability and performance across designated locations in California.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Huntington Beach
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The project consists primarily of lining existing sewer pipes based on maintenance history and video inspection. This project will use a combination of UV and CIPP lining technologies. Total linear footage for UV lining is estimated at approximately 13,500 LF of 8”. Total footage for CIPP is estimated at approximately 9,900 LF combined among 8”, 10”, and 12”. The locations of work are shown in the accompanying maps included in the bid package. These locations would benefit from lining as the existing pipes are either scaled with calcium deposits from groundwater seepage through pipe and minor cracks and joints, or have joints intruded with tree roots from adjacent mature trees located on parkways. Additional items include grinding and re-opening approximately 506 service laterals and rehabilitating approximately 86 manholes.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS